September 13, 2002 Mr. Mano Nazar Site Vice President Prairie Island Nuclear Generating Plant Nuclear Management Company, LLC 1717 Wakonade Drive East Welch, MN 55089
SUBJECT:
PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 -
CORRECTION TO AMENDMENT NOS. 158 AND 149 REGARDING CONVERSION TO IMPROVED TECHNICAL SPECIFICATIONS
Dear Mr. Nazar:
On July 26, 2002, the Commission issued Amendment No. 158 to Facility Operating License No. DPR-42 and Amendment No. 149 to Facility Operating License No. DPR-60 for the Prairie Island Nuclear Generating Plant, Units 1 and 2. These amendments converted the Technical Specifications (TSs) for Prairie Island, Units 1 and 2, to improved TSs.
The purpose of this letter is to make two corrections to Pages B-2 (of Appendices B, "Additional Conditions," to both licenses) which were issued with Amendment Nos. 158 and 149. First, Pages B-2 were incorrectly numbered. These pages should have been numbered as B-3 instead of B-2. Secondly, the date of July 26, 2002, should have been included in the license conditions for Amendments Nos. 158 and 149 related to the relocation of TS requirements to a licensee-controlled program. This date reflects the date of the Nuclear Regulatory Commission staffs safety evaluation.
Please replace Pages B-2 that were issued with Amendment Nos. 158 and 149 with the enclosed corrected Pages B-3.
Sincerely,
/RA/
Tae Kim, Senior Project Manager Project Directorate III-1 Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-282 and 50-306
Enclosure:
Replacement Pages B-3 for Amendment Nos. 158 and 149 cc w/encl: See next page
September 13, 2002 Mr. Mano Nazar Site Vice President Prairie Island Nuclear Generating Plant Nuclear Management Company, LLC 1717 Wakonade Drive East Welch, MN 55089
SUBJECT:
PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 -
CORRECTION TO AMENDMENT NOS. 158 AND 149 REGARDING CONVERSION TO IMPROVED TECHNICAL SPECIFICATIONS
Dear Mr. Nazar:
On July 26, 2002, the Commission issued Amendment No. 158 to Facility Operating License No. DPR-42 and Amendment No. 149 to Facility Operating License No. DPR-60 for the Prairie Island Nuclear Generating Plant, Units 1 and 2. These amendments converted the Technical Specifications (TSs) for Prairie Island, Units 1 and 2, to improved TSs.
The purpose of this letter is to make two corrections to Pages B-2 (of Appendices B, "Additional Conditions," to both licenses) which were issued with Amendment Nos. 158 and 149. First, Pages B-2 were incorrectly numbered. These pages should have been numbered as B-3 instead of B-2. Secondly, the date of July 26, 2002, should have been included in the license conditions for Amendments Nos. 158 and 149 related to the relocation of TS requirements to a licensee-controlled program. This date reflects the date of the Nuclear Regulatory Commission staffs safety evaluation.
Please replace Pages B-2 that were issued with Amendment Nos. 158 and 149 with the enclosed corrected Pages B-3.
Sincerely,
/RA/
Tae Kim, Senior Project Manager Project Directorate III-1 Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-282 and 50-306
Enclosure:
Replacement Pages B-3 for Amendment Nos. 158 and 149 cc w/encl: See next page DISTRIBUTION PUBLIC OGC RDennig PDIII-1 Reading ACRS CSchulten LRaghavan WBeckner TKim GHill(4)
RBouling RLanksbury, RGN-III ACCESSION NO.: ML022590537
- No legal objection OFFICE PDIII-1/PM PDIII-1/LA OGC/NLO*
PDIII-1/SC NAME TKim RBouling RWeisman LRaghavan DATE 08/28/02 08/28/02 09/09/02 09/11/02 OFFICIAL RECORD COPY
Prairie Island Nuclear Generating Plant, Units 1 and 2 cc:
J. E. Silberg, Esquire Shaw, Pittman, Potts and Trowbridge 2300 N Street, N. W.
Washington, DC 20037 Site Licensing Manager Prairie Island Nuclear Generating Plant Nuclear Management Company, LLC 1717 Wakonade Drive East Welch, MN 55089 Adonis A. Neblett Assistant Attorney General Office of the Attorney General 455 Minnesota Street Suite 900 St. Paul, MN 55101-2127 U.S. Nuclear Regulatory Commission Resident Inspectors Office 1719 Wakonade Drive East Welch, MN 55089-9642 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351 Administrator Goodhue County Courthouse Box 408 Red Wing, MN 55066-0408 Commissioner Minnesota Department of Commerce 121 Seventh Place East Suite 200 St. Paul, MN 55101-2145 Tribal Council Prairie Island Indian Community ATTN: Environmental Department 5636 Sturgeon Lake Road Welch, MN 55089 Mr. Roy A. Anderson Executive Vice President and Chief Nuclear Officer Nuclear Management Company, LLC 700 First Street Hudson, WI 54016 Nuclear Asset Manager Xcel Energy, Inc.
414 Nicollet Mall Minneapolis, MN 55401 March 2002
APPENDIX B ADDITIONAL CONDITIONS FACILITY OPERATING LICENSE NO. DPR-42 Amendment Number Additional Conditions Implementation Date 158 The schedule for performing Surveillance Requirements (SRs) that are new or revised in Amendment No. 158 shall be as follows:
For SRs that are new in this amendment, the first performance is due at the end of the first surveillance interval, which begins on the date of implementation of this amendment.
For SRs that existed prior to this amendment, whose intervals of performance are being reduced, the first reduced surveillance interval begins upon completion of the first surveillance performed after implementation of this amendment.
For SRs that existed prior to this amendment that have modified acceptance criteria, the first performance is due at the end of the surveillance interval that began on the date the surveillance was last performed prior to the implementation of this amendment.
For SRs that existed prior to this amendment, whose intervals of performance are being extended, the first extended surveillance interval begins upon completion of the last surveillance performed prior to the implementation of this amendment.
October 31, 2002 158 The licensee is authorized to relocate certain Technical Specification requirements previously included in Appendix A to licensee-controlled documents, as described in Table LR, "Less Restrictive Changes - Relocated Details," and Table R, "Relocated Specifications," attached to the NRC staffs safety evaluation dated July 26, 2002.
Those requirements shall be relocated to the appropriate documents no later than October 31, 2002.
October 31, 2002 158 The licensee will complete evaluation of the maximum test face velocity for the ventilation systems included in Technical Specifications (TS) Section 5.5.9 by February 28, 2003. The licensee will also submit a license amendment request for TS amendment by February 28, 2003, to specify the maximum test face velocity if the maximum actual face velocity is greater than 110 percent of 40 fpm based on the licensees evaluation.
February 28, 2003 B-3 Amendment No. 158 l
APPENDIX B ADDITIONAL CONDITIONS FACILITY OPERATING LICENSE NO. DPR-60 Amendment Number Additional Conditions Implementation Date 149 The schedule for performing Surveillance Requirements (SRs) that are new or revised in Amendment No. 149 shall be as follows:
For SRs that are new in this amendment, the first performance is due at the end of the first surveillance interval, which begins on the date of implementation of this amendment.
For SRs that existed prior to this amendment, whose intervals of performance are being reduced, the first reduced surveillance interval begins upon completion of the first surveillance performed after implementation of this amendment.
For SRs that existed prior to this amendment that have modified acceptance criteria, the first performance is due at the end of the surveillance interval that began on the date the surveillance was last performed prior to the implementation of this amendment.
For SRs that existed prior to this amendment, whose intervals of performance are being extended, the first extended surveillance interval begins upon completion of the last surveillance performed prior to the implementation of this amendment.
October 31, 2002 149 The licensee is authorized to relocate certain Technical Specification requirements previously included in Appendix A to licensee-controlled documents, as described in Table LR, "Less Restrictive Changes - Relocated Details," and Table R, "Relocated Specifications," attached to the NRC staffs safety evaluation dated July 26, 2002.
Those requirements shall be relocated to the appropriate documents no later than October 31, 2002.
October 31, 2002 149 The licensee will complete evaluation of the maximum test face velocity for the ventilation systems included in Technical Specifications (TS) Section 5.5.9 by February 28, 2003. The licensee will also submit a license amendment request for TS amendment by February 28, 2003, to specify the maximum test face velocity if the maximum actual face velocity is greater than 110 percent of 40 fpm based on the licensees evaluation.
February 28, 2003 B-3 Amendment No. 149 l