WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only (Xi Both 2 )

Y 1\

it tiCFrPr w

. van. I 41 in

. . . v

-z_ 10CFR55.43 X Memory/Fundamental Comprehension/Analysis Proposed Question (Refer to Attachment 2)

Which one of the following identifies the minimum RPV water level requirements to assure adequate core cooling during a high power ATWS per SSES Emergency Operating Procedures?

RPV water level must be maintained at or above the:

a. Feedwater sparger elevation
b. MSIV isolation setpoint
c. Top of Active Fuel
d. Minimum Zero Injection Reactor Water Level Page 1 of 1

Proposed Answer Reference(s) EO-000-1 13 LQ/L1 7

c. TAF assures ACC during ATWS strategy PPOO2 Discuss Distracters
a. target Ivi to reduce subcooling and power
b. Ivi where MSIVs would close
d. only applicable in non-ATWS EO-100-102 RO SRO I Tier # 1 Tier #

1 Group # I Group #

295031 K/A 295031 K/A EK1 .01 EK1 .01 4.6 I-rating 4.7 I-rating K&A Statement Knowledge of the operational implications of the following concepts as they apply to REACTOR LOW WATER: Adequate core cooling SSES Cross-Reference Learning Objective(s) # 2625 I, BANK QUESTION (attach question)

LI SSES exam bank Question #

L INPO exam bank Question # =

f Other facility exam bank Facility a Previous NRC exam Facility and date of exam El Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

L SSES exam bank Question #

El INPO exam bank Question #

El Other facility exam bank Facility El Previous NRC exam Facility and date of exam L Previous audit exam Facility and date of exam X NEW QUESTION An attachment to the examination will be required to answer this question.

YES X NO Attachment required is:

Page 1 of 1

Review and Validation Comments TRG - No comments OPS - No comments Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment I (Form ES-401-6 comparable)

RO only SRO only X X 10CFR55.41. 10 10CFR55.43

--Memory/Fundamental XComprehension/Analyis Proposed Question 4R~feF49,Attehint Q)

While operating at 100% RTP on Unit 2 the following conditions occur:

  • AR-210-E3 MAIN STEAM DIV II SRV OPEN annunciator is extinguished 0 SRV/ADS temperature recorder indicates 295 F for SRV A and -1 35 F for the 0

remaining SRVs

  • 2C601 Acoustic Monitor red lights are all extinguished
  • RPV pressure is 1035 psig and stable Which one of the following identifies the status of the SRVs and the appropriate actions to be taken for this condition?
a. An SRV is open, initiate an immediate plant shutdown.
b. An SRV is leaking, initiate an immediate plant shutdown.
c. An SRV is open, initiate an AR for engineering to evaluate.
d. An SRV is leaking, initiate an AR for engineering to evaluate.

Page 1 of 1

Proposed Answer Reference(s) AR-110-001 E01

d. correct - leaking indications per AR and TM-OP-083-ST pg. 14 paper work for evaluation would be generated Discuss Distracters
a. incorrect condition, action for open SRV per ON-283-001 would require scram
b. incorrect action for leaking SRV plant shut down not required
c. incorrect condition SRV is not open RO SRO 2 Tier # 2 Tier #

1 Group # 1 Group #

239002 K/A 239002 K/A A2.02 A2.02 3.1 I-rating 3.2 I-rating K&A Statement Ability to (a) predict impacts of the following on the RELIEF/SAFETY VALVES; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Leaky SRV SSES Cross-Reference Learning Objective(s) # 10021 b , 10240(3) _, I BANK QUESTION (attach question)

I1 SSES exam bank Question #

D: INPO exam bank Question #

DOther facility exam bank Facility DPrevious NRC exam Facility and date of exam D Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

DSSES exam bank Question # .

F INPO exam bank Question # .

aI Other facility exam bank Facility LI Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam .

X: NEW QUESTION An attachment to the examin uired to answer this question.

YES NO Page 1 of 1

Attachment required is:

Review and Validation Comments TRG - Modified choice c and d to "initiate a CR for engineering to evaluate' Modified choice a and b to 'initiate an immediate plant shutdown" Capitalized Acoustic Monitor in stem conditions OPS - changed CR to AR Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only B X 10CFR55.41.10 10CFR55.43

- --Memory/Fundamental Proposed Question (ofr rhmnt 2)

During a Loss of Coolant Accident the following plant conditions exist on Unit 1:

  • Drywell pressure is 23 psig and rising.
  • Suppression chamber pressure is 15 psig and rising.
  • RPV pressure 300 psig and slowly dropping.
  • RHR Loop 1A injection valve has been overridden closed.
  • RHR Loop 1A inlet pressure to the HX A (PI-E1 -1R606A1) is 40 psig and steady.
  • RHR pump IA and 1C have been overridden off.
  • RHR Loop 1B is not available.

Containment spray has been directed using Loop 1A. Which one of the following describes the status of RHR Loop 1A pressure and pump restart capability?

a. Normal, a pump can be immediately started for spray operation.
b. Normal, a pump can NOT be immediately started for spray operation.
c. Abnormally low, a pump can be immediately started for spray operation.
d. Abnormally low, a pump can NOT be immediately started for spray operation.

Page 1 of 1

Proposed Answer Reference(s) OP-149-004 section

d. with loop pressure <50 psig loop must be 3.4 isolated prior to pump start to re-pressurize TM-OP-049-ST pg. 40 loop, normal pressure is -150 psig Discuss Distracters
a. loop pressure is low and isolation is required prior to start
b. loop pressure is low
c. isolation is required prior to start RO SRO 2 Tier # 2 Tier #

2 Group # 1 Group #

226001 K/A 226001 K/A A4.09 A4.09 2.8 I-rating 2.7 I-rating K&A Statement Ability to manually operate and/or monitor in the control room:

Pump discharge pressure SSES Cross-Reference Learning Objective(s) # 197d , II BANK QUESTION (attach question)

FI SSES exam bank Question # .

LI INPO exam bank Question #

3I Other facility exam bank Facility LI Previous NRC exam Facility and date of exam L1 Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

LI SSES exam bank Question #

L INPO exam bank Question #

LI Other facility exam bank Facility LI Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam Xi NEW QUESTIOND An attachment to the examin awil~rpquired to answer this question.

YES Q NO)

Page 1 of 1

Attachment required is:

Review and Validation Comments TRG - Reduced DW pressure from 29 to 23 psig in stem conditions Deleted 'slowly" from stem condition wording for SC pressure trend OPS - added unit identifier to components and Pi # to HX inlet pressure Changed "Drywell" spray to "Containment" Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only X4 Both 3 L X 10CFR55.41.7 10CFR55.43

..Memory/Fundamental XComprehension/Analysi Proposed Question f)

During Unit 1 startup at 10% RTP, Reactor Recirculation loop 1A pump discharge valve (F031A) inadvertently strokes full closed. Which one of the following describes the expected automatic response of the Recirculation system including the RPT breakers?

a. Only A pump drive motor breaker trips, A pump RPT breakers also trip.
b. Only A pump drive motor breaker trips, A pump RPT breakers remain closed.
c. Both A and B pump drive motor breakers trip, both pump RPT breakers also trip.
d. Both A and B pump drive motor breakers trip, both pump RPT breakers remain closed.

Page 1 of 1

Proposed Answer Reference(s) TM-OP-064C-ST pg.

b. discharge valve interlock trips associated 9 pump drive motor but not RPT bkrs Discuss Distracters
a. RPT bkrs trip on Turbine trip >30% RTP or ATWS signals only
c. discharge valve interlock trips associated pump drive motor and RPT bkrs trip on Turbine trip >30% RTP or ATWS signals only
d. discharge valve interlock trips associated pump drive motor RO SRO 2 Tier # 2 Tier #

2 Group # 2 Group #

202001 K/A 202001 K/A A3.07 A3.07 3.3 I-rating 3.3 I-rating K&A Statement Ability to monitor automatic operations of the RECIRCULATION SYSTEM including: Pump trips SSES Cross-Reference Learning Objective(s) # 2522q , 2558m __, _I BANK QUESTION (attach question)

L SSES exam bank Question #

LI INPO exam bank Question #

L Other facility exam bank Facility L Previous NRC exam Facility and date of exam L Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

L SSES exam bank Question #

L INPO exam bank Question #

LI Other facility exam bank Facility LI Previous NRC exam Facility and date of exam .

LI Previous audit exam Facility and date of exam QjNEWjQTlO An attachment to the exami e quired to answer this question.

YES NO Page 1 of 1

Attachment required is:

Review and Validation Comments TRG - Reworded stem to solicit correct answer without eliminating choice c and d. Now asks for Recirc system response including RPT breakers.

Changed wording in stem from "while the associated loop" to "with the associated loop".

OPS - Arranged stem to clarify that plant is being started up not pump Removed reference to discharge bypass valve position Removed 'trip" after RPT Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only B X 1 OCFR55.41.7 10CFR55.43 Memory/Fundamental Crehe eionionaly Proposed Question (for to ,^ttochmnt 2)

While operating at 100% RTP on both units the normal power supply breaker to the "2B" ESS bus spuriously trips and the alternate supply breaker fails to automatically close.

Which one of the following describes how this transient will effect the "B" Emergency Diesel Generator and it's associated output breaker to the "2B" ESS bus?

a. Diesel will auto start and the output breaker will auto close on the bus.
b. Diesel will auto start and the output breaker will NOT auto close on the bus.
c. Diesel will remain in Standby and output breaker will auto close on the bus.
d. Diesel will remain in Standby and the output breaker will NOT auto close on the bus.

Page 1 of 1

Proposed Answer Reference(s) TM-OP-004-ST

a. DG will auto start and auto close in on bus TM-OP-024-ST UV for >0.5 seconds Discuss Distracters
b. auto close interlocks would be met this would be true if interlocks for auto closure were not satified
c. NP diesel auto starts on UV for >0.5 seconds and auto closure interlock is not met with DG not running
d. diesel auto starts on UV for >0.5 seconds this would be true if alternate breaker closed RO SRO 2 Tier # 2 Tier #

2 Group # 1 Group #

262001 K/A 262001 KIA K3.02 K3.02 3.8 I-rating 4.2 I-rating K&A Statement SSES Cross-Reference Learning Objective(s) # 2260m 2239f - , I BANK QUESTION (attach question)

LI SSES exam bank Question #

LI INPO exam bank Question #

LI Other facility exam bank Facility LI Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

LI SSES exam bank Question #

LI INPO- exam bank Question #

L Other facility exam bank Facility LI Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam An attachment to the examination will be required to answer this question.

Page 1 of 1

YES (XN Attachment required is:

Review and Validation Comments TRG - Choice c identified as non-plausible OPS - changed LOD to 3 from 2 Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

Unit 1 was operating at 100% power when a Feedwater Level Control failure resulted in a Main Turbine trip on High RPV Level. Which one of the following describes the response of the Reactor Recirc System?

a. Both Reactor Recirc Pumps runback to 45% speed.
b. Both Reactor Recirc Pumps runback to 30% speed.
c. All four RPT breakers and both drive motor breakers open.
d. Only the four RPT breakers open.

Page 1 of 1

Proposed Answer Reference(s) TM-OP-064C-ST C is correct. RPT breaker opening, causes drive motor breaker to open Discuss Distracters A is not correct. Turbine trip >30% power causes EOC/RPT trip.

B is not correct. This would be the response to a total feed flow of <20%, however, EOC/RPT occurs first D is not correct. They may choose this if they forget that the Drive Motor Breakers open if the RPT opens RO SRO 1 Tier # 1 Tier #

1 Group # 2 Group #

295005 K/A 295005 K/A AA1.01 AA1.01 3.1 I-rating 3.3 I-rating K&A Statement Ability to operate and/or monitor the following as they apply to MAIN TURBINE GENERATOR TRIP: Recirculation system SSES Cross-Reference Learning Objective(s) # 2558k , II I( Q'TI attach question)

V X SSES exam bank) Question # AD045/1357/ 2 .

Question # .

[] Other facility exam bank Facility .

I: Previous NRC exam Facility and date of exam D Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

D SSES exam bank Question # -

D INPO exam bank Question #

D] Other facility exam bank Facility D Previous NRC exam Facility and date of exam -

D Previous audit exam Facility and date of exam

[ NEW QUESTION Page 1 of 1

An attachment to the exami uired to answer this question.

YES X NO Attachment required is:

Review-and Validation Comments TRG - None OPS - changed stem to identify Unit 1 Changed choice a to 45% from 90%

Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only Xh X 10CFR55.41.10 10CFR55.43

- Memory/Fundamental X Comprehension/Analysis Proposed Question Rofir to .Attoehmont 2)

The following post scram conditions exist:

  • Both Recirc pumps are tripped
  • RPV level is 20 inches and rising slowly
  • RPV pressure is 980 psig and stable
  • All rods are fully inserted
  • Calculated dome to bottom head drain differential temperature is 1600 F Which one of the following identifies the action to be taken due to-vessel thermal stratification per ON-100-101, Scram?
a. Raise level to promote natural circulation, restart a Recirculation pump.
b. Raise level to promote natural circulation, do not restart a Recirculation pump.
c. Do not raise level to promote natural circulation, restart a Recirculation pump.
d. Do not raise level to promote natural circulation, do notrestart a Recirculation pump.

Page 1 of 1

Proposed Answer Reference(s) ON-100-101

d. correct - with >1450 F DT natural circ is AD045 hindered and recirc is not restarted Discuss Distracters
a. incorrect - would be action if <1450 F DT
b. incorrect - level is not raised
c. incorrect - recirc is not restarted RO SRO 1 Tier # 1 Tier #

1 Group # 1 Group #

295006 K/A 295006 KIA AA1.04 AA1.04 3.1 I-rating 3.2 I-rating K&A Statement Ability to operate and/or monitor the following as they apply to SCRAM: Recirculation system SSES Cross-Reference Learning Objective(s) # 1358 1365e I BANK QUESTION (attach question)

DSSES exam bank Question #

DINPO exam bank Question #

D Other facility exam bank Facility

[ Previous NRC exam Facility and date of exam D Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

DSSES exam bank Question #

[li INPO exam bank Question #

Z1 Other facility exam bank Facility DPrevious NRC exam Facility and date of exam DPrevious audit exam Facility and date of exam CX NEW QET An attachment to the examipe eqeired to answer this question.

YES NO Page 1 of 1

Attachment required is:

Review and Validation Comments TRG - Changed LOD to 2 from 3.

Dropped CAPS on Not and Do in choices b,c and d.

Underlined NOT in choices b,c and d.

Reworded stem conditions to scram on low RPV level and replaced indicated with calculated for diff. Temp. since this value is not indicated -

OPS - Changed LOD back to 3 from 2 Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only X8 Both 2 LCD X 10CFR55.41.6 1_CF5 .43 X/lemrprylFundament Comprehension/Analysis Proposed Question (Referkto Attachmcnt 2)

During an RPS failure to scram condition the operator inserts control rods by initiating the ARI function per ON-1 00-101, 'Scram". Which one of the following describes the control rod response as a result of ARI initiation as compared to a normal RPS initiation and the reason for this difference?

a. Control rods would take longer to insert, ARI vents each scram valve individually.
b. Control rods would not take as long to insert, ARI vents each scram valve individually.
c. Control rods would take longer to insert, ARI vents the scram air header and not each scram valve individually.
d. Control rods would not take as long to insert, ARI vents the scram air header and not each scram valve individually Page 1 of 1

Proposed Answer Reference(s) ON-100-101

c. correct - ARI vent the main header resulting AD045 in slower depressurization of header than RPS TM-OP-055-ST which vent each scram valve Discuss Distracters
a. incorrect - RPS vent individual scram valves
b. incorrect - rods would take longer to insert and RPS vent individual scram valves
d. incorrect - rods would take longer to insert RO SRO 1 Tier # 1 Tier #

1 Group # 1 Group #

295006 K/A 295006 K/A AK1.03 AK1.03 3.7 I-rating 4.0 I-rating K&A Statement Knowledge of the operational implications of The following concepts as they apply to SCRAM: Reactivity control.

SSES Cross-Reference Learning Objective(s) # 1359 , 10034b __I BANK QUESTION (attach question)

El SSES exam bank Question #

El INPO exam bank Question #

El] Other facility exam bank Facility Ii Previous NRC exam Facility and date of exam El Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

El SSES exam bank Question #

El INPO exam bank Question #

3l Other facility exam bank Facility LI Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam En stio An attachment to the examination will be required to answer this question.

Page 1 of 1

YES Attachment required is:

Review and Validation Comments TRG - Dropped Cog LvI to Memory.

Dropped CAPS in choices using Not and underlined not statements OPS - added "CONTROL" rods to each choice Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only X9 Both 3LO X 10CFR55.41.5 10CFR55.43 Memory/Fundamental XComprehension/Analys Proposed Question (itfer to AttachMcnt 2)

The following conditions exist during a reactor startup on Unit 2 Reactor power is 4%.

BPV#1 is 100% open.

BPV #2 is 20% open.

EHC pressure regulator "A" output fails high.

Which one of the following describes the plant's direct response to this failure during these plant conditions:

a. All bypass valves will go full open.
b. EHC automatically swaps to the "B" pressure regulator.
c. The MSIVs will automatically isolate.
d. The reactor will automatically scram.

Page 1 of 1

Proposed Answer Reference(s) ON-293-001

a. correct - Even though actual reactor TM-OP-093L-ST pressure does not increase. EHC thinks it is and opens BPVs to limit the "pressure" change and resultant power increase.

Discuss Distracters

b. not correct - This is what happens when the in-service regulator fails low.
c. not correct - The MSIVs will not auto close at 861 psig because the Mode Switch is still in S/U at 4% power. The operator must scram the Rx and close the MSIVs.
d. not correct - Because the MSIVs do not auto close, no scram occurs on their closure. This is the reason the reactor is manually scrammed prior to closing the MSIVs.

RO SRO 1 Tier # 1 Tier #

1 Group # 1 Group #

295007 K/A 295007 K/A AK3.06 AK3.06 3.7 I-rating 3.8 I-rating K&A Statement Knowledge of the reasons for the following responses as they apply to HIGH REACTOR PRESSURE: Reactor/turbine pressure regulating system operation SSES Cross-Reference Learning Objective(s) # 1641c I _ _ _ _

N (attach question)

(X SSESexam bagi Question # SY017,A8/05/ 2 Question #

D Other facility exam bank Facility .

FII Previous NRC exam Facility and date of exam D Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

D SSES exam bank Question #

FII INPO exam bank Question #

D Other facility exam bank Facility D Previous NRC exam Facility and date of exam Page 1 of 1

D Previous audit exam Facility and date of exam IZ NEW QUESTION An attachment to the exa mo required to answer this question.

YES NO Attachment required is:

Review and Validation Comments TRG - None OPS - changed transmitter to regulator in stem conditions to be consistent Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only X1O Both 2 LCD X 10CFR55.41 .1 OCFR.43 4 Menwory/Fundamena Comprehension/Analysis Proposed Question (fedR tore tt y0.ne*2)

While operating at 85% RTP the "A" steam line outboard MSIV drifts closed. Which one of the following describes the immediate RPV pressure and power response to this closure?

RPV Pressure Power

a. Rises Rises
b. Rises Lowers
c. Lowers Rises
d. Lowers Lowers Page 1 of 1

Proposed Answer Reference(s) TM-OP-083-ST

a. correct - closure causes pressure and power to rise due to void coefficient Discuss Distracters
b. incorrect - power rises with void collapse
c. incorrect - pressure rises
d. incorrect - pressure and power rise RO SRO 1 Tier # 1 Tier #

1 Group # 1 Group #

295007 K/A 295007 K/A AK2.02 AK2.02 3.8 I-rating 3.8 I-rating K&A Statement Knowledge of the interrelations between HIGH REACTOR PRESSURE and the following: Reactor power SSES Cross-Reference Learning Objective(s) # 1651m , ,I_ I BANK QUESTION (attach question)

L SSES exam bank Question #

LI INPO exam bank Question # .

LI Other facility exam bank Facility L Previous NRC exam Facility and date of exam L Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

LI SSES exam bank Question #

L INPO exam bank Question #

L Other facility exam bank Facility L Previous NRC exam Facility and date of exam L Previous audit exam Facility and date of exam tX NEW QUESTIOtNI An attachment to the exami eq qired to answer this question.

YES NO Page 1 of 1

Attachment required is:

Review and Validation Comments TRG - Changed initial power level to 85% from 75% due to concern that at this low of a power level the power excursion would not be noticeable.

OPS - none Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only Xli Both 2 LO X 10CFR55.41.9 10CFR55.43 Memory/Fundamental X Comprehension/Anay Proposed Question tFee Atioehont 2)

A scram has occurred on Unit 1 with drywell pressure above the trip setpoint due to a small leak in the containment. An operator is directed to pump down the Drywell floor drain sump for sampling to determine the leak source. The following events are observed during the evolution:

  • Drywell Floor Drain pump (1P402A) control switch was taken to RUN
  • Inboard (HV-16108A1) and Outboard (HV-16108A2) Drywell floor drain sump isolation valves where noted to be closed
  • Drywell Floor Drain pump tripped after 45 seconds Which one of the following describes the response of the system under these conditions?
a. Response was unexpected, isolation valves should have auto opened after pump start.
b. Response was unexpected, isolation valves should have been open due to a high drywell pressure signal.
c. Response was as expected, isolation valves must be opened manually prior to starting sump pump.
d. Response was as expected, isolation valves did not auto open due to a high drywell pressure signal.

Page 1 of 1

Proposed Answer Reference(s) TM-OP-076D-ST

d. correct - >1.72 psig isolates valves preventing pump operation for >45 sec. From start signal Discuss Distracters
a. incorrect - valves will not auto open with isolation signal in
b. incorrect - valves are normally closed and will not auto open with isolation signal in
c. incorrect - valve auto open if isolation signal is not in RO SRO 1 Tier # 1 Tier #

1 Group # 1 Group #

295010 KIA 295010 KIA AA1.02 AA1.02 3.6 I-rating 3.6 I-rating K&A Statement Ability to operate and/or monitor the following as they apply to HIGH DRYWELL PRESSURE: Drywell floor and equipment drain sumps SSES Cross-Reference Learning Objective(s) # 1932b , I BANK QUESTION (attach question)

LI SSES exam bank Question #

LI INPO exam bank Question #

aI Other facility exam bank Facility F Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

LI SSES exam bank Question #

LI INPO exam bank Question #

LI Other facility exam bank Facility LI Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam tXNEW QETO Page 1 of 1

An attachment to the exami eired to answer this question.

YES 6 X NO Attachment required is:

Review and Validation Comments TRG - Reworded stem to identify the drywell pressure condition still exists to eliminate questions as to the status of PCISINSSSS isolation reset status. _

Changed LOD from 3 to 2.

OPS - changed tank to sump in stem for consistency, reworded stem to address unit first for consistency Ops input is that question is good technically but not normally performed with high DW pressure in, leave as is Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only Bh X 10CFR55.41.9 10CFR55.43

-. Memory/Fundamental Xompr Proposed Question (4eforto .A.ttaehment 2)

While operating at 100% RTP on Unit 1 a small steam leak occurs in the drywell causing an automatic scram and isolation. As drywell pressure approaches 5 psig the PCOP reports that suppression pool level is also rising. Which one of the following explains the observed level response?

As Drywell pressure rises suppression pool level is .......

a. not expected to rise, a downcomer pipe has ruptured.
b. not expected to rise, the vacuum breaker has failed closed.-
c. expected to rise, as water is cleared from the downcomer pipes.
d. expected to rise, as the vacuum breakers open to equalize pressure.

Page 1 of 1

Proposed Answer Reference(s) TM-OP-059-ST

c. correct - as drywell pressure rises water in downcomer will be displaced into pool causing indicated level to rise.

Discuss Distracters

a. incorrect - this is expected, if a downcomer failed level would remain unchanged due to equalization across the floor
b. incorrect - this is expected, vac bkrs are not expected to open until SP pressure is above DW pressure
d. incorrect - level would lower when vac bkrs open RO SRO 1 Tier # 1 Tier #

1 Group # 1 Group #

295010 K/A 295010 K/A AK2.01 AK2.01 3.2 I-rating 3.3 I-rating K&A Statement Knowledge of the interrelations between HIGH DRYWELL PRESSURE and the following: Suppression pool level SSES Cross-Reference Learning Objective(s) # 10360e ,

BANK QUESTION (attach question) rII SSES exam bank Question #

EI INPO exam bank Question #

L1 Other facility exam bank Facility LI Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question) 3I SSES exam bank Question #

Eli INPO exam bank Question #

LI Other facility exam bank Facility LI Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam XNE Page 1 of 1

An attachment to the exam ie equired to answer this question.

YES NO Attachment required is:

Revievrand Validation Comments TRG - Changed stem wording to remove "interrelationship" wording that could lead the candidate to concluding that the response is expected.

OPS - Changed LOD to 3 from 2 Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only X13 Both 3 LOD X 10CFR55.41.10 10CFR55.43 Memory/Fundamental X Comprehension/Analysis Proposed Question (Refer to Attachment 2)

Using the attached Heat Capacity Temperature Limit (HCTL) curve from EO-1 00-103, "Primary Containment Control", select the set of parameters for which Rapid RPV Depressurization is required with initial ATWS power at 4%?

a. Reactor Pressure: 850 psig Suppression Pool Temperature: 1801F Suppression Pool Level: 18 feet
b. Reactor Pressure: 650 psig Suppression Pool Temperature: 190OF Suppression Pool Level: 15 feet
c. Reactor Pressure: 600 psig Suppression Pool Temperature: 1800 F Suppression Pool Level: 15 feet
d. Reactor Pressure: 450 psig Suppression Pool Temperature: 1850 F Suppression Pool Level: 12.5 feet Page 1 of 1

Proposed Answer Reference(s) EO-100-103

b. correct applying 601-800 psig curve 15 ft. PPOO2 would still be above curve at 190F Discuss Distracters
a. incorrect - below curve
c. incomect - below curve
d. incorrect - below curve RO SRO 1 Tier # 1 Tier #

2 Group # 1 Group #

295026 K/A 295026 K/A EA2.02 EA2.02 3.8 I-rating 3.9 I-rating K&A Statement Ability to determine and/or interpret the following as they apply to SUPPRESSION POOL HIGH WATER TEMPERATURE: Suppression pool level SSES Cross-Reference Leaming Objective(s) # 2621e , 2630 _ _ _ _ _

X SSES exma iuestion # PPOO2.t2680/9 L INPO exam bank Cluestion #

FI Other facility exam bank Facility aL Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

LI SSES exam bank Question #

l INPO exam bank Question #

LI Other facility exam bank Facility LI Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam L NEW QUESTION An attachment to the examination will be required to answer this question.

X YES NO Page 1 of 1

Attachment required is:

EO-100-103 Figure 2 HCTL curve Review and Validation Comments TRG - None OPS - requested change to bank question Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only X1 Both 3 LOD X 10CFR55.41.6 10CFR55.43 Memory/Fundamental X Comprehension/Any Proposed Question (Osfr to At+shment 9)

While operating at 100% RTP on Unit 1, a loss of control power occurs to the operating CRD pump 1A. Which one of the following identifies the impact this loss will have on pump breaker status and ability to trip on protective trip signals?

Pump Breaker Breaker Protective Trips

a. Remains closed Able to trip breaker
b. Remains closed Not able to trip breaker
c. Opens immediately Able to trip breaker
d. Opens immediately Not able to trip breaker Page 1 of 1

Proposed Answer Reference(s) ON-102-610

b. correct - loss of CP will prevent trip coil TM-OP-055-ST operation automatically or from the control TM-OP-002-ST switch Discuss Distracters
a. incorrect - breaker trips are lost, would be true for B pump with alt. CP
c. incorrect - loss of CP will not trip pump immediately, but will prevent trip coil operation automatically or from the control switch
d. incorrect - loss of CP will not trip pump immediately, true for Recirc pumps RPT breakers RO SRO 1 Tier # 1 Tier #

2 Group # 2 Group #

295004 K/A 295004 K/A AK1.05 AK1.05 3.3 I-rating 3.4 I-rating K&A Statement Knowledge of the operational implications of the following concepts as they apply to PARTIAL OR COMPLETE LOSS OF DC POWER: Loss of breaker protection.

SSES Cross-Reference Learning Objective(s) # 24199g I BANK QUESTION (attach question)

F SSES exam bank Question #

F INPO exam bank Question #

F Other facility exam bank Facility a Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

L SSES exam bank Question # .

C INPO exam bank Question # .

L Other facility exam bank Facility .

LI Previous NRC exam Facility and date of exam C] Previous audit exam Facility and date of exam Page 1 of 1

An attachment to the examin e required to answer this question.

YES N Attachment required is:

Review and Validation Comments Modified original choices a and b (now c and d) to state breaker opens immediately.

Modified original choices c and d (now a and b) to state breaker remains closed.

Also changed format to column to minimize wording in each choice.

Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only X15 Both 3 LOD X 10CFR55.41.10 10CFR55.43 Memory/Fundamental X Comprehension/Analysis Proposed Question (Refer to Attachment 2)

An l&C surveillance test is being performed on the containment isolation logic. The test requires defeating each channel in the auto isolation logic to perform the test. The Technical Specifications allow 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> to perform the test (APT).

During the test, the second channel exceeds it's allowable trip setpoint and requires relay replacement. The remaining channels remain operable.

Which one of the following identifies the time that the LCO time should be entered for the INOP channel?

a. At the time the channel failed the test.
b. At the completion of testing on all channels.
c. At the end of the APT for the second channel.
d. At the start of the APT for the second channel.

Page 1 of 1

Proposed Answer Reference(s) NDAP-QA-0722 pg

a. correct - Operations is required to 44-45 immediately enter the LCO action 9.4.13 c.(3) AD044A/B Discuss Distracters
d. incorrect - NP, no actions require starting the LCO action at the start of the APT
c. incorrect - this is allowed if the condition can and will be corrected within the procedure in use, a WO is required to replace the relay
b. incorrect - the test may be continued for the other functions for the remainder of the APT but the LCO action must be entered for the Inop channel RO SRO 3 Tier # 3 Tier #

Group # Group #

2.2.24 K/A 2.2.24 K/A 2.6 I-rating 3.8 I-rating K&A Statement Ability to analyze the affect of maintenance on LCO status SSES Cross-Reference Learning Objective(s) # 4332 _ , _

BANK QUESTION (attach question)

Li SSES exam bank Question #

El INPO exam bank Question #

El Other facility exam bank Facility Li Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

Cl SSES exam bank Question #

X INPO exam bank Question # 11837/ INMPC L1 Other facility exam bank Facility X Previous NRC exam Facility and date of exam NMPC/ 01/20198 EL Previous audit exam Facility and date of exam LI NEW QUESTION Page 1 of 1

An attachment to the examination will be required to answer this question.

YES X NO Attachment required is:

Review and Validation Comments TRG - none OPS - Added 'for second channel to choices c and d Rearranged choices by length a to d, b to c, c to a, b to d Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only X 10CFR55.41.8

,5d43 CX Memamenta Comprehension/Analysis Proposed Question rt An event occurs during refueling activities that results in the following alarms:

  • AR-1 12 D01, REFUEL FLOOR WALL EXH MON Hi RADIATION
  • AR-112 F02, REFUEL FLOOR HI EXH HI RADIATION
  • AR-106 E03, REFUEL FLOOR Hi EXH HI-HI RADIATION
  • AR-111 G04, CONTAINMENT ATMOS DIV 1 HI RADIATION Which one of the following automatic actions prevents the dose to the general public from exceeding I OCFR100 limits under these plant conditions?
a. CREOASS starts.
b. Reactor Building Recirculation System starts.
c. Affected Zone air is filtered through the SBGTS.
d. Primary and Secondary Containment are completely isolated so that no air is released to the environment.

Page 1 of 1

Proposed Answer Reference(s) ON-1 59-002

c. correct - SGTS starts to filter RB exhaust ST-OP-034-ST AR-1 06-001 Discuss Distracters
a. incorrect -starts to limit control room dose not release rad.
b. incorrect - this start provides building air circulation
d. incorrect - NP-PC does not isolate on refuel floor exh rad and SC is not completely isolated RO SRO 1 Tier # 1 Tier #

2 Group # 1 Group #

295017 K/A 295017 K/A AK1.02 AK1.02 3.8 I-rating 4.3 I-rating K&A Statement Knowledge of the operational implications of the following concepts as they apply to HIGH OFF-SITE RELEASE RATE: Protection of the general public SSES Cross-Reference Learning Objective(s) # 1266d I I _

(B NK U T attach question Question # AD045 5/C 102 D INPO exam bank Question #

D Other facility exam bank Facility X Previous NRC exam Facility and date of exam SSES 07/10/92 D Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

D1 SSES exam bank Question #

D INPO exam bank Question#

D Other facility exam bank Facility D Previous NRC exam Facility and date of exam D Previous audit exam Facility and date of exam U NEW QUESTION Page 1 of 1

An attachment to the examip nIWMt'uquired to answer this question.

YES Attachment required is:

Review and Validation Comments TRG - No comments OPS - reworded correct choice to "affect zone air" Changed LOD to 3 from 2 Page 1 of 1

WRITTEN EXAMINAtION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only X17 Both 2 LOD X 10CFR55.41.8 10CFR55.43 X Memory/Fundamental Comprehension/Analysis Proposed Question (Refer to Attachment 2)

Which one of the following statements identifies the Emergency Service Water (ESW) System alignment required per ON-054-001, "Loss of ESW" with only three pumps operable?

Consider the Diesel Generators and RBCCW/TBCCW heat exchangers only.

Loop with One Pump Loop with Two Pumps

a. RBCCWITBCCW Diesels and RBCCW/TBCCW
b. Diesels and RBCCW/TBCCW Diesels
c. RBCCW/TBCCW Diesels
d. Diesels and RBCCW/TBCCW RBCCW/TBCCW Page 1 of 1

Proposed Answer Reference(s) -

ON-054-001

c. correct - lineup per ON to ensure adequate -

TM-OP-054-ST cooling to heat exchangers and prevents AD045 ESW runout Discuss Distracters

a. incorrect L.ineup has loops both loops aligned to RB/TB
b. incorrect - lineup has inop loop aligned to EDGs
d. incorrect - lineup has inop loop aligned to EDGs RO SRO 1 Tier # 1 Tier #

2 Group # 2 Group #

295018 K/A 295018 K/A AK2.01 AK2.01 3.3 I-rating 3.4 I-rating K&A Statement Knowledge of the interrelation between PARTIAL OR COMPLETE LOSS OF COMPONENT COOLING WATER: System loads SSES Cross-Reference Learning Objective(s) # 1359 , ,

BANK QUESTION (attach question)

L SSES exam bank Question #

LI INPO exam bank Question # .

LI Other facility exam bank Facility LI Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

X SSES exam bank Question # AD045,01360/1 L INPO exam bank Question # .

O Other facility exam bank Facility L Previous NRC exam Facility and date of exam L Previous audit exam Facility and date of exam LI NEW QUESTION Page 1 of 1

An attachment to the examination will be required to answer this question.

YES X NO Attachment required is:

Review anO. Validation Comments TRG - No Comments -

OPS - changed format to two column Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only Bog 2 )

X 10CFR55.41.7 .-.-..

10CFR55.43

__ -Comprehension/Analysis Proposed Question o ALaGrmi1 2)

LR Unit 1 was operating at 78% RTP when A Reactor Recirculation pump speed control signal fails downscale.

Which one of the following describes the expected status of the Scoop Tube Lockcircuit and the Reactor Recirculation Pump response due to this failure? A Scoop Tube Lock Circuit Pump Speed

a. Lock initiated Runback to 0% speed
b. Lock initiated Remains at approximately original speed
c. No lock initiated Runback to 0% speed
d. No lock initiated Remains at approximately original speed Page 1 of 1

Proposed Answer Reference(s) TM-OP-064A-ST

b. correct - lockout on signal failure prevents pump speed change Discuss Distracters
a. incorrect - with lockout initiated pump speed would not change
c. incorrect - would occur if lockout did not initiate
d. incorrect -would be status if failure did not effect scoop tube circuit or speed RO SRO 2 Tier # 2 Tier #

1 Group # 1 Group #

202002 K/A 202002 K/A A3.03 A3.03 3.1 I-rating 3.0 I-rating K&A Statement Ability to monitor automatic operation of the RECIRCULATION FLOW CONTROL SYSTEM including: Scoop tube operation SSES Cross-Reference Learning Objective(s) # 2581 e II .

BANK QUESTION (attach question)

IZ SSES exam bank Question #

D INPO exam bank Question #

D Other facility exam bank Facility D Previous NRC exam Facility and date of exam D Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

El SSES exam bank Question #

aI INPO exam bank Question #

El Other facility exam bank Facility

[] Previous NRC exam Facility and date of exam El Previous audit exam Facility and date of exam UESTION Page 1 of 1

An attachment to the exami eequired to answer this question.

YES X NO Attachment required is:

Review and Validation Comments TRG - No Comments OPS - Removed 'out" from "lock out" to correct to plant terminology Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only X19 Both 3 LOD X IOCFR55.41.10 10CFR55.43 Memory/Fundamental X Comprehension/Analysis Proposed Question (Refer to Attachment 2)

During a reactor startup with a heatup in progress, RPV level was lowered until the AR-101-B17, RX WATER HI-LO LEVEL, alarm cleared (slow flash).

Using the attached ON-145-004, "Reactor Water Level Anomaly, Attachment A",

determine which one of the following level values represents approximate RPV water level.

a. -10 inches.
b. 30 inches.
c. 40 inches.
d. 60 inches.

Page 1 of 1

Proposed Answer Reference(s) ON-1 45-001

b. correct - Attachment A up from 39" to NR TM-OP-080-ST intersection look left to -30" mark for approx level Discuss Distracters
a. incorrect - follow from 39" up to Wr intersection look left to --10"
c. incorrect - follow from 39" up to SD intersection look left to -40"
d. incorrect - following 39" from left across to NR intersection and down to -60" RO SRO 2 Tier # 2 Tier #

1 Group # 1 Group #

216000 K/A 216000 K/A K5.10 K5.10 3.1 I-rating 3.3 I-rating K&A Statement Knowledge of the operational implications of the following concepts as they apply to NUCLEAR BOILER INSTRUMENTATION: Indicated level vs. actual level during vessel heatups and cooldowns SSES Cross-Reference Learning Objective(s) # 1480b , I BANK QUESTION (attach question)

LI SSES exam bank Question #

L INPO exam bank Question #

L Other facility exam bank Facility LI Previous NRC exam Facility and date of exam 0 Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

X SSES exam bank Question # SYO17,J2/06/ 17 L INPO exam bank Question #

LI Other facility exam bank Facility L Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam 0 NEW QUESTION Page 1 of 1

An attachment to the examination will be required to answer this question.

x YES NO Attachment required is:

ON-145-004 Attachment A Review and Validation Comments TRG ~-Removed "in the RPV" from last words of stem.

OPS - Reworded stem to clarify heatup in progress Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only ( 3 LOD X 10CFR55.41.7 10CFR55.43

< =Fund enta Comprehension/Analysis Proposed Question (Refer to Attachment 2)

During execution of ON-100-009, "Control Room Evacuation", with control transferred to the Remote Shutdown Panel it is noted that the RCIC system did not automatically initiate when RPV level dropped below -30 inches Which one of the following describes the response of the RCIC system under these conditions?

a. RCIC has responded properly, manual start from the RSP is required.
b. RCIC has responded properly, local reset of Trip & Throttle valve is required.
c. RCIC has failed to respond properly, manual start from the RSP is required.
d. RCIC has failed to respond properly, local reset of Trip & Throttle valve is required.

Page 1 of 1

Proposed Answer Reference(s) ON-1 00-009

a. correct auto init is defeated when controls TM-OP-050-ST are transferred, controls are provided at RSP Discuss Distracters
b. incorrect - this action is necessary after overspeed trip
c. incorrect - this function is defeated when controls are transferred
d. incorrect - this function is defeated when controls are transferred and action is necessary after overspeed trip RO SRO 2 Tier # 2 Tier#

1 Group # 1 Group #

217000 K/A 217000 K/A 2.1.32 2.1.32 3.4 I-rating 3.8 I-rating K&A Statement Ability to explain and apply system limits and precautions SSES Cross-Reference Learning Objective(s) # 2014k _ _ I__ _ _ y__ _ _ _ _

BANK QUESTION (attach questio X SSES exam bank Question # SM001C/C 37 exa Question #

D1 Other facility exam bank Facility F1 Previous NRC exam Facility and date of exam D Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

Z1 SSES exam bank Question #

FII INPO exam bank Question #

D Other facility exam bank Facility D Previous NRC exam Facility and date of exam D Previous audit exam Facility and date of exam Cl NEW QUESTION An attachment to the exami FW equired to answer this question.

YES NO Page 1 of 1

Attachment required is:

Review and Validation Comments Modified question to be SRO only Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES401-6 comparable)

RO only SRO only X21 Both 3 LOD X 10CFR55.41.8 10CFR55.43 Memory/Fundamental X Comprehension/Analysis Proposed Question (Refer to Attachment 2)

With Unit 1 at 85% RTP a load reject and loss of off-site power occur. Which one of the following identifies the impact this power loss transient will have on the Drywell Cooling Unit Cooler fans with drywell pressure remaining below 1.72 psig?

a. Do not lose power and remain running.
b. Lose power, and remain de-energized.
c. Do not lose power, trip, and then immediately restart.
d. Lose power, and restart when the ESS buses re-energize.

Page 1 of 1

Proposed Answer Reference(s) TM-OP-073-ST

d. correct - ESS powered and restart on power restoration provided high DW trip does not occur Discuss Distracters
a. incfrect - ESS buses loss power until EDGs start and close in on bus
b. incorrect - coolers restart on power restoration but would trip if >1.72
c. incorrect - - ESS buses loss power until EDGs start and close in on bus RO SRO 2 Tier # 2 Tier #

1 Group # 1 Group #

223001 K/A 223001 K/A K2.09 K2.09 2.7 I-rating 2.9 I-rating K&A Statement Knowledge of the power supplies to the following: Drywell cooling fans SSES Cross-Reference Leaming Objective(s) # 10708 , I BANK QUESTION (attach question)

El SSES exam bank Question #

LI INPO exam bank Question #

El Other facility exam bank Facility EL Previous NRC exam Facility and date of exam El Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

X SSES exam bank Question # SY0171 E6/041 2 L1 INPO exam bank Question #

LI Other facility exam bank Facility X Previous NRC exam Facility and date of exam SSES 2001#67 LI Previous audit exam Facility and date of exam El NEW QUESTION Page 1 of 1

An attachment to the examination will be required to answer this question.

YES X NO Attachment required is:

Review and Validation Comments TRG - Added drywell pressure condition to stem to qualify isolation-status.

OPS - changed LOD to 3 from 2 Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only j7 Both 3LOD X 10CFR55.41.9 10CFR55.43

- fMemory/Fundamental on/AnaIys X Compre Proposed Question (Refei: te AAae 61 1%t! -

While operating at 100% RTP on Unit 1, oxygen concentration has risen to a value requiring venting and makeup of nitrogen to the drywell. During the evolution, a loss of instrument air to the 2" Drywell Vent to SBGT Bypass valve HV-1 571 1 occurs.

Which one of the following identifies the failure position and drywell pressure/system response to this valve failure?

a. Closed, drywell pressure will rise to the high drywell scram setpoint terminating unit operation.
b. Open, drywell pressure will lower creating a negative pressure in the primary containment.
c. Closed, drywell pressure will rise to the high pressure alarm closing the nitrogen makeup valve.
d. Open, drywell pressure will lower causing the nitrogen makeup valve to regulate open stabilizing pressure.

Page 1 of 1

Proposed Answer Reference(s) TM-OP-073-ST

c. correct - Vent valve fails closed on loss of air and Nitrogen valve closes at 1Kplji.

Discuss Distracters

a. incorrect - valve closure at 1# will prevent continued pressurization of PC
b. incorrect - Would be correct if valve was not already full open
d. incorrect - Would be correct if valve was not already full open also nitrogen valve does not regulate RO SRO 2 Tier# 2 Tier #

1 Group # 1 Group #

223001 K/A 223001 K/A K4.03 K4.03 3.7 I-rating 3.8 I-rating K&A Statement Knowledge of PRIMARY CONTAINMENT SYSTEM AND AUXILIARIES design feature(s) and/or interlocks which provide for the following:

containment/drywell isolation SSES Cross-Reference Learning Objective(s) # 1908a II I BANK QUESTION (attach question SSES exam bank Question # SY01 7E6/211 1 Question #

[3 Other facility exam bank Facility

[] Previous NRC exam Facility and date of exam L1 Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

LI SSES exam bank Question #

LI INPO exam bank Question #

LI Other facility exam bank Facility 2 Previous NRC exam Facility and date of exam

[] Previous audit exam Facility and date of exam LI NEW QUESTION Page 1 of 1

An attachment to the examj'q rwtf quired to answer this question.

YES NO Attachment required is:

Review-and Validation Comments -

TRG - No Comments OPS - No comments Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only B X 10CFR55.41.3 10CFR55.43 o r y l Ft Comprehension/Analysis Proposed Question tRefej tL LldA[tI.

t v)

Which one of the following describes the purpose and function of the MOV Test Switches associated with various system motor operated valves in the control room?

Operation of these devices to the TEST position.......

a. enables thermal overload protection on the effected MOVs.
b. enables torque switch operation on the effected MOVs.
c. disables thermal overload protection on the effected MOVs-.
d. disables torque switch operation on the effected MOVs.

Page 1 of 1

Proposed Answer Reference(s) OP-AD-001

a. correct - OL protection normally defeated, switch enables function during normal stroking of valves Discuss Distracters
b. incorrect - torque switch operation is not affected by this device
c. incorrect - this would be true with switch in NORM position
d. incorrect - torque switch operation is not affected by this device RO SRO 3 Tier # 3 Tier #

Group # Group #

2.1.28 K/A 2.1.28 K/A 3.2 l-rating 3.3 I-rating K&A Statement Knowledge of the purpose and function of major system components and controls SSES Cross-Reference Learning Objective(s) # 10493b I I BANK QUESTION (attach question)

D SSES exam bank Questior I #

D INPO exam bank Questior #d D1 Other facility exam bank Facility -

D2 Previous NRC exam Facility aand date of exam F Previous audit exam Facility aand date of exam BANK QUESTION (attach question)

D SSES exam bank Questior I#

X INPO exam bank Questior I # #822 D] Other facility exam bank Facility X Previous NRC exam Facility aand date of exam Grand Gulf 98 ED Previous audit exam Facility aand date of exam LI NEW QUESTION An attachment to the examination will be required to answer this question.

Page 1 of 1

YES Attachment required is:

Review and Validation Comments TRG - No Comments OPS-replaced PICSY monitor with torque switch operation in distracters b and d Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only X24 Both 2 LOD X 10CFR55.41 .7 55.43 XMemory/Fundamental Comprehension/Analysis Proposed Question (Reft lut acnMZf b Ii.

Which one of the following high temperature isolation signals is necessary to enable the 1C614, Leak Detection System Panel, HPCI Division 1/2 isolation pushbutton function to allow manual isolation of the system from this back panel?

a. HPCI Pipe Routing Area.
b. HPCI Emergency Cooler.
c. HPCI Equipment Room Area.
d. HPCI Equipment Room Vent Air Delta Temp.

Page 1 of 1

Proposed Answer Reference(s) TM-OP-059B-ST

a. correct - only pipe routing areas have the 15 min timer function that is also associated with the 1C614 isolation PB Discuss Distracters
b. incorrect - do not have 15 min timer and PB function
c. incorrect - do not have 15 min timer and PB function
d. incorrect - do not have 15 min timer and PB function RO SRO 2 Tier # 2 Tier #

1 Group # 1 Group #

223002 K/A 223002 K/A K4.03 K4.03 3.5 I-rating 3.6 I-rating K&A Statement Knowledge of PRIMARY CONTAINMENT ISOLATION SYSTEM/NUCLEAR STEAM SUPPLY SHUT-OFF design feature(s) and/or interlocks which provide for the following: Manual initiation capability SSES Cross-Reference Learning Objective(s) # 2120g , I I NQUESTION (attach qu VX exam bank Question # SYO1 7E31E3/2118/ 1 CllQP exambank Question #

] Other facility exam bank Facility F Previous NRC exam Facility and date of exam F Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

E:l SSES exam bank Question #

D INPO exam bank Question #

D Other facility exam bank Facility D Previous NRC exam Facility and date of exam E] Previous audit exam Facility and date of exam El NEW QUESTION Page 1 of 1

An attachment to the exami wilequired to answer this question.

YES NO Attachment required is:

Review and Validation Comments Modified stem to clarify that question is about back panel isolation -RB not the 1C601 HPCI system isolation pushbutton.

Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only ( h 2 LOD X 10CFR55.41.10 10CFR55.43

-- _Memory/Fundamental renC o n/Ananasi 3 Proposed Question (Refer to Attachment 2)

The following conditions exist for the 125 VDC system panel I D612:

  • Ground detection Negative lamp is brightly lit
  • Ground detection Positive lamp is dimly lit
  • AR-106 A12,125VDC PANEL 1L610 SYSTEM TROUBLE is in alarm Which one of the following identifies the system status and necessary actions to be taken for this condition?
a. A ground is indicated on the Positive line, notify electrical maintenance.
b. A ground is indicated on the positive line, open all load breakers on 1D612.
c. A ground is indicated on the negative line, notify electrical maintenance.
d. A ground is indicated on the negative line, open all load breakers on 1D612.

Page 1 of 1

Proposed Answer Reference(s) OP-1 02-001

a. correct - When a ground on the positive line AR-1 06-001 occurs, the negative lamp will brighten and the TM-OP-002-ST positive lamp will dim, or go out depending on the severity of the ground requiring EM response Discuss Distracters
b. incotrrect - this action would be taken for a loss of 1D614
c. incorrect - this would cause negative lamp to dim and positive to brighten but would be correct action for neg ground
d. incorrect - this would cause negative lamp to dim and positive to brighten and action would be taken for a loss of 1D614 RO SRO 2 Tier # 2 Tier #

2 Group # 2 Group #

263000 K/A 263000 K/A A2.01 A2.01 2.8 I-rating 3.2 I-rating K&A Statement Ability to (a) predict the impacts of the following on the DC ELECTRICAL DISTRIBUTION; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Grounds SSES Cross-Reference Learning Objective(s) # 1431c I I BANK QUESTION (attach question) rZ SSES exam bank Question #

D INPO exam bank Question #

D Other facility exam bank Facility D Previous NRC exam Facility and date of exam D Previous audit exam Facility and date of exam X SSESexam bank Question # TM-OP-002-OB/143111 l INPO exam bank Question #

Other facility exam bank Facility Page 1 of 1

[F Previous NRC exam Facility and date of exam D Previous audit exam Facility and date of exam jj NEW QUESTION An attachment to the examiaaTrWtltt1s..cquired to answer this question.

YES NO AttacFirnent required is:

Review and Validation Comments TRG - Modified stem for focus and correctingtypo adding "the system status and necessary" OPS - corrected panel # to 612 from 614 Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only B X 10CFR55.41.4 10CFR55.43 G Me r/Fundamenta Comprehension/AnatYsis Proposed Question (Refer to Attachment 2)

Which one of the following identifies the concern with operating the Mechanical Vacuum Pump while at power?

MVP operation will result in........

a. an untreated release to the environment.
b. an unmonitored release to the environment.
c. the build up of excessive hydrogen in the Offgas train.
d. incomplete recombination in the Offgas Treatment Recombiner.

Page 1 of 1

Proposed Answer Reference(s) TM-OP-043-ST

a. correct - MVP bypasses Offgas treatment P&ID M107 Discuss Distracters
b. incorrect - Stack monitors discharge
c. incorrect -concern with out dilution flow
d. incorrect -concern with out Oxygen injection RO SRO 2 Tier # 2 Tier #

2 Group # 2 Group #

271000 KIA 271000 K/A K1.01 K1.01 3.1 I-rating 3.1 I-rating K&A Statement Knowledge of the physical connections and/or cause-effect relationships between OFFGAS SYSTEM and: condenser air removal system SSES Cross-Reference Learning Objective(s) # 1196h , ,I BANK QUESTION (attach question)

El SSES exam bank Question #

Fl INPO exam bank Question #

Eli Other facility exam bank Facility El Previous NRC exam Facility and date of exam El Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

El SSES exam bank Question #

El INPO exam bank Question #

El Other facility exam bank Facility Fl Previous NRC exam Facility and date of exam El Previous audit exam Facility and date of exam UESTION An attachment to the examiuired to answer this question.

YES NO Page 1 of 1

Attachment required is:

Review and Validation Comments TRG - No Comments on K1.02 question OPS - Rad monitor no longer functional replaced K/A to applicable to SSES K1.01 Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only h 2 LOD X 10CFR55.41.10 10CFR55.43 X o~/ nd namenaDComprehension/Analysis Proposed Question (Refer to Attachment 2)

In accordance with ON-070-001, "Abnormal Gaseous Radiation Release/Cam Alarms",

if an abnormal gaseous radiation release is in progress, closure of the Turbine Building 676' roll-up doors will prevent...

a. airborne contamination of the other unit's Turbine Building.
b. an uncontrolled airborne release from the Turbine Building.
c. all access to airborne contamination areas in the Turbine Building.
d. unmonitored airborne release from the Turbine Building HVAC system.

Page 1 of 1

Proposed Answer Reference(s) ON-070-001

b. correct - ON bases identifies uncontrolled AD045 release path Discuss Distracters
a. incorrect -Would not prevent contamination of the other unit
c. incorrect - Would not prevent personnel from entering airborne contamination areas of the Turbine Building
d. incorrect - TB HVAC is a monitored release path RO SRO 3 Tier # 3 Tier #

Group # Group #

2.3.11 K/A 2.3.11 K/A 2.7 I-rating 3.2 I-rating K&A Statement Ability to control radiation releases SSES Cross-Reference Learning Objective(s) # 1360 , _I I -_

BANK QUESTION (attach question)

II SSES exam bank Question #

C: INPO exam bank Question #

7 Other facility exam bank Facility C: Previous NRC exam Facility and date of exam El Previous audit exam Facility and date of exam X SSES exam bank Question # AD045 /01/ 2 El INPO exam bank Question #

C l Other facility exam bank Facility X Previous NRC exam Facility and date of exam SSES 2001 E Previous audit exam Facility and date of exam El NEW QUESTION An attachment to the examination will be required to answer this question.

Page 1 of 1

YES (I Attachment required is:

Review and Validation Comments TRG - No Comments OPS Zzolarified which doors are being closed Modified distracters to evaluate unmonitored and uncontrolled and balanced distracters Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only <93> 2 LOD X 10CFR55.41 .10 10CFR55.43 Memory/Fundamental ehension/AnaIysis Proposed Question (Refer to Attachment 2)

Unit 1 is in MODE 1 performing a normal unit shutdown. Which one of the following describes the required SBGT train operation and purge valve lineup condition permitted by NDAP-QA-0309, 'Primary Containment Control' for purging the containment?

Required Trains Purge In Operation Line up

a. Two From DW and SC
b. Two From DW or SC
c. One- From DW or SC
d. One From DW and SC Page 1 of 1

Proposed Answer Reference(s) NDAP-QA-0309

c. correct - because one train is used and AD044A purge from either not both spaces AD044B Discuss Distracters
a. incorrect - only one train directed and cannot lineup to both
b. incorrect - only one train directed
d. incorrect - purge from either not both spaces RO SRO 3 Tier # 3 Tier #

Group # Group #

2.3.9 K/A 2.3.9 K/A 2.5 I-rating 3.4 I-rating K&A Statement Knowledge of the process for performing a containment purge SSES Cross-Reference Leaming Objective(s) # 4217 , 4216 , 4657 , 4658 QUES IO N att ch questio X S Sii Question # AD044/14216/1 LI INPO exam bank Question #

R Other facility exam bank Facility LI Previous NRC exam Facility and date of exam R Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

LI SSES exam bank Question #

L1 INPO exam bank Question #

Cl Other facility exam bank Facility LI Previous NRC exam Facility and date of exam L1 Previous audit exam Facility and date of exam LI NEW QUESTION An attachment to the examination will be required to answer this question.

YES X NO Page 1 of 1

Attachment required is:

Review and Validation Comments TRG - Modified to column format and eliminated number of SBGT trains in lineup to eliminate ability to discount original choices c and d since an inop train would not be aligned to purge.

OPS - changed second column to lineup of DW and/or SC and first to trains in operation Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable) x RO only 10CFR55.41.10 SRO only

<E3> (

10CFR55.43 Comprehension/Analysis Proposed Question Refer t- Afta2chGnt 2)

Which one of the following statements identifies the procedure hierarchy from highest to lowest per OP-AD-002, "Standards for Shift Operations" in the event of a procedure conflict?

a. ON-100-101 Scram, EP-DS-003 RPV Level Determination, EO-1 00-1 02 RPV Control
b. EO-1 00-102 RPV Control, ON-1 00-101 Scram, EP-DS-003 RPV Level

/ ..

Determination

c. EP-DS-003 RPV Level Determination, EO-1 00-1 02 RPV Control, ON-1 00-1 01 Scram
d. EP-DS-003 RPV Level Determination, ON-1 00-1 01 Scram, EO-1 00-1 02 RPV Control Page 1 of 1

Proposed Answer Reference(s) OP-AD-002

c. correct - EP-DS are highest followed by AD044A symptom-based EOPs and event based AD044B procedure Discuss Distracters
a. incorrect - identifies event based procedures as highest
b. incorrect - identifies symptom-based and event based above EP-DS
d. incorrect - identifies event based procedures above symptom-based EOPs RO SRO 3 Tier # 3 Tier #

Group # Group #

2.4.16 KIA 2.4.16 K/A 3.0 I-rating 4.0 I-rating K&A Statement Knowledge of EOP implementation hierarchy-and coordination with other support procedures SSES Cross-Reference Learning Objective(s) # 4050 , 4487 _,_I

>ANK QUESTION (attach quetin) io X SS e at uestion # AD044 NXXX/ 1 LI INPO exam bank Qtuestion #

E Other facility exam bank Faacility _

EII Previous NRC exam Faacility and date of exam 2 Previous audit exam Faicility and date of exam MODIFIED BANK QUESTION (attach question)

LI SSES exam bank Question #

E] INPO exam bank Question #

LI Other facility exam bank Facility LI Previous NRC exam Facility and date of exam L] Previous audit exam Facility and date of exam LI NEW QUESTION An attachment to the examination will be required to answer this question.

Page 1 of 1

YES Attachment required is: czŽ Review and Validation Comments TRG - Corrected procedure title error in stem OPS -added procedure number and titles vs. generic terms Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only X 1 OCFR55.41.5 10CFR55.43 Memory/Fundamental reeso n/Ansis Proposed Question (efer ta Aluli l lT8It*2)

Given the following conditions AFTER a transient from 90% RTP on Unit 1:

  • Reactor Pressure is slightly lower
  • Generator MWE is slightly lower
  • Indicated feedwater flow is greater than indicated steam flow (matched before the transient)

Which one of the following events could have caused this plant response?

a. A stuck open Safety Relief Valve.
b. In service EHC pressure regulator fails low (O psig).
c. Isolation of extraction steam to one feedwater heater.
d. Rising main condenser backpressure (degrading vacuum).

Page 1 of 1

Proposed Answer Reference(s) ON-1 83-001

a. correct - SRV steam bypassing feedwater heating gives lowering feed temps and power increase Discuss Distracters
c. incorrect - Should not affect level and MWe
d. incorrect - Should not affect level, feed and steam flows
b. incorrect - Backup regulator should control at a slightly higher pressure.

RO SRO 3 Tier # 3 Tier #

Group # Group #

2.4.47 K/A 2.4.47 K/A 3.4 I-rating 3.7 I-rating K&A Statement Ability to diagnose and recognize trends in an accurate and timely manner utilizing the appropriate control room reference material -

SSES Cross-Reference Learning Objective(s) # 1357 I I X SSES exam bank IQuestion # AD045, 11357/ 25 LI INPO exam bank IQuestion #

LI Other facility exam bank IFacility 3I Previous NRC exam IFacility and date of exam LI Previous audit exam IFacility and date of exam MODIFIED BANK QUESTION (attach question)

LI SSES exam bank Question #

LI INPO exam bank Question #

L Other facility exam bank Facility LI Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam LI NEW QUESTION An attachment to the examinatio e required to answer this question.

YES j re e Page 1 of 1

Attachment required is:

Review and Validation Comments TRG - No Comments OPS - conditions in stem confusing, added FW temp to stem to clarify with ON symptoms and observations Changed EHC failure to cause higher pressure Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only X 10CFR55.41.10 10CFR55.43 Memor Comprehension/Analysis Proposed Question 4cfzr tHo ALLpJariIIl1IL 2)

Per NDAP-QA-0445, uFire Brigade', which one of the following individuals can be assigned to assume the role as Fire Brigade Leader in the absence of the Assistant Unit Supervisor?

a. Shift Supervisor (SS).
b. Alternate OSC coordinator.
c. Either Unit Supervisor (US).
d. Either Plant Control Operator Monitor (PCOM).

Page 1 of 1

Proposed Answer Reference(s) NDAP-QA-0300/0445

c. correct - The FBL must hold an RO or SRO AD044A license and is required to be an individual with AD044B an RO or SRO license other than the SS or the OP-AD-002 PCO required for the unit. The only individual that meets these requirements from those identified in the US Discuss-Distracters
a. incorrect - The SS can not fill per NDAP and unit TS.
b. incorrect - The Alt OSC coord. cannot be assigned as the FBL because this individual does not hold an RO or SRO license
d. incorrect - A Unit PCOM cannot be assigned as the FBL because the FBL is required to be an individual with an RO or SRO license other than the SS or the PCO required for the unit.

The PCOM is required. The PCO (extra) could be assigned if FBL assigned RO SRO 3 Tier # 3 Tier #

Group # Group #

2.4.27 K/A 2.4.27 K/A 3.0 I-rating 3.5 I-rating K&A Statement Knowledge of fire in the plant procedures SSES Cross-Reference Leaming Objective(s) # 4023d , 4460d _,_I x SSES exam bank Question # AD044/ (4023I 2 .

2 INPO exam bank Question # . .

D Other-facility exam bank Facility x Previous NRC exam Facility and date of exam SSES 2001 Do Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question) rI SSES exam bank Question #

D INPO exam bank Question #

E Other facility exam bank Facility Page 1 of 1

D: Previous NRC exam Facility and date of exam D Previous audit exam Facility and date of exam Z NEW QUESTION An attachment to the exami W uired to answer this question.

YES NO Attachment required is:

Review and Validation Comments TRG - No Comments OPS - remove reference to NDAP 0300 from stem Replaced FPE with SS in choice b Removed Senior from NPO no longer applicable Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only X 10CFR55.41.10 10CFR55.43

- fMemory/Fundamental orehension/Anai-Proposed Question Renirat. ,-Ul-J.e.,_nt 23 While operating at 90% RTP an SRV inadvertently opens and after a minute is reclosed by cycling the control room SRV switch. Two minutes later alarm AR-I 11 F04, SUPP POOL DIV 1 AVERAGE TEMP Hi comes in. Which one of the following actions would be required due to receipt of this alarm?

a. Re-start Division 1 SPOTMOS.
b. Initiate Suppression Pool Cooling.
c. Carry out scram imminent actions.
d. Enter EO-1 00-1 03, PC CONTROL.

Page 1 of I

Proposed Answer Reference(s) AR-i 11-001

b. correct - step 2.3.1 of AR F04 TM-OP-059Z-ST Discuss Distracters
a. incorrect - this would be true if "No Data" were displayed
c. incorrect - this would be correct if SRV would hot close and two minutes elapsed
d. incorrect - would be correct if this were a reflash (10SF) of alarm window RO SRO 1 Tier # 1 Tier #

2 Group # 1 Group #

295013 K/A 295013 K/A 2.4.31 2.4.31 3.3 I-rating 3.4 I-rating K&A Statement Knowledge of annunciators alarms and indications and use of the response instructions SSES Cross-Referer ice Learning Objective(s 10509 , ,

BANK QUESTION (,attach question)

IZ SSES exam bang Question #

a INPO exam bank Question #

F Other facility exairn bank Facility j Previous NRC ex am Facility and date of exam D Previous audit ex am Facility and date of exam MODIFIED BANK QUESTION (attach question)

D SSES exam bank Question #

D INPO exam bank Question #

D Other facility exam bank Facility D Previous NRC exam Facility and date of exam D Previous audit exam Facility and date of exam X E UESTION An attachment to the examiired to answer this question.

YES (q i Page 1 of 1

Attachment required is:

Review and Validation Comments TRG - Modified stem to indicate 88 degrees in pool and that SRV was open for less than two minutes to eliminate c and d as correct answers OPS - removed SPTMOS indication from stem due to confusion with SPTMOS indicating lights Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only Cth 2 LOD X 10CFR55.41.3 10CFR55.43 Memory/Fundamental Proposed Question (Refer to Attachment 2)

Which one of the following describes the difference in power response expected between a Reactor Recirculation pump trip due to RPT breaker opening as compared to a trip from opening the drive motor breaker and the reason for this difference?

a. RPT breaker trip would drop power faster due to reduced MG Set coastdown effects.
b. RPT breaker trip would drop power faster due to increased MG Set coastdown effects.
c. Drive motor breaker trip would drop power faster due to reduced MG Set coastdown effects.
d. Drive motor breaker trip would drop power faster due to increased MG Set coastdown effects.

Page 1 of 1

Proposed Answer Reference(s) TM-OP-064C-ST

a. correct - ATWS RPT breaker trip disconnects pump from MG output causing faster flow drop Discuss Distracters
b. incomtect - increased coastdown would result in slower power drop
c. incorrect - drive motor brkr allows pump to coastdown with MG set
d. incorrect - drive motor brkr allows pump to coastdown with MG set and increased coastdown would result in slower power drop RO SRO 1 Tier # 1 Tier #

2 Group # 2 Group #

295001 K/A 295001 K/A AK3.02 AK3.02 3.7 I-rating 3.8 I-rating K&A Statement Knowledge of the reasons for the following responses as they apply to PARTIAL OR COMPLETE LOSS OF FORCED CORE FLOW CIRCULATION:

Reactor power response SSES Cross-Reference Leaming Objective(s) # 10207a , I I BANK QUESTION (attach question)

El SSES exam bank Question #

LI INPO exam bank Question #

LI Other facility exam bank Facility LI Previous NRC exam Facility and date of exam El Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

LI SSES exam bank Question #

L1 INPO exam bank Question #

LI Other facility exam bank Facility LI Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam C(NEW QETO Page 1 of 1

An attachment to the examination will be required to answer this question.

YES X NO Attachment required is:

Review and Validation Comments TRG - Modified stem to compare breaker trip response vs. events that could trip breakers ORG - Replaced MG Set for drive motor in all choices Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only (t 3 LOD X 10CFR55.41.5 10CFR55.43 Memory/Fundamental C rehension/Analys Proposed Question (Refer to Attachment 2)

Unit 1 is operating at 100% RTP with Feedwater level control in automatic, three element control when the operator lowers the Feedwater Level Controller setpoint by 10 inches.

Which one of the following describes the effect this action will have on feedwater flow to the RPV initially and after level has reached the new control setpoint?

Feedwater flow to the RPV will initially......

a. rise and then return to its original value.
b. rise and stabilize at the new higher value.
c. lower and then return to its original value.
d. lower and stabilize at the new lower value.

Page 1 of 1

Proposed Answer Reference(s) TM-OP-045-ST

c. correct - feed flow reduces until level reaches the setpoint then returns to match steam flow near rated since no power change has occurred Discuss Distracters,
a. incorrect - this would occur if setpoint were raised_
b. incorrect - this would occur if controller demand were raised in manual
d. incorrect - this would occur if controller demand were lowered in manual RO SRO 2 Tier # 2 Tier #

1 Group # 1 Group #

259002 K/A 259002 K/A A1 .02 A1 .02 3.6 I-rating 3.5 I-rating K&A Statement Ability to predict and/or monitor changes in parameters associated with operating the REACTOR WATER LEVEL CONTROL SYSTEM controls including:

Reactor feedwater flow SSES Cross-Reference Learning Objective(s) # 1818a I, _ II BANK QUESTION (attach question)

Li SSES exam bank Question #

L1 INPO exam bank Question #

Li Other facility exam bank Facility Li Previous NRC exam Facility and date of exam Li Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

Li SSES exam bank Question #

Li INPO exam bank Question #

Li Other facility exam bank Facility Li Previous NRC exam Facility and date of exam El Previous audit exam Facility and date of exam cZH NW UETION Z Page 1 of 1

An attachment to the examination will be required to answer this question.

YES X NO Attachment required is:

Review and Validation Comments TRG - No Comments OPS - Underlined Feedwater flow Changed LOD 3 from 2 Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only < 2 LOD X 10CFR55.41.10 10CFR55.43

/ d e Comprehension/Anatysis Proposed Question (Refer to Attachment 2)

Which one of the following identifies the minimum number of Safety Relief Valves (SRV) that must be opened during execution of EO-1 00-112, 'Rapid Depressurization" due to high off site release rates, and the reason for this number of SRVs?

a. 6 SRVs must be opened to allow repressurization of the RPV if flooding becomes required.
b. 4 SRVs must be opened to allow repressurization of the RPV if flooding becomes required.
c. 6 SRVs must be opened to ensure the RPV will depressurize and remain depressurized when required.
d. 4 SRVs must be opened to ensure the RPV will depressurize and remain depressurized when required.

Page 1 of 1

Proposed Answer Reference(s) EO-000-1 12

d. correct - per EO-000-1 12 EO-100-1 12 PPOO2 Discuss Distracters
c. incorrect -this is the number of ADS SRVs directed, not the minimum to remain depressurized.
a. incorrect - this is the number of ADS SRVs directed not the minimum and incorrect bases per EO-000-1 12
b. incorrect -incorrect bases per EO-000-1 12 RO SRO 2 Tier # 2 Tier #

1 Group # 1 Group #

218000 K/A 218000 K/A K3.02 K3.02 3.6 I-rating 3.5 I-rating K&A Statement Knowledge of the effect that a loss or malfunction of the AUTOMATIC DEPRESSURIZATION SYSTEM will have on the following; Ability to rapidly depressurize the reactor SSES Cross-Reference Learning Objective(s) # 2598 , II BANK QUESTION (attach question)

LI SSES exam bank Question #

L1 INPO exam bank Question #

LI Other facility exam bank Facility EL Previous NRC exam Facility and date of exam El Previous audit exam Facility and date of exam CiE6IFlED BANK QUESTION (attach questio E SSES exam bank Question #

LI INPO exam bank Question # _____

X Other facility exam bank Facility NMPCU2 LI Previous NRC exam Facility and date of exam EL Previous audit exam Facility and date of exam L NEW QUESTION Page 1 of 1

An attachment to the examination will be required to answer this question.

YES X NO Attachment required is:

Review and Validation Comments TRG - No Comments ORG - changed stem to word from "adverse effects" to "reason for" Changed reason in old distracters c and d (now a and b)

Modified stem to identify reason for RD Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only X 10CFR55.41.10 a5.43 XMemoyentnam l Comprehension/Analysis Proposed Question Mt2)

Which one of the following identifies the reason that Fire Suppression systems are not isolated during execution of EO-1 00-104, "Secondary Containment Control", step SC/R-1, "WHEN ANY RB AREA RAD EXCEEDS HI ALARM"?

Fire Suppression ......

a. actuation can not be defeated per 10CFR50 Appx. R.
b. piping is not a source of radioactivity addition to the RB areas.
c. header isolation valves cannot be isolated from the control room.
d. isolation is directed when RB area Rad exceeds max safe in two or more areas.

Page 1 of 1

Proposed Answer Reference(s) EO-000-104 SC/R-1

b. correct - per EO bases FS is not a source PPOO2 of radioactivity Discuss Distracters
a. incorrect - the system is can be defeated for testing and hot work under fire watch requireiments and Appx. R provides Fire protection program guidance
c. incorrect - not an identified reason, actions would require local manual actions to isolate portion of FP header
d. incorrect - when two or more areas exceed max safe Rapid depress is directed RO SRO 1 Tier # 1 Tier #

2 Group # 1 Group #

295038 K/A 295038 K/A EK3.02 EK3.02 3.9 I-rating 4.2 I-rating K&A Statement Knowledge of the reasons for the following responses as they apply to HIGH OFF-SITE RELEASE RATE: System isolations SSES Cross-Reference Learning Objective(s) # 2598 I I _

BANK QUESTION (attach question)

FII SSES exam bank Question #

Fll INPO exam bank Question #

D Other facility exam bank Facility i2 Previous NRC exam Facility and date of exam Do Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

D SSES exam bank Question #

D INPO exam bank Question #

D Other facility exam bank Facility LI Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam Page 1 of 1

CXUEW QE STON An attachment to the examigrrwioIr-If(required to answer this question.

YES NO Attachment required is:

Review and Validation Comments TRG - Discussed comment that choice c is true by plant design but the EOP bases for this step no change to question wording.

OPS - No comments Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

ROonly SRO only i t h 3 LOD X 10CFR55.41.10 10CFR55.43 Memor Comprehension/Analysis Proposed Question (Refer to Attachment 2)

During the execution of EO-100-103 Primary Containment Control, Suppression Chamber Pressure cannot be maintained within PSL curve.

As a minimum, which of the following actions will be required to perform, and why?

a. Vent the primary containment because the containment has exceeded the Primary Containment Pressure Limit.
b. Vent the primary containment because the containment may be unable to suppress the pressure from an RPV blowdown.
c. Rapidly depressurize the RPV because the containment has exceeded the Primary Containment Pressure Limit.
d. Rapidly depressurize the RPV because the containment may be unable to suppress the pressure from an RPV blowdown.

Page 1 of 1

Proposed Answer Reference(s) EO-000-1 03

d. correct - exceeding limit requires RD per EO-100-103 PCP-9 step PCP-9 due to loss of suppression PPOO2 function (steam in SC)

Discuss Distracters

a. incorrect - venting is directed based on limit of 65 psig and TSC
b. incorrect - venting is directed based on limit of 65 psig and TSC
c. incorrect - Bases states that PCPL not limiting on PSL at SSES RO SRO 1 Tier # 1 Tier #

1 Group # 1 Group #

295024 K/A 295024 K/A EK1.01 EK1.01 4.1 I-rating 4.2 I-rating K&A Statement Knowledge of the operational implications of the following concepts as they apply to HIGH DRYWELL PRESSURE: Drywell integrity SSES Cross-Reference Learning Objective(s) # 2602 , 2604 _, I BANK QUESTION (attach question)

D SSES exam bank Question #

LI INPO exam bank Question #

LI Other facility exam bank Facility LI Previous NRC exam Facility and date of exam L Previous audit exam Facility and date of exam EDIFIEDBANK QESTION (attach quesg Question #

l INPO exam bank Question #

X Other facility exam bank Facility NMPCU2 EL Previous NRC exam Facility and date of exam EL Previous audit exam Facility and date of exam LI NEW QUESTION Page 1 of 1

An attachment to the examination will be required to answer this question.

YES X NO Attachment required is:

Review and Validation Comments TRG - Modified answer and distracters to terminology closer to bases document.

OPS - replaced "a pressurized" with "the" in choice c and d Changed LOD to 3 from 2 Page 1 of 1

3/4>

Proposed Answer Reference(s) ON-081 -001

d. correct - IAW OPS hot box concerning AD045 egress points Discuss Distracters
a. incorrect - control structure egress point does not get personnel out of hazard area
b. incorrect - unit 2 also available except CS egress
c. incorrect - this is normal ingress and egress RO SRO 3 Tier # 3 Tier #

Group # Group #

2.2.30 K/A 2.2.30 K/A 3.5 I-rating 3.3 I-rating K&A Statement Knowledge of RO duties in the control room during fuel handling such as alarms from fuel handling area/communication with fuel storage facilitylsystems operated from the control room in support of fueling operations/and supporting instrumentation SSES Cross-Reference Leaming Objective(s) # 1360 I I BANK QUESTION (attach question) a SSES exam bank Question #

j INPO exam bank Question #

F Other facility exam bank Facility LI Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam

£ 5ODFIED BANK QUESTION (attach guesia SSES e aQuestion #

LI INPO exam bank Question #

X Other facility exam bank Facility NMPCU2 a Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam LI NEW QUESTION An attachment to the examip tirnTrequired to answer this question.

YES vX quire Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only 3 ( h)

X 10CFR55.41. 10 10CFR55.43 G undamentam Comprehension/Anajysis Proposed Question kmefje to Afthc ii, it Jl Which one of the following control rod insertion methods identified in EO-1 00-113 Sheet 2, "Control Rod Insertion", requires that the scram be reset?

a. Driving Rods.
b. Venting Scram Air Header.
c. Individually Scramming Rods.
d. Vent CRD Overpiston Volume.

Page 1 of 1

Proposed Answer Reference(s) EO-100-113 Sht. 2

c. correct - per EO-1 00-1 13 Sht. 2, steps CR- PPOO2 13 Discuss Distracters
a. incorrect - only requires bypassing of RWMIIRSCS
b. incorrect - depressurizes scram air hdr regardless of RPS status
d. incorrect - does not require RPS reset to execute CR-24 RO SRO 3 Tier # 3 Tier #

Group # Group #

2.1.23 KIA 2.1.23 K/A 3.9 I-rating 4.0 I-rating K&A Statement Ability to perform specific system and integrated plant procedures during different modes of plant operation SSES Cross-Reference Learning Objective(s) # 2638 I, C YAK O}E~rlON(attach queto) ,

X SSE exm an iestion # PP002 /2680/ 6 jj INPO exam bank QU iestion #

2 Other facility exam bank Fa cility D Previous NRC exam Facility and date of exam D Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

IZ SSES exam bank Question #

DINPO exam bank Question #

D1 Other facility exam bank Facility D Previous NRC exam Facility and date of exam 1 Previous audit exam Facility and date of exam FII NEW QUESTION Page 1 of 1

An attachment to the exam t quired to answer this question.

YESN Attachment required is:

Review and Validation Comments TRG - Dropped cognitive level to Memory OPS - ended stem at reset. Remainder of stem caused confusion as to procedurally or what might work anyway Replaced choice d with Vent Overpiston volume since cooling water pressure will not usually work without reset of scram Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

ROonly SRO only (h 3 LOD X IOCFR55.41.4 10CFR55.43 Memory/Fundamental XComprehe Proposed Question (Refer to Attachment 2)

While operating at 90% RTP on Unit 1 a Feedwater Heater normal level control valve malfunction causes level in the 28 Feedwater heater to rise. The Emergency Dump valve fails to open.

The following alarms have just been received:

  • AR-120 807, FW HTR 2B HI-HI LEVEL
  • AR-120 H07, FW LOOP B PANEL 1C102 TROUBLE Which one of the following identifies the Feedwater Heater string isolation status under these conditions?
a. Should have isolated immediately.
b. Isolates immediately if RPV level drops to 30 inches.
c. Will isolate after 30 seconds if heater level is not lowered.
d. Will isolate after 30 seconds if RPV level drops to 30 inches.

Page 1 of 1

Proposed Answer Reference(s) TM-OP-047-ST

c. correct - Hi-Hi IvI isolates string after TD AR-120-001 has expired if level is still high-high AR-101-001 Discuss Distracters
a. incorrect - this is when AR-101-D12 alarms
b. incorrect-- this is when AR-1 01-D12 alarms and RPV level is not input to isolation circuit it inputs into Recirc runback
d. incorrect - TD is right and RPV level is not input to isolation circuit it inputs into Recirc runback RO SRO 2 Tier # 2 Tier #

2 Group # 3 Group #

256000 K/A 256000 K/A K5.03 K5.03 2.6 I-rating 2.7 I-rating K&A Statement Knowledge of the operational implications of the following concepts as they apply to REACTOR CONDENSATE. SYSTEM: Heat exchanger level operation SSES Cross-Reference Learning Objective(s) # 1852b ,

BANK QUESTION (attach question)

C] SSES exam bank Question #

E] INPO exam bank Question #

LI Other facility exam bank Facility L Previous NRC exam Facility and date of exam EL Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

L SSES exam bank Question #

L INPO exam bank Question #

[L Other facility exam bank Facility Cl Previous NRC exam Facility and date of exam EL Previous audit exam Facility and date of exam CXNEUQESTION _

Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only 2 LOD X 10CFR55.41.10 10CFR55.43 Memory/Fundamental (Ch ehsion/Analysi Proposed Question (Refer to Attachment 2)

During a refueling outage on Unit 2, a Refuel Floor area radiation alarm annunciates in the control room. The PCOM enters ON-081-001, "Fuel Handling Accidents", and directs the Refuel Floor SRO to evacuate the Refuel Floor.

Which one of the following identifies the egress path(s) that should be utilized by personnel on the Refuel Floor?

a. Any egress point.
b. Any Unit 1 egress point only.
c. Normal Unit 2 egress point only.
d. Any egress point except the control structure egress.

Page 1 of 1

CX EWQTITON An attachment to the examination will be required to answer this question.

YES X NO Attachment required is:

Review and Validation Comments TRG - Modified choice d to include another control rod choice to balance distracters and prevent b from being obvious answer (only choice with control rod situation)

OPS - changed distracters to add more plausibility Page 1 of 1

Proposed Answer Reference(s) TM-OP-078K-ST

c. correct - rod block will interrupt rod motion thereby limiting reactivity addition during this transient per design Discuss Distracters
a. incotrect - rod block would not limit the reactivity event since block will not stop a drifting rod due to directional solenoid failures.
b. incorrect - rod block would not limit the reactivity event since block will not stop a scrammed rod motion
d. incorrect - rod block would not limit the reactivity event since block will not stop an uncoupled rod drop RO SRO 1 Tier # 1 Tier #

I Group # 1 Group #

295014 K/A 295014 K/A AK3.02 AK3.02 3.7 I-rating 3.7 I-rating K&A Statement Knowledge of the reasons for the following responses as they apply to INADVERTANT REACTIVITY ADDITION: Control rod blocks SSES Cross-Reference Learning Objective(s) # 1549a ,I , I BANK QUESTION (attach question)

LI SSES exam bank Question #

LI INPO exam bank Question #

El Other facility exam bank Facility El Previous NRC exam Facility and date of exam L Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

Li SSES exam bank Question #

L INPO exam bank Question #

L Other facility exam bank Facility El Previous NRC exam Facility and date of exam Cl Previous audit exam Facility and date of exam Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only 3 LOD X 10CFR55.41.6 1 OCFR55.43 Memory/Fundamental mehe nsio naaysis Prooosed Question (Refer to Attachment 2)

Which one of the following conditions results in a ROD OUT BLOCK which successfully stops the reactivity transient?

Assume the center control rod.......

a. drifts from position 00 to 48.
b. scrams from position 24 to 00.
c. is continuously withdrawn from position 00 to 48.
d. becomes uncoupled and drops from position 00 to 48.

Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only 0 2 LOD X 10CFR55.41.13

~- 10CFR55.43 XMemo Comprehension/Analysis Proposed Question (Refer to Attachment 2)

A rise in fission product concentration in the Fuel Pool Cooling and Cleanup Spent Fuel Pool system will result if the:

a. cask storage gates are removed.
b. fuel pool average water temperature rises above 11 00 F.
c. SDHR is in service and pump discharge pressure is 110 psig.
d. filter/demineralizers are bypassed.

Page 1 of 1

An attachment to the examination will be required to answer this question.

YES X NO Attachment required is:

Review and Validation Comments TRG - Modified to column format OPS - Modified Recirc response to be runback when valves fully close or when level drops in alternating choices.

Modified stem conditions to identify that isolation has not timed out NRC - removed Recirc circuit in choices to eliminate overlap with other questions (Both 6 and 18)

Page 1 of 1

Proposed Answer Reference(s) TM-OP-035-ST

d. correct - concentration will rise without OP-135-001 removal by filter Discuss Distracters
a. incomect - part of SSES commitment for heat removal from pool at max heat load
b. incorrect - this temp is identified in OP as possible release of existing fission products to atmosphere
c. incorrect - Normal discharge pressure is confirmed >80 psig. Pump may trip if >200 psig for greater than 1 minute per procedure caution.

RO SRO 2 Tier # 2 Tier #

3 Group # 3 Group #

233000 K/A 233000 K/A K3.05 K3.05 2.6 I-rating 2.8 I-rating K&A Statement Knowledge of the effect that a loss or malfunction of the FUEL POOL COOLING AND CLEAN-UP will have on the following: Fuel pool water fission product concentration SSES Cross-Reference Learning Objective(s) # 2204d I I BANK QUESTION (attach question)

LI SSES exam bank Question #

LI INPO exam bank Question #

R Other facility exam bank Facility .

El Previous NRC exam Facility and date of exam L Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

LI SSES exam bank Question #

E] INPO exam bank Question # .

a Other facility exam bank Facility _ _

a Previous NRC exam Facility and date of exam Page 1 of 1

l] Previous audit exam Facility and date of exam

< UESTION E

An attachment to the examination will be required to answer this question.

YES X NO Attachment required is: -

Review and Validation Comments TRG - Modified stem focus to ask for "condition" OPS - changed choice c valve from "22 feet" to "23 feet" Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only B X 10CFR55.41.7 10CFR55.43

- ._Memory/Fundamental gehenion/ nsis-Proposed Question Core reload is in progress on Unit 1. As the PCOM you make the following observations after a fuel bundle has been inserted into the core:

  • SRM counts are 250 cps and slowly rising
  • SRM period is slightly positive and stable
  • All control rods are fully inserted, except 14-15, which is uncoupled for drive repairs Which one of the following categorizes the present condition and actions that should be directed from the control room?

The indicated conditions are.....

a. abnormal and suspension of core reloading should be directed.
b. abnormal and immediate core unloading near the SRMs should be directed.
c. normal however determination of SRM signal to noise ratio should be directed.
d. normal and continued core reload should be directed per the FACCTAS sheet.

Page 1 of 1

Proposed Answer Reference(s) ON-081 -001

a. correct - positive stable period indicates AD045 loss of SDM Discuss Distracters
b. incorrect - removals should only be done per a revised FACCTAS
c. incorrect - loss of SDM is not normal and S:N is directed if <3 cps
d. incorrect - loss of SDM is not normal and conduct of SR-1 00-1 09 would prevent this RO SRO 2 Tier # 2 Tier #

3 Group # 2 Group #

234000 K/A 234000 KIA A1.03 A1.03 3.4 I-rating 3.9 I-rating K&A Statement Ability to predict and/or monitor changes in parameters associated with operating the FUEL HANDLING EQUIPMENT controls including: Core reactivity level SSES Cross-Reference Learning Objective(s) # 1354 I I TION (ch que Question #

LI INPO exam bank Question #

X Other facility exam bank Facility NMPCU2 fl Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

LI SSES exam bank Question #

LI INPO exam bank Question #

LI Other facility exam bank Facility LI Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam L NEW QUESTION Page 1 of 1

An attachment to the examinlaipLberequired to answer this question.

YES Attachment required is:

Review and Validation Comments TRG - Modified choice b to eliminate it as possible option.

Clarified stem focus.

OPS - modified stem to identify "after a bundle" vs. 'last of 648" to make choice d plausible Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only h I X 10CFR55.41.9 10CFR55.43

- z.Memory/Fundamental treh eni nionalys Proposed Question (Refi to ALL 4 j ,sz1 22 With both Units at 100% RTP, work on the Control Room HVAC caused smoke to be generated in the duct work feeding the control room. Operators utilize the Control Structure (CS) smoke removal system aligned to the Control Room to remove the smoke odor.

Which one of the following identifies the resulting Control Structure habitability envelope pressure relative to the Turbine Building area and the operational impact this pressure will have if the SSES Design basis Accident were to occur?

a. Positive pressure in the Control Room could prevent CREGASS dampers from repositioning on initiation.
b. Positive pressure in the Control Room could result in increased air infiltration and radiation dose to the Control Room operators.
c. Negative pressure in the Control Room could prevent CREOASS dampers from repositioning on initiation.
d. Negative pressure in the Control Room could result in increased air infiltration and radiation dose to the Control Room operators.

Page 1 of 1

Proposed Answer Reference(s) OE 12227

d. correct - OE 12227 identified neg pressure TM-OP-030-ST that would cause infiltration OP-030-002 Discuss Distracters
a. incorrect - smoke removal draws air out of CR causing neg pressure, CREOASS concern on initiatiafron is that smoke removal fans will not trip
b. incorrect - smoke removal draws air out of CR causing neg pressure
d. incorrect - CREOASS concern on initiatiation is that smoke removal fans will not trip 2 Tier # 2 Tier #

2 Group # 2 Group #

290003 K/A 290003 K/A K5.01 K5.01 3.2 l-rating 3.5 I-rating K&A Statement Knowledge of the operational implications of the following concepts as they apply to CONTROL ROOM HVAC: Airborne contamination (e.g. radiological, toxic gas, smoke) control SSES Cross-Reference Learning Objective(s) # 10457c I I BANK QUESTION (attach question)

LI SSES exam bank Question #

[L INPO exam bank Question #

LI Other facility exam bank Facility LI Previous NRC exam Facility and date of exam L1 Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

LI SSES exam bank Question #

LI INPO exam bank Question #

LI Other facility exam bank Facility -

LI Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam G E UESTION Page 1 of 1

An attachment to the examinaba required to answer this question.

YES NO Attachment required is:

Review and Validation Comments TRG -Question regarding this as required knowledge discussed K/A "operational impacts" will send to validation with ops for their comment regarding this knowledge.

OPS - changed stem wording to "work" vs. "sheet metal" Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only (th 2 LOD x 10CFR55.41 .8 10CFR55.43 Memory/Fundamental hen slo n/A nalys Proposed Question (Refer to Attachment 2)

While operating at 100% RTP on Unit 1, a loss of Non-class 1E 120 VAC control power to the Reactor Building Closed Cooling Water (RBCCW) and Reactor Building Chilled Water (RBCW) crosstie valves occurs.

Which one of the following identifies the alignment of cooling to the Drywell with this loss?

RBCCW RBCW

a. auto open auto close
b. auto open remain open
c. remain closed auto close
d. remain closed remain open Page 1 of 1

Proposed Answer Reference(s) TM-OP-014-ST

a. correct - During loss of control power shift RBCW to the "Drywell Cooling" mode.

Discuss Distracters

b. incorrect - RBCCW valve failure.
c. incoirect -RBCW valve failure.
d. incorrect -this is normal lineup.

RO SRO 2 Tier # 2 Tier #

2 Group # 2 Group #

400000 KIA 400000 K/A K2.02 K2.02 2.9 I-rating 2.9 I-rating K&A Statement Knowledge of the electrical power supplies to the following: CCW valves SSES Cross-Reference Learning Objective(s) # 10255 I I, BANK QUESTION (attach question)

F- SSES exam bank Question #

DINPO exam bank Question #

a Other facility exam bank Facility Eli Previous NRC exam Facility and date of exam D1 Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

D SSES exam bank Question #

D INPO exam bank Question #

DOther facility exam bank Facility F1 Previous NRC exam Facility and date of exam D Previous audit exam Facility and date of exam CXNEUESTION An attachment to the examina ieq red to answer this question.

YES NO Page 1 of 1

Attachment required is:

Review and Validation Comments TRG - Modified choices to column format Removed ESW valves Changed power loss to individual logic power vs. LOOPe OPS - identified column one and two swapped - corrected Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only L X 10CFR55.41.7 10CFR55.43 Memor Comprehension/Analysis Proposed Question (flFep to AtbahmeM 2.)

Which one of the following identifies the reason for the Secondary Containment Isolation that occurs if a High Drywell pressure condition is sensed by the Primary Containment Isolation System (PCIS) logic?

a. To maintain the RB pressure at its normal negative pressure under conditions which indicate an actual release of radioactive materials into the RB.
b. To maintain the RB pressure at its normal negative pressure under conditions which have a potential to release of radioactive materials into the RB.
c. To take the RB pressure from its normal negative pressure to a positive pressure under conditions which indicate an actual release of radioactive materials into the RB.
d. To take the RB pressure from its normal negative pressure to a positive pressure under conditions which have a potential to release of radioactive materials into the RB.

Page 1 of 1

Proposed Answer Reference(s) TM-OP-034-ST

b. correct - RB is normally negative and LOCA TM-OP-059B-ST isolation is for potential release into RB from DW Discuss Distracters
a. incorrect - bases for High Exh Rad isolation
c. incorect - CR vent takes space positive and this is bases for High Exh Rad isolation
d. incorrect - CR vent takes space positive RO SRO 1 Tier # 1 Tier #

1 Group # 1 Group #

295024 K/A 295024 K/A EK3.09 EK3.09 3.1 I-rating 3.6 I-rating K&A Statement Knowledge of the reasons for the following as they apply to HIGH DRYWELL PRESSURE: Auxilary building isolation SSES Cross-Reference Learning Objective(s) # 2120c

  • II BANK QUESTION (attach question)

Eli SSES exam bank Question #

E] INPO exam bank Question #

E Other facility exam bank Facility El Previous NRC exam Facility and date of exam El Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

El SSES exam bank Question #

El INPO exam bank Question #

E1 Other facility exam bank Facility El Previous NRC exam Facility and date of exam El Previous audit exam Facility and date of exam S QUESTION An attachment to the examination will be required to answer this question.

Page 1 of 1

YES Attachment required is:

Review and Validation Comments TRG - No Comments OPS -swapped + and - in choice c and d to read more plausible _

Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable) c 7 t 3 LOD RO only SRO only X 10CFR55.41. 10 10CFR55.43 Memory/Fundamental mehn nionlysis Proposed Question (Refer to Attachment 2)

With Unit 1 at 100% RTP, which one of the following identifies the valve position and feedwater flow indication that would be observed if Instrument Air pressure were lost to an operating Reactor Feedwater Pump Recirc Valve (FV-10604)?

a. Valve would fail to full open position and not effect flow to the vessel.
b. Valve would fail to full open position and reduce flow to the vessel.
c. Valve would fail to full closed position and not effect flow to the vessel.
d. Valve would fail to full closed position and reduce flow to the vessel.

Page 1 of 1

Proposed Answer Reference(s) ON-1 18-001

b. correct - valve fails open on loss of IA and TM-OP-045-ST diverts flow from the RPV Discuss Distracters
a. incorrect - this would occur if valve were already open
c. incorrect - this would occur if valve failed closed on loss of IA
d. incorrect - NP, if valve were open and then failed closed flow to RPV would rise RO SRO 1 Tier # 1 Tier #

2 Group # 2 Group #

295019 K/A 295019 K/A AA1.02 AA1.02 3.3 I-rating 3.1 I-rating K&A Statement Ability to operate and/or monitor the following as they apply to PARTIAL OR COMPLETE LOSS OF INSTRUMENT AIR: Instrument air system valves SSES Cross-Reference Learning Objective(s) # 10297a , , _

BANK QUESTION (attach question)

LI SSES exam bank Question #

LI INPO exam bank Question #

LI Other facility exam bank Facility LI Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

L SSES exam bank Question #

LI INPO exam bank Question #

LI Other facility exam bank Facility LI Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam QUESTION jz.

Page 1 of 1

An attachment to the examinnaeqU..bP..required to answer this question.

YES NO Attachment required is:

Review and Validation Comments TRG - eorrected typo in answer justification OPS - Reworded stem to read better Changed LOD to 3 from 2 Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only X 10CFR55.41.8 10CFR55.43 XMemnor Comprehension/Analysis Proposed Question (Refer Lo Alttsh.el ,l 2)

During a Station Blackout Unit 1 is required per EO-100-030, "Unit 1 Response To Station Blackout", to open 250 VDC Load Center breakers to 1D155 and 1D165. EO-200-030, "Unit 2 Response To Station Blackout", does NOT direct the same actions for 2D155 and 2D165.

Which one of the following explains this difference in actions between the two units?

Unit 2 load centers 2D155 and 2D165.....

a. are supplied from non-1 E battery.
b. can be connected to the Blue Max diesel.
c. are supplied from larger capacity batteries.
d. carry vital loads needed to cope with a Station Blackout.

Page 1 of 1

Proposed Answer Reference(s) AD045

a. correct - Unit 2 non vital loads are carried EO-1 00-030 on 2D140 to ensure 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> battery capacity EO-200-030 PPOO2 Discuss Distracters
b. incorrect - this is true for both units therefore not he reason for the diff
c. incorrect - vital batteries are same design and capacity
d. incorrect - these LCs carry non-vital loads RO SRO 1 Tier # 1 Tier #

2 Group # 1 Group #

295003 K/A 295003 K/A AK2.01 AK2.01 3.2 I-rating 3.3 I-rating K&A Statement Knowledge of the interrelations between PARTIAL OR COMPLETE LOSS OF A.C. POWER and the following: Station batteries SSES Cross-Reference Learning Objective(s) # 1360 , 2679 _, _I K QESTON attach questin]s luestion # PPOO2 (2679/ 3 LI INPO exam bank Cluestion #

[] Other facility exam bank Facility .

LI Previous NRC exam Facility and date of exam -

LI Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

LI SSES exam bank Question #

LI INPO exam bank Question # .

LI Other facility exam bank Facility LI Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam LI NEW QUESTION Page 1 of 1

An attachment to the exami ~aiOrrwW.1wrequired to answer this question.

YES NO Attachment required is:

Review and Validation Comments TRG - No comments OPS - corrected LC number for both units Reworded choice a to read better Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only h 2 LOD X 10CFR55.41.10 10CFR55.43 Memory/Fundamental Proposed Question (Refer to Attachment 2)

During an ATWS event on Unit 1, the Suppression Pool temperature has reached 2300 F on SPOTMOS indications.

RHR loop B is operating in Suppression Chamber Spray mode.

RHR loop A is operating in Suppression Pool Cooling mode.

Which RHR Loop A or B suction temperature cannot be used to determine Suppression Pool temperature?

a. RHR loop A suction due to exceeding the instrument range.
b. RHR loop A suction due to insufficient flow in the suction piping.
c. RHR loop B suction due to exceeding the instrument range.
d. RHR loop B suction due to insufficient flow in the suction piping.

Page 1 of 1

Proposed Answer Reference(s) EO-000-103

d. correct - flow must be >5000 gpm for this EO-100-103 indication to be used PP002 Discuss Distracters
a. incorrect - instrument reads to 6000 F
c. incorrect - flow would be >5000 gpm in SPC mode
b. /. incorrect - instrument reads to 6000 F RO SRO 1 Tier # 1 Tier #

2 Group # 1 Group #

295026 K/A 295026 K/A EK3.03 EK3.03 3.5 I-rating 3.8 I-rating K&A Statement Knowledge of the reasons for the following responses as they apply to SUPPRESSION POOL HIGH WATER TEMPERATURE: Suppression pool spray SSES Cross-Reference Learning Objective(s) # 2598 I I BANK QUESTION (attach question)

LI SSES exam bank Question #

LI INPO exam bank Question #

LI Other facility exam bank Facility LI Previous NRC exam Facility and date of exam L Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

L SSES exam bank Question #

L INPO exam bank Question #

LI Other facility exam bank Facility aI Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam CX NI O NSIO Page 1 of 1

An attachment to the examrin rrequired to answer this question.

YES NO Attachment required is:

Review and Validation Comments TRG - Removed reasons for RHR lineups from stem.

OPS - No comments Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only ( th 2 LOD X 10CFR55.41.10 10CFR55.43 CXy/Fundamental Comprehension/Analysis Proposed Question (Refer to Attachment 2)

Which one of the following describes the operation and concern for operating Reactor Core Isolation Cooling (RCIC) system with Suppression Pool level below 17 feet?

Operation Concern

a. Permitted Vortex Limit has been exceeded
b. Permitted Direct containment pressurization will occur
c. Not permitted Vortex Limit has been exceeded
d. Not permitted Direct containment pressurization will occur Page 1 of 1

Proposed Answer Reference(s) EO-000-1 03

b. correct - <17' may uncover RCIC exhaust EO-1 00-1 03 PPOO2 Discuss Distracters
a. incorrect - RCIC VL is not limiting at any SP level
c. incorrect - RCIC ops is permitted and RCIC VL is not limiting at any SP level
d. incorrect - analysis indicates RCIC will not overpressurize PC and will auto isolate RO SRO 1 Tier # 1 Tier#

2 Group # 1 Group #

295030 K/A 295030 KIA EA1.02 EA1.02 3.4 I-rating 3.5 I-rating K&A Statement Ability to operate and/or monitor the following as they apply to LOW SUPPRESSION POOL WATER LEVEL: RCIC SSES Cross-Reference Learning Objective(s) # 2627 ,

BANK QUESTION (attach question)

LI SSES exam bank Question #

L INPO exam bank Question #

L Other facility exam bank Facility L Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

LI SSES exam bank Question #

LI INPO exam bank Question #

LI Other facility exam bank Facility LI Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam X EWUESTION Page 1 of 1

An attachment to the examina3rTMTbe..Wquired to answer this question.

YES Attachment required is:

Review and Validation Comments TRG -'Modified stem for focus Dropped cognitive level to Memory OPS - Reformatted into column format Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

ROonly SRO only <T 3 3 LOD X 10CFR55.41. 10

-- 10CFR55.43 Memo Comprehension/Analysis Proposed Question (Refer to Attachment 2)

Which one of the following identifies the component and the concern when drywell temperature reaches 3400 F during implementation of EO-100-103, "PC Control"?

High drywell temperature is above the design temperature of the......

a. Hydrogen Recombiners and could cause a failure to operate.
b. SRVs and could cause failure of the valves to open on high RPV pressure.
c. Primary Containment structure and could cause failure of the containment boundary.
d. Inboard Drywell Spray valves and could cause failure of the valves to open.

Page 1 of 1

Proposed Answer Reference(s) EO-000-103

c. correct - 340 is design temp of PC EO-100-103 PPOO2 Discuss Distracters
a. incorrect - Hydrogen Recombiners are designed to operate at 1250 degrees F per procedure
b. incorrect - SRV design above 340
d. incorrect - NP, valves located outside PC RO SRO 1 Tier # 1 Tier #

2 Group # 2 Group #

295028 K/A 295028 K/A EK2.02 EK2.02 3.2 I-rating 3.3 I-rating K&A Statement Knowledge of the interrelation between HIGH DRYWELL TEMPERATURE and the following: Components internal to the drywell SSES Cross-Reference Learning Objective(s) # 2598 I I BANK QUESTION (attach question)

LI SSES exam bank Question #

LI INPO exam bank Question #

LI Other facility exam bank Facility _

El Previous NRC exam Facility and date of exam L1 Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

LI SSES exam bank Question #

LI INPO exam bank Question #

Li Other facility exam bank Facility L Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam

<NEQUESTION Page 1 of 1

An attachment to the examination will be required to answer this question.

YES X NO Attachment required is:

Reviewand Validation Comments TRG - No Comments OPS - changed LOD to 3 from 2 Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only X 10CFR55.41. 10 10CFR55.43 Memor Comprehension/Analysis Proposed Question (Re1 f t, Atftehrfnt 2)

Which one of the following identifies conditions of thermal hydraulic instability in the core following a Recirculation pump trip from 80% RTP per ON-178-002, "Core Flux Oscillations"?

a. RBM "A" flow biased rod block occurs and immediately clears.
b. Peripheral LPRM downscale lights alarm and clear 10 seconds later.
c. APRMs "A, B and C" peak to peak oscillations are approximately 12% and steady.
d. Both Recirculation loop flow peak to peak oscillations are approximately 3% and steady.

Page 1 of 1

Proposed Answer Reference(s) ON-1 78-002

c. correct - per 3.3.3.a AD045 Discuss Distracters
a. incorrect - this may normally occur as flow drops followed by flux dropping
b. incorrect - LPRM indications for oscillations have a 1-5 second period
d. incorrect - core flow has some cycling due to flow noise or may indicate a Recirc problem RO SRO 3 Tier # 3 Tier #

Group # Group #

2.4.21 K/A 2.4.21 K/A 3.7 I-rating 4.3 I-rating K&A Statement Knowledge of the parameters and logic used to assess the status of safety functions including: Reactivity control .....

SSES Cross-Reference Learning Objective(s) # 1354 , ,I BANK QUESTION (attach question)

LI SSES exam bank Question # _

L INPO exam bank Question #

L Other facility exam bank Facility L Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

LI SSES exam bank Question #

LI INPO exam bank Question #

LI Other facility exam bank Facility a Previous NRC exam Facility and date of exam L Previous audit exam Facility and date of exam X E UESTION Page 1 of 1

An attachment to the exammti rWilrberequired to answer this question.

YES Attachment required is:

Review and Validation Comments TRG - Modified choices to eliminate original choice a and clarified choices for peak to peak-- -

OPS - no comments Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only X 10CFR55.41.7 10CFR55.43 Memory/Fundamental X Comprehension/Analy Proposed Question (Refe, oAlthon2)

A Loss of Coolant Accident has occurred on Unit 1 and a Rapid Depressurization has been performed due to low RPV level.

Which one of the following identifies the ability to monitor Hydrogen concentration in the Primary Containment under these plant conditions?

a. H2/0 2 Analyzer remains aligned for monitoring the drywell and suppression chamber air space.
b. H2/02 Analyzer remains aligned for monitoring the drywell but must be manually aligned to sample the suppression chamber air space.
c. H2/0 2 Analyzer automatically isolated but can be aligned to sample the drywell and suppression chamber air space immediately after the isolation signal is jumpered.
d. H2 /02 Analyzer automatically isolated but can be aligned to sample the drywell and suppression chamber air space after the isolation signal is automatically bypassed.

Page 1 of 1

Proposed Answer Reference(s) EO-000-1 03

d. correct -step PCIG-1 of EO-1 00-103 EO-1 00-1 03 PPOO2 .

Discuss Distracters

a. incorrect - normal lineup is drywell only
b. incorrect - this would be condition with no isolation signal
c. incorrect - No ES procedure exists and isolation auto bypass is 10 minute RO SRO 1 Tier # 1 Tier #

1 Group # 1 Group #

500000 K/A 500000 K/A EA1.01 EA1.01 3.4 I-rating 3.3 I-rating K&A Statement Ability to operate and/or monitor the following as they apply to HIGH CONTAINMENT HYDROGEN CONTROL: Primary containment hydrogen instrumentation SSES Cross-Reference Learning Objective(s) # 2621 g ,I BANK QUESTION (attach question) rII SSES exam bank Question #

F1 INPO exam bank Question #

D1 Other facility exam bank Facility a~ Previous NRC exam Facility and date of exam a Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

E SSES exam bank Question #

7 INPO exam bank Question #

D Other facility exam bank Facility D Previous NRC exam Facility and date of exam a Previous audit exam Facility and date of exam CX3EWUESTION Page 1 of 1

An attachment to the examini lequired to answer this question.

YES NO Attachment required is:

Review and Validation Comments Modified stem to reduce unnecessary information Changed wording in choice a and b to 'remains' vs. "is already" Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only X 10CFR55.41.7 10CFR55.43 Memo Comprehension/Anaiysis Proposed Question to Attachment Which one of the following identifies the method necessary to determine suppression pool temperature once the Main Control Room has been evacuated per ON-1 00(200)-

009, "Control Room Evacuation"?

To determine temperature in the suppression pool.....

a. I&C must install temporary indicators at the RSP.
b. local temperature indicators in the RHR rooms must be used.
c. suppression chamber pressure is plotted on saturation curve to derive temperature.
d. the RSP indications can be used once instrument transfer switches are placed in EMERG position.

Page 1 of 1

Proposed Answer Reference(s) ON-1 00-009

d. correct- on RSP once HSS-14901a and AD045 15110A are placed in EMERG when RSP is manned Discuss Distracters
a. incorrect - this is done for RPV level and coolant temp if PICSY is not avail.
b. incorrect - not required by On since they are available on RSP
c. incorrect - this is used to determine RPV coolant temp.

RO SRO 1 Tier # 1 Tier #

2 Group # 1 Group #

295016 K/A 295016 K/A AA2.04 AA2.04 3.9 I-rating 4.1 I-rating K&A Statement Ability to determine and interpret the following as they apply to CONTROL ROOM ABANDONMENT: Suppression pool temperature SSES Cross-Reference Learning Objective(s) # 1365d ,

BANK QUESTION (attach question)

LI SSES exam bank Question #

FI INPO exam bank Question #

LI Other facility exam bank Facility LI Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

LI SSES exam bank Question #

LI INPO exam bank Question #

LI Other facility exam bank Facility L1 Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam C UESTION E _

Page 1 of 1

An attachment to the exam - u ired to answer this question.

YES NO Attachment required is:

Review and Validation Comments TRG - Gorrected procedure number error in stem.

OPS - modified choice c wording to say suppression and reworded Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only ( t 3 2 LOD X 10CFR55.41.10 10CFR55.43 Memory/Fundamental or prehension/Analysis Proposed Question (Refer to Attachment 2)

While operating at 100% RTP on both Units, an inadvertent Zone I isolation occurs and operator actions to reset the isolation have failed. The NPO reports that Unit 1 Reactor Building differential pressure indicates downscale (0"inches WG vac with SGTS running.

Which one of the following identifies the Unit 1 procedural execution required due to this loss of Secondary Containment integrity per the attached ON-134-002, "Low RB Differential Pressure"?

a. EO-100-104, "SC Control" must be entered immediately.
b. EO-100-104, "SC Control" must be entered if integrity is not restored within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
c. GO-100-004, "Plant Shutdown To Minimum Power" must be entered immediately to be in HOT SHUTDOWN within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
d. GO-1 00-004, "Plant Shutdown To Minimum Power" must be entered if integrity not restored within 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> to be in HOT SHUTDOWN within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

Page 1 of 1

Proposed Answer Reference(s) ON-134-002

a. correct - uses SC-1 entry from ON-134-002 AD045 Discuss Distracters
b. incorrect - this would apply if the isolation could be reset and diff pressure not restored
c. incorrect - this is directed if Zone I or IlIl are OOS for > 4hours not immediately
d. incorrect - this is directed if Zone I or III are OOS for > 4hours not 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> (4 plus the 6 to get to Hot S/D)

RO SRO 1 Tier # 1 Tier #

3 Group # 2 Group #

295035 K/A 295035 K/A EK1.01 EK1.01 3.9 I-rating 4.2 I-rating K&A Statement Knowledge of the operational applications of the following concepts as they apply to the SECONDARY CONTAINMENT HIGH DIFFERENTIAL PRESSURE: Secondary containment integrity SSES Cross-Reference Learning Objective(s) # 1358 1365h.

l BANK QUESTION (attach question)

El SSES exam bank Question #

E1 INPO exam bank Question #

El Other facility exam bank Facility El Previous NRC exam Facility and date of exam El Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

El SSES exam bank Question #

El INPO exam bank Question #

El Other facility exam bank Facility El Previous NRC exam Facility and date of exam El Previous audit exam Facility and date of exam Page 1 of I

X NEWQETO An attachment to the examination will be required to answer this question.

X YES NO Attachment required is:

ON-4-002 Review and Validation Comments TRG - Modified stem to identify inadvertent isolation.

Modified stem to identify ON entry.

Removed ON condition from choice a and b.

OPS - Modified stem to unit specific and NPO gage values Modified stem to ask for Unit 1 procedures required Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only X56 Both 3 D X 10CFR55.41.7 10CFR55.43 Memory/Fundamental XComprehensionAnalysi Proposed Question (4Refe to Xtachmrnt 4 Which one of the following identifies the Standby Gas Treatment System response to a high RB pressure signal (positive RB pressure) while the train is operating in response to a LOCA signal start?

a. Fan Inlet Damper FD07551A1 will modulate open in response to the building pressure signal.
b. Fan Inlet Damper FD07551A1 will modulate closed in response to the building pressure signal
c. SGTS makeup OA Damper FD07551A2 will modulate open in response to the building pressure signal
d. SGTS makeup OA Damper FD07551A2 will modulate closed in response to the building pressure signal Page 1 of 1

Proposed Answer Reference(s) OP-070-001

d. correct - SGTS A(B) Inlet Hdr/Outdoor Diff TM-OP-070-ST Press Ctir PDIC0755OA(B) adjusts flow to maintain differential pressure of inlet header to outside pressure at setpoint by adjusting SGTS makeup OA Damper FD07551A2 Discuss Distracters
a. incorrect - opening would lower RB pressure but this damper controls to a flow setpoint
b. incorrect - closing would raise RB pressure however this damper controls to a flow setpoint
c. incorrect - this damper controls to pressure but opening would result in less flow from the RB and higher pressure RO SRO 1 Tier # 1 Tier #

3 Group # 2 Group #

295035 KIA 295035 K/A EA1.02 EA1.02 3.6 I-rating 3.8 I-rating K&A Statement Ability to operate and/or monitor the following as they apply to SECONDARY CONTAINMENT HIGH DIFFERENTIAL PRESSURE: SBGT/FRVS SSES Cross-Reference Learning Objective(s) # 10376e , I BANK QUESTION (attach question)

C SSES exam bank Question #

F INPO exam bank Question #

F Other facility exam bank Facility E Previous NRC exam Facility and date of exam F Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

LI SSES exam bank Question # _

LI INPO exam bank Question #

L Other facility exam bank Facility -

Page 1 of 1

Preious audit exam Facility and date of exam X: NEW QUESTIO An attachment to the examiquired to answer this question.

YES N Attachment required is:

Review and Validation Comments No comments Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only E t h )

X 10CFR55.41.7 10CFR55.43 Memory/Fundamental orehension/Ana Proposed Question (Reter to AttalclmerL,2 Unit 1 was at 100% RTP when a Loss of Coolant Accident occurred. The following plant conditions exist:

  • RPV level is -100 inches and slowly rising
  • RPV pressure is 190 psig and lowering
  • Drywell pressure is 25 psig and lowering Which one of the following describes the effect a failure of the Primary Containment Isolation System logic to generate an isolation signal to the Reactor Recirculation System will have under these conditions?
a. Recirculation sample lines will not isolate as designed due to low-level.
b. Recirculation sample lines will not isolate as designed due to drywell pressure.
c. Recirculation loop discharge and discharge bypass valves will not isolate as designed due to low-level.
d. Recirculation loop discharge and discharge bypass valves will not isolate as designed due to drywell pressure.

Page 1 of 1

Proposed Answer Reference(s) TM-OP-059B-ST

a. correct - PCIS L2 signal isolates sample TM-OP-064C-ST valves HV-1F019 and 20 Discuss Distracters
b. incorrect - DW pressure signal does not isolate sample
d. incorrect - pump discharge valves isolate from LPCI initiation signal with low RPV pressure
c. incorrect - pump discharge valves isolate from LPCI initiation signal RO SRO 2 Tier # 2 Tier #

1 Group # 1 Group #

223002 K/A 223002 K/A K3.14 K3.14 3.0 I-rating 3.0 I-rating K&A Statement Knowledge of the effect that a loss or malfunction of the PCIS/NUCLEAR STEAM SUPPLY SHUTOFF will have on the following: Recirculation system SSES Cross-Reference Learning Objective(s) # 2522n I I BANK QUESTION (attach question)

FII SSES exam bank Question #

D] INPO exam bank Question #

D] Other facility exam bank Facility E Previous NRC exam Facility and date of exam z Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

F SSES exam bank Question #

F INPO exam bank Question #

F Other facility exam bank Facility F Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam CX NEW QETO Page 1 of 1

An attachment to the examo wi eq equired to answer this question.

YES NO Attachment required is:

Review-and Validation Comments TRG - Concern that c and d choices can be easily eliminated since they are not containment isolations, will leave as is and receive feedback during ops validation.

OPS - reformatted providing plant parameters to evaluate Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only E h 2 LOD X 10CFR55.41.10 10CFR55.43 Memory/Fundamental (ehenson/Anlsis Proposed Question (Refer to Attachment 2)

A leak in the CS pump suction resulted in Suppression Pool level dropping to 19 feet prior to isolating the leak on Unit 1.

Which one of the following identifies the flow restraint (if any) on the use of RHR Loop 1A to inject into the RPV? The Vortex Limit curve is attached for your use.

a. Any flow rate may result in damage.
b. Flow rates above 7000 gpm may result in damage.
c. Flow rates below 7000 gpm may result in damage.
d. All flow rates are acceptable without damage.

Page 1 of 1

Proposed Answer Reference(s) EO-000-1 03

d. correct - any flow above 18 feet is EO-1 00-1 03 acceptable for RHR PPOO2 Discuss Distracters
a. incorrect - this would be true with level in pool beLow 18 feet
b. incorrect - this is flow at 19 feet and CS VL line
c. incorrect - this is reverse of b RO SRO 2 Tier # 2 Tier #

1 Group # 1 Group #

203000 K/A 203000 K/A K6.06 K6.06 3.8 I-rating 3.9 I-rating K&A Statement Knowledge of the effect that a loss or malfunction of the following will have on the RHRILPCI INJECTION MODE: Suppression pool SSES Cross-Reference Learning Objective(s) # 2630 _

BANK QUESTION (attach question)

D SSES exam bank Question #

INPO exam bank Question #

D II Other facility exam bank Facility Fo Previous NRC exam Facility and date of exam

'o Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

SSES exam bank Question #

DINPO exam bank Question #

LIOther facility exam bank Facility .

LI Previous NRC exam Facility and date of exam Previous audit exam Facility and date of exam ESTION Page 1 of 1

( YE)

,)erirttaeMent to the examination will be required to answer this question.

NO Attachment required is:

EO-1 00-1 03 Vortex Limit figure 7 Review and Validation Comments TRG -No comments OPS - verify reading graph correctly Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only (h X 10CFR55.41.7 10CFR55.43 CFundamentar D Comprehension/Analysis Proposed Question ltu A[Ld-.Jt, Mf1e r 2 While operating at 70% RTP on Unit 2 the 'A' Rod Block Monitor Gain Change Unit flux output drops to 0%.

Which one of the following identifies the effect this condition will have on the RBM and Reactor Manual Control System?

'A' RBM RMCS

a. Auto bypass alarm Applies rod block
b. Auto bypass alarm No rod block applied
c. Downscale alarm' Applies rod block
d. Downscale alarm No rod block applied Page 1 of 1

Proposed Answer Reference(s) TM-OP-078K-ST

c. correct - with power >30% flux <5% will trip RBM downscale and apply block thru RMCS Discuss Distracters
a. incorrect - this would occur if input APRM went downscale <30% and block would not be appliedwith RBM bypassed
b. incorrect - this would occur if input APRM went downscale <30%
d. incorrect - this would occur if power were

<30%

RO SRO 2 Tier # 2 Tier #

2 Group # 2 Group #

215002 K/A 215002 K/A K3.01 K3.01 3.3 I-rating 3.5 I-rating K&A Statement Knowledge of the effect that a loss or malfunction of the ROD BLOCK MONITOR SYSTEM will have on the following: Reactor manual control system SSES Cross-Reference Learning Objective(s) # 1547c , 1549a - _ _ _I BANK QUESTION (attach question)

I SSES exam bank Question #

I INPO exam bank Question #

DOther facility exam bank Facility jj Previous NRC exam Facility and date of exam F Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

E SSES exam bank Question #

E INPO exam bank Question #

a Other facility exam bank Facility E Previous NRC exam Facility and date of exam g Previous audit exam Facility and date of exam Page 1 of 1

KQUES TEST1ON An attachment to the examiop..iuuW trequired to answer this question.

YES Attachment required is:

Review and Validation Comments TRG - No comments OPS - reworded stem for clarity Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment I (Form ES-401-6 comparable)

RO only SRO only (2 D X 10CFR55.41. 10 10CFR55.43 Memory/Fundamental oehension/Analysis -

Proposed Question Or to Ai!xJ imt2 While operating at 100% RTP on Unit 1 a FW Heater 5B level instrument failure drives the 5B FWH Dump valve full open.

Which one of the following identifies the response of the Feedwater Heater Drain system and action that should be taken to correct?

a. FW heater 5B level will go low, close 5B Dump valve from 1C1 02.
b. FW heater 4B level will go high, close 5B Dump valve from 1C1 02.
c. FW heater 5B level will go low, close B Heater string isolation valves from control room.
d. FW heater 48 level will go high, close B Heater string isolation valves from control room.

Page 1 of I

Proposed Answer Reference(s) AR-1 20-001

a. correct - dump valve will drop level (to TM-OP-047-ST condenser) requiring local closure per AR Discuss Distracters
b. incorrect - 4B heater will receive less input with 53 drains diverted to condenser
c. incorrect - isolation valve closure is automatic on 1 or 2 Htr hi-hi level
d. incorrect - - isolation valve closure is automatic on 1 or 2 Htr hi-hi level RO SRO 2 Tier # 2 Tier #

2 Group # 3 Group #

256000 K/A 256000 K/A A2.09 A2.09 2.8 I-rating 2.8 I-rating K&A Statement Ability to (a) predict the impacts of the following on the REACTOR CONDENSATE SYSTEM and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Low feedwater heater level SSES Cross-Reference Learning Objective(s) # 1852b I I BANK QUESTION (attach question)

LI SSES exam bank Question #

II INPO exam bank Question #

FII Other facility exam bank Facility FII Previous NRC exam Facility and date of exam L Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

Fii SSES exam bank Question #

LI INPO exam bank Question #

aI Other facility exam bank Facility LI Previous NRC exam Facility and date of exam Page 1 of 1

D Previous audit exam Facility and date of exam KNWQESTIONp An attachment to the examin_%4a.wiU..eequired to answer this question.

YES NO Attachment required is:

Review and Validation Comments TRG -

OPS -

Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only (E h 2 LOD X 10CFR55.41.5 10CFR55.43 Memory/Fundamental eh no n/Ah ysis Proposed Question (Refer to Attachment 2)

Which one of the following describes the effect on reactor pressure and power if one Turbine Bypass Valve failed open while operating at 100% RTP on Unit 1?

RPV pressure would drop until....

a. Turbine Control Valves close to restore pressure, reactor power would drop and remain lower than initial power level.
b. Maximum Combined flow limits depressurization, reactor power would drop and remain lower than initial power level.
c. Turbine Control Valves close to restore pressure, reactor power would drop and then return to approximately initial power level.
d. Maximum Combined flow limits depressurization, reactor power would drop and then return to approximately initial power level.

Page 1 of 1

Proposed Answer Reference(s) TM-OP-093L-ST

c. correct - with BPV opens pressure drops TM-OP-093E-ST lowering power, throttle pressure change closes TCVs to restore pressure and power will return as steam flow returns to original with

-5% going thru BPV now instead of TCVs Discuss Distracters

a. incorrect - as pressure returns to original power will return as void collapse
b. incorrect - MAX COMBINED FLOW will limit electrical signal to TCVs and BPVs to limit flow to -105%
d. incorrect - MAX COMBINED FLOW will limit electrical signal to TCVs and BPVs to limit flow to -105%

RO SRO 2 Tier # 2 Tier #

1 Group # 1 Group #

241000 K/A 241000 K/A K5.03 K5.03 3.5 I-rating 3.6 I-rating K&A Statement Knowledge of the operational implications of the following concepts as they apply to the REACTOR/TURBINE PRESSURE REGULATING SYSTEM:

Reactor power vs. reactor pressure SSES Cross-Reference Learning Objective(s) # 10020a I I BANK QUESTION (attach question)

LI SSES exam bank Question #

FI1 INPO exam bank Question # .

LI Other facility exam bank Facility .

FI Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam Y SSES exam hank Question # SY017A08/C 12 11 ____ -I,---- --

Page 1 of 1

D INPO exam bank Question #

D Other facility exam bank Facility D Previous NRC exam Facility and date of exam D Previous audit exam Facility and date of exam NEW QUESTION An attachment to the examipstZlRItilff.equired to answer this question.

YES NO Attachment required is:

Review and Validation Comments TRG - changed EHC to Turbine in stem OPS - added reactor to all choices to direct answer to RX power not Generator Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only X 10CFR55.41.8 10CFR55.43 Memy/Fundamenta Comprehension/Analysis Proposed Question (Refer tovArald1.aIft 2)

Which one of the following identifies the purpose of the shunt trip breakers OB565-IA and OB565-1 B associated with DG E?

a. Protect DG E from electrical faults on Unit 1 4KV ESS Buses 1A and 1B.
b. Provide separation between 1E and non-1 E distribution when DG E is supplying 0B565.
c. Protect DG E from electrical faults on the Unit 1 4KV ESS Bus 1A and Unit 2 4KV ESS Bus 2B.
d. Provide separation between 1E and non-1 E distribution when DG E automatically starts during a LOCA.

Page 1 of 1

Proposed Answer Reference(s) TM-OP-024A-ST

b. correct - trip on UV Discuss Distracters
a. incorrect - does not connect DG to ESS Busses
c. incorrect - does not connect DG to ESS Busses
d. incorrect - does not connect DG to ESS Busses and does not auto start on LOCA in test (DG TRIPS)

RO SRO 2 Tier # 2 Tier #

2 Group # 1 Group #

262001 K/A 262001 K/A K1.01 K1.01 3.8 I-rating 4.3 I-rating K&A Statement Knowledge of the physical connections and/or cause-effect relationships between AC ELECTRICAL DISTRIBUTION and the following: Emergency generators SSES Cross-Reference Learning Objective(s) # 2073a I._ I_ I ANK QUESTION (attach question X SSES exam bank Question # SY0171G1A/2073/ 2 f1 INPO exam bank Question # .

D Other facility exam bank Facility D Previous NRC exam Facility and date of exam D Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question) ill SSES exam bank Question #

D INPO exam bank Question #

F Other facility exam bank Facility D Previous NRC exam Facility and date of exam Page 1 of 1

D Previous audit exam Facility and date of exam NEW QUESTION An attachment to the examigatr1rvMH-s~equired to answer this question.

YES Attachment required is:

Review and Validation Comments TRG - no comments OPS - change LOD to 3 from 2 Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only (

X 10CFR55.41.13 10CFR55.43 Memoty/Fundamental oeh ensionAnai Proposed Question (Rfor to Attchmznt 2)

While operating at 100% RTP the following occur:

  • A release occurs on the Refuel Floor 818' elevation
  • Refuel floorWall Exhaust Radiation monitor (RISHH-D12-1K609A) trips
  • Refuel floor Wall Exhaust Radiation monitor (RISHH-D12-1K609B) does not trip Which one of the following identifies the response of the Standby Gas Treatment system and the EOP entry requirement (if any) to these conditions?
a. One train of SGTS starts, EOP entry is required.
b. Both trains of SGTS start, EOP entry is required.
c. One train of SGTS starts, EOP entry is not required.
d. Both trains of SGTS start, EOP entry is not required.

Page 1 of 1

Proposed Answer Reference(s) AR-101-001

a. correct - SGTS response is divisionalized TM-OP-070-ST with a monitor starting A train, EO-1 00-1 04 entry is met with Zone IlIl HVAC Exhaust Rad above HI-HI alarm Discuss Distracters
b. incorrect - only one train starts off a monitor
c. incorrect - EOP entry is required on Hi-Hi Rad
d. incorrect - EOP entry is required on Hi-Hi Rad RO SRO 2 Tier # 2 Tier #

1 Group # I Group #

261000 K/A 261000 K/A A2.13 A2.13 3.4 I-rating 3.7 I-rating K&A Statement Ability to (a) predict the impacts of the following on the STANDBY GAS TREATMENT SYSTEM and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: High secondary containment ventilation exhaust radiation SSES Cross-Reference Learning Objective(s) # 1954b I I _

BANK QUESTION (attach question)

E SSES exam bank Question #

LI INPO exam bank Question #

LI Other facility exam bank Facility LI Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam DIFIED BANK QUESTION (attach questio X SSES exam bank Question # AD045 /1357/ 17 LI INPO exam bank Question #

LI Other facility exam bank Facility LI Previous NRC exam Facility and date of exam Page 1 of 1

F2 Previous audit exam Facility and date of exam NEW QUESTION An attachment to the examinierrwitihb required to answer this question.

YES ( N Attachment required is:

Review and Validation Comments TRG - no comments OPS - reworded stem into conditions with one monitor trip and not the other and removed leading wording "valid" Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only ( 3) 2 LOD X 10CFR55.41.7 10CFR55.43 QE y/Fundament Comprehension/Analysis Proposed Question (Refer to Attachment 2)

Which one of the following identifies the HPCI system response if the Ramp Generator fails to initiate when a Low RPV Level initiation signal is received?

a. Turbine speed remains at 0 RPM.
b. Turbine speed rises and begins to oscillate.
c. Turbine speed rises and stops at 700 RPM.
d. Turbine speed rises to the turbine trip setpoint.

Page 1 of 1

Proposed Answer Reference(s) TM-OP-052-ST

a. correct - ramp generator is required to start turbine Discuss Distracters
b. incorrect - this would indicate a control problem during HPCI ops (typically operating

<2200 RPM)

c. incorrect - this is indicative of an inverter failure during HPCI ops
d. incorrect - this would occur without ramp function and thus the reason for the interlock for startup RO SRO 2 Tier # 2 Tier #

1 Group # 1 Group #

206000 K/A 206000 K/A A3.01 A3.01 3.6 I-rating 3.5 I-rating K&A Statement Ability to monitor automatic operations of the HIGH PRESSURE COOLANT INJECTION SYSTEM including: Turbine speed SSES Cross-Reference Learning Objective(s) # 10368c , 2038h - ,_I BANK QUESTION (attach question)

LI SSES exam bank Question #

Li INPO exam bank Question #

Li Other facility exam bank Facility Li Previous NRC exam Facility and date of exam C] Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question X SSES exam bank Question # TM-OF'-052/2034/ 1 Li INPO exam bank Question #

Li Other facility exam bank Facility Li Previous NRC exam Facility and date of exam Page 1 of 1

D Previous audit exam Facility and date of exam NEW QUESTION An attachment to the examin uired to answer this question.

YES N Attachment required is:

Review and Validation Comments TRG - no comments OPS - no comments Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only ( 3 2 LOD X 10CFR55.41.4 10CFR55.43 Memory/Fundamental <ehenA Sis Proposed Question (Refer to Attachment 2)

Residual Heat Removal pump 1A is running in Suppression Pool Cooling with RHR Service Water pump 1A in service.

Which one of the following describes the effect on the RHRSW system if the Loop 1A RHR Manual Initiation pushbutton is armed and depressed?

The running RHRSW pump will....

a. continue to run because the RHRSW LOCA-TRIP is defeated.
b. trip and can be restarted by defeating the RHRSW LOCA-TRIP.
c. trip and can not be restarted with a manual LPCI initiation signal present.
d. continue to run because the manual LPCI initiation signal does not affect the pump circuit.

Page 1 of 1

Proposed Answer Reference(s) OP-016-001

d. correct - Man initiation PB does not effect TM-OP-01 6-ST RHRSW logic Discuss Distracters
a. incorrect - Logic is not defeated
c. incorrect- Pump will not trip
b. incorrect - Pump will not trip RO SRO 2 Tier # 2 Tier #

1 Group # 1 Group #

203000 K/A 203000 K/A A1.09 A1.09 2.9 I-rating 2.9 I-rating K&A Statement Ability to predict and/or monitor changes in parameters associated with operating the RHR/LPCI INJECTION MODE controls including: Component cooling water system SSES Cross-Reference Learning Objective(s) # 2053b , II BANK QUESTION (attach question)

FL SSES exam bank Question #

FI INPO exam bank Question #

Fi Other facility exam bank Facility

[El Previous NRC exam Facility and date of exam El Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

El SSES exam bank Question #

El INPO exam bank Question #

El Other facility exam bank Facility El Previous NRC exam Facility and date of exam C] Previous audit exam Facility and date of exam NEW QTI TON Page 1 of 1

CNWQESTIONS An attachment to the exami quired to answer this question.

YES (

Attachment required is:

Review and Validation Comments TRG - identified incorrect answer selected choice c is correct OPS - reworded and rearranged choices to balance old answer c is now d Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only 3h 10CFR55.41.8 10CFR55.43 Mey/Fundamenta ) Comprehension/Analysis _

Proposed Question i Which one of the following identifies the design feature of the Residual Heat Removal System to prevent piping damage due to water hammer in the pump discharge line when aligning the system to the Suppression Pool Spray mode?

a. Spray flow is throttled for first 30 seconds.
b. The pump suction is normally aligned to the suppression pool.
c. Interlocks prevent opening the SP spray valve when a LOCA signal is present.
d. Condensate transfer is normally aligned between the inboard and outboard LPCI injection valves.

Page 1 of 1

Proposed Answer Reference(s) TM-OP-049-ST

d. correct - keepfihl functions to prevent water hammer and is normally aligned to dischrge pipe Discuss Distracters
a. incorrect - this is done for DW spray for initiation limit
b. incorrect - would only flood to SP elevation and actually floods to close pump discharge check valve
c. incorrect - prevents realigning from ECCS mode without operator action S17 LOCA override switch RO SRO 2 Tier # 2 Tier #

2 Group # 2 Group #

230000 K/A 230000 K/A K4.07 K4.07 3.1 I-rating 3.2 I-rating K&A Statement Knowledge of RHRILPCI: TORUS/SUPPRESSION POOL SPRAY MODE design feature(s) and or interlock(s) which provide for the following: Prevention of water hammer SSES Cross-Reference Learning Objective(s) # 181o , ,

BANK QUESTION (attach question)

LI SSES exam bank Question #

LI INPO exam bank Question #

LI Other facility exam bank Facility LI Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

LI SSES exam bank Question #

LI INPO exam bank Question #

El Other facility exam bank Facility Page 1 of 1

D Previous NRC exam Facility and date of exam D Previous audit exam Facility and date of exam CNWQESTION)

An attachment to the exam ieeuired to answer this question.

YES NO Attachment required is:

Review and Validation Comments TRG - no comments OPS - changed a choice to be more plausible and different from choice c Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment I (Form ES401-6 comparable)

RO only SRO only h 2 LOD X 10CFR55.41.4

~--_ 10CFR55.43 Memory/Fundamental < e somp nAnia~sis Proposed Question (Refer to Attachment 2)

A loss of the preferred power supply for 30 minutes, has resulted in the Instrument AC UPS 1 D1 30 automatically transferring to maintain power to its distribution panels.

Which one of the following describes the UPS operation for re-supplying the UPS loads from the preferred power source?

a. Automatically transfers back from the battery supply on restoration of preferred power.
b. Must be manually transferred back from the battery supply when preferred power is restored.
c. Automatically transfers back to preferred from the alternate supply on restoration of preferred power.
d. Must be manually transferred back from the alternate supply when preferred power is restored.

Page 1 of 1

Proposed Answer Reference(s) TM-OP-017-ST

d. correct -battery would discharge and transfer to Alternate and require manual transfer back Discuss Distracters
a. incorrect - AUTO transfers if battery remained energized (short duration loss of AC) ---
b. incorrect - if on battery it will auto transfer back
c. incorrect - requires manual transfer from alt RO SRO 2 Tier # 2 Tier #

2 Group # 2 Group #

262002 K/A 262002 K/A A4.01 A4.01 2.8 I-rating 3.1 I-rating K&A Statement Ability to manually operate and/or monitor in the control room:

Transfer from alternate source to preferred source SSES Cross-Reference Learning Objective(s) # 10175a I, BANK QUESTION (attach question)

D- SSES exam bank INPO exam bank Question #

Question #

D~Other facility exam bank Facility FIi Previous NRC exam Facility and date of exam LI1Previous audit exam Facility and date of exam ODIFIED BANK QUESTION (attach question X SSES exam bank Question # TM-OP-017/10564/ 1 LI INPO exam bank Question #

LI Other facility exam bank Facility -

LI Previous NRC exam Facility and date of exam El Previous audit exam Facility and date of exam NEW QUESTION Page 1 of 1

An attachment to the examination will be required to answer this question.

YES X NO Attachment required is:

Review and Validation Comments TRG - added time of 5 minutes for preferred power loss OPS - changed conditions to extended loss to put alternate source in service Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment I (Form ES-401-6 comparable)

RO only SRO only ( h 2 LOD X 10CFR55.41.6 10CFR55.43 Memory/Fundamental <ehensi o lysis Proposed Question (Refer to Attachment 2)

Unit 1 is at 5% RTP during a reactor startup. During control rod withdrawal the Rod Sequence Control System DIRECTION pushbutton is depressed to illuminate the INSERT portion of the display indicating lamp. When depressed again the indication fails to toggle back to WITHDRAW.

Which one of the following identifies the effect this failure of the DIRECTION pushbutton function will have on the RSCS control rod block functions?

RSCS will......

a. immediately apply an insert block only.
b. immediately apply an insert and withdrawal block.
c. continue to enforce programmed control rod insert blocks only.
d. continue to enforce programmed control rod insert and withdrawal blocks.

Page 1 of 1

Proposed Answer Reference(s) TM-OP-056Z-ST

d. correct - controls display, and recognizes direction of control rods.

Discuss Distracters

a. incorrect - this will occur with a rod reaching the insert programmed limit
b. incorrect - this would occur on a fault ie failed RPIS
c. incorrect - both insert and w/d blocks remain in force RO SRO 2 Tier # 2 Tier #

2 Group # 2 Group #

201004 K/A 201004 K/A K6.02 K6.02 3.1 I-rating 3.2 I-rating K&A Statement Knowledge of the effect that a loss or malfunction of the following will have on the RSCS: rod direction information SSES Cross-Reference Learning Objective(s) # 2441 b , I BANK QUESTION (attach question)

L SSES exam bank Question #

LI INPO exam bank Question #

Li Other facility exam bank Facility El Previous NRC exam Facility and date of exam L Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

L SSES exam bank Question #

LI INPO exam bank Question #

L] Other facility exam bank Facility LI Previous NRC exam Facility and date of exam M Previous audit exam Facility and date of exam Page 1 of 1

An attachment to the examination will be required to answer this question.

YES X NO Attachment required is:

Review and Validation Comments TRG -

OPS - No comments Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only C69 B'oth (2 LO>}

X 10CFR55.41.4 10CFR55.43 Memory/Fundamental oehension/Analysis Proposed Question efei tu Aizl-ite

.int 2)

Which one of the following describes the effect that a trip of the operating Unit 1, Reactor Building HVAC Zone 1 Supply fan (1V202A) will have on Unit 1 Reactor Building Zone 1 ventilation?

a. Standby Supply fan auto starts maintaining normal ventilation lineup.
b. All Zone 1 Isolation dampers close shifting ventilation lineup to SBGT.
c. Operating Zone 1 Exhaust fan damper modulates maintaining normal ventilation lineup.
d. Both Equipment Compartment Exhaust fans trip shifting ventilation lineup to SBGT.

Page 1 of 1

Proposed Answer Reference(s) TM-OP-034-ST

a. correct - fan normally in AUTO starts on low flow Discuss Distracters
b. incorrect - this would occur if stdby fan failed to start
c. incorrect - fan damper does not modulate
d. incorrect - this is portion of isolation response to LOCA/Hi Rad RO SRO 2 Tier # 2 Tier #

2 Group # 1 Group #

290001 K/A 290001 K/A K6.01 K6.01 3.5 I-rating 3.6 I-rating K&A Statement Knowledge of the effect that a loss or malfunction of the following will have on the SECONDARY CONTAINMENT: Reactor building ventilation SSES Cross-Reference Learning Objective(s) # 1279a , I BANK QUESTION (attach question) al SSES exam bank Question #

El INPO exam bank Question #

al Other facility exam bank Facility I Previous NRC exam Facility and date of exam E1 Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

El SSES exam bank Question #

El INPO exam bank Question #

El Other facility exam bank Facility El Previous NRC exam Facility and date of exam El Previous audit exam Facility and date of exam NEQESTION)

Page 1 of 1

An attachment to the examip ii quired to answer this question.

YES NO Attachment required is:

Review and Validation Comments TRGZ OPS - removed word "trips" from choice c and reworded to damper modulates to maintain normal lineup Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only G7 oh (2 "O'L OD X 10CFR55.41.7 1 OCFR55.43 y/Fundamental Comprehension/Analysis Proposed Question (fer t-' Attachmont2)

HPCI is operating in CST to CST lineup on Unit 1 for pump vibration data collection.

Which one of the following identifies the HPCI system response if the Manual HPCI System Isolation pushbutton on 1C601 is depressed?

HPCI will.....

a. trip and isolate.
b. trip but not isolate.
c. continue to operate in CST to CST lineup.
d. continue to operate on minimum flow with CST return closed.

Page 1 of 1

Proposed Answer Reference(s) TM-OP-052-ST

c. correct - PB only works with initiation signal in Discuss Distracters
a. incorrect - this would occur if initiation signal was present
b. incorrect - Isolation causes a trip but PB would not work without initiation signal
d. incorrect - CST return closes on isolation signal RO SRO 1 Tier # 1 Tier #

2 Group # 2 Group #

295020 K/A 295020 K/A AK2.06 AK2.06 3.8 I-rating 3.8 I-rating K&A Statement Knowledge of the interrelations between INADVERTENT CONTAINMENT ISOLATION and the following: HPCI SSES Cross-Reference Learning Objective(s) # 2037m , , _I BANK QUESTION (attach question)

FI SSES exam bank Question #

F INPO exam bank Question #

EJ Other facility exam bank Facility El Previous NRC exam Facility and date of exam F Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

LI SSES exam bank INPO exam bank Question #

Question #

L]

LI Other facility exam bank Facility LI Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam Page 1 of 1

GKNQEW I6ESTIO An attachment to the examirequired to answer this question.

YES Attachment required is:

Review and Validation Comments TRG -

OPS - no comments Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only h) 2 LOD X 10CFR55.41.3 10CFR55.43 Memory/Fundamental ehension/Anal;s Proposed Question (Refer to Attachment 2)

Unit 1 is in Mode 4 when an inadvertent isolation of the Reactor Water Cleanup System occurs. Which one of the following identifies the ability to determine bottom head stratification using the RWCU bottom head drain temperature indication?

Bottom head drain temperature indication.......

a. can be used but will indicate higher than actual RPV coolant temperature.
b. can be used but will indicate lower than actual RPV coolant temperature.
c. cannot be used because it indicates higher than actual RPV coolant temperature.
d. cannot be used because it indicates lower than actual RPV coolant temperature.

Page 1 of 1

Proposed Answer Reference(s) ON-1 00-101

b. correct - bottom head drain indicated AD045 temperature will be conservatively low when RWCU is not in service Discuss Distracters
a. incorrect - this condition is reversed from actual effect
c. incorrect- ON-100-101 allows use based on conservative indication
d. incorrect - ON-1 0O-101 allows use based on conservative indication RO SRO 1 Tier # 1 Tier #

2 Group # 2 Group #

295020 K/A 295020 K/A AK1.04 AK1.04 2.5 I-rating 2.8 I-rating K&A Statement Knowledge of the operational applications of the following concepts as they apply to the INADVERTENT CONTAINMENT ISOLATION: Bottom head thermal stratification SSES Cross-Reference Learning Objective(s) # 1360 , _ _ ,

BANK QUESTION (attach question)

LI SSES exam bank Question #

O INPO exam bank Question #

Li Other facility exam bank Facility L Previous NRC exam Facility and date of exam a Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

LI SSES exam bank Question #

LI INPO exam bank Question #

LI Other facility exam bank Facility L Previous NRC exam Facility and date of exam El Previous audit exam Facility and date of exam Page 1 of I

EWQESTION3 An attachment to the examination will be required to answer this question.

YES X NO Attachment required is:

Review and Validation Comments TRG -

OPS - No comments Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only 3 LOD X 10CFR55.41.10 10CFR55.43 Memory/Fundamental oehensionAnalyi Proposed Question (Refer to Attachment 2)

Which one of the following identifies a concern of lowering Suppression Chamber pressure below 0 psig during RHR Suppression Chamber Spray operation with containment hydrogen concentration at 4% and rising with Suppression Chamber venting in progress?

a. Suppression Chamber-to-Drywell vacuum breakers could fail open prior to design.
b. Inboard containment vent valves could fail securing the vent line up.
c. Reverse flow through the vent path could deinert the containment.
d. RHR spray flow path could result in an uncontrolled release to the Reactor Building.

Page 1 of 1

Proposed Answer Reference(s)

c. correct - lower internal pressure will result EO-100-103 in reverse flow and intake of air into the PC PP002 Discuss Distracters
a. incomrect - vac bkrs open to relieve SP to DW on high SP pressure
b. incorrect - AOV may fail to open if DP or PC pressure is too high
d. incorrect - with high PC pressure or loss of spray flow a flow path could exist RO SRO 1 Tier # 1 Tier #

1 Group # 1 Group #

500000 K/A 500000 K/A EK2.06 EK2.06 3.0 I-rating 3.4 I-rating K&A Statement Knowledge of the interrelations between HIGH CONTAINMENT HYDROGEN CONCENTRATION and the following: Wetwell spray system SSES Cross-Reference Learning Objective(s) # 2641 , _ _ II BANK QUESTION (attach question)

LI SSES exam bank Question #

Li INPO exam bank Question #

LI Other facility exam bank Facility LI Previous NRC exam Facility and date of exam Ei Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

L SSES exam bank Question #

LI INPO exam bank Question #

El Other facility exam bank Facility LI Previous NRC exam Facility and date of exam L Previous audit exam Facility and date of exam Page 1 of 1

(NE QUSTON An attachment to the examination will be required to answer this question.

YES X NO Attachment required is:

Review and Validation Comments TRG - no comments OPS - concern on testability of EP-DS bases, revised to related to when spray is used for Hydrogen control NRC - Modified to ask hydrogen related bases for not spraying below 0 psig.

Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET

- Attachment 1 (Fornm ES-401-6 comparable)

RO only SRO only 73 Bot) C2 LOD)

X 10CFR55.41.8 .

10CFR55.43 Me/Fundamenta Comprehension/Analysis Proposed Question (efeLt Afteehwmota)

Which one of the following identifies the reason that the "A-D" Emergency Diesel Generator Intercooler TCVs supplied from ESW are normally full open with the controller in OFF?

a. ensures minimum flow for ESW pumps during an auto start of all 4 EDGs.
b. ensures minimum flow for FSW ni immS rh iring mnniml afStat mrif z MrnuF f-testing.s r s f i heat r by E _W d n a auto star o al4 s.

ensures sufficient heat removal- by ESW during an auto start of all 4 EDGs.

d. ensures sufficient heat removal by ESW during manual start of any EDG for testing.

Page 1 of 1

Proposed Answer Reference(s) TM-OP-024-ST

a. correct - prevent dead heading either ESW loop on DG auto start when 4 ESW pumps start Discuss Distracters
b. incorrect - when manually starting for testing the TCV is placed in AUTO for that DG
c. incorrect - sufficient heat removal exists with TCV throttling and excess cooling occurs with valve full open but has been evaluated as acceptable
d. incorrect - sufficient heat removal exists with TCV throttling and excess cooling occurs with valve full open but has been evaluated as acceptable RO SRO 1 Tier # 1 Tier #

2 Group # 2 Group #

295018 K/A 295018 KIA AK3.06 AK3.06 3.3 I-rating 3.3 I-rating K&A Statement Knowledge of the reasons for the following responses as they apply to PARTIAL OR COMPLETE LOSS OF CCW: Increasing cooling water flow to heat exchangers SSES Cross-Reference Learning Objective(s) # 2072d ____ ____ __ __ __

BANK QUESTION (attach question)

M SSES exam bank Question #

Z INPO exam bank Question #

D Other facility exam bank Facility El Previous NRC exam Facility and date of exam E] Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

LI SSES exam bank Question #

Question Page 1 of 1

D INPO exam bank Question #

D Other facility exam bank Facility D Previous NRC exam Facility and date of exam D Previous audit exam Facility and date of exam An attachment to the exami a -Iri~ nrequired to answer this question.

- YES Attachment required is:

Review and Validation Comments TRG -

OPS - no comments Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only h 3 LOD X 10CFR55.41.10 10CFR55.43 Mem/Fuln dmental Comprehension/Analysis Proposed Question (Refer to Attachment 2)

Unit 1 is at 100% RTP when a sustained loss of steam seal header pressure occurs.

Which actions are required if steam seal pressure cannot be re-established?

a. Scram reactor, close the MSIVs and isolate Offgas system.
b. Scram reactor, close the MSIVs and open the condenser vacuum breakers.
c. Reduce power as necessary to maintain backpressure < 5.5 "HgA.
d. Reduce power as necessary to maintain vacuum above th-e turbine trip setpoint.

Page 1 of 1

Proposed Answer Reference(s) ON-143-001

b. correct- per ON-143-001 step 3.3.9 due to TM-OP-092-ST seal cutting damage AD045 Discuss Distracters
a. incorrect - Offgas isolation is condition that could cause loss of vac
c. incorrect - Loss of vacuum actions per ON if scram not directed
d. incorrect - not directed as a target during loss of vacuum RO SRO 2 Tier # 2 Tier #

2 Group # 2 Group #

245000 K/A 245000 K/A K6.01 K6.01 2.8 I-rating 2.9 I-rating K&A Statement Knowledge of the effect that a loss or malfunction of the following will have on the MAIN TURBINE GENERATOR AND AUXILIARIES: Gland seal SSES Cross-Reference Learning Objective(s) # 1358 ,I BANK QUESTION (attach question)

FI SSES exam bank Question #

FI INPO exam bank Question #

LI Other facility exam bank Facility LI Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

L SSES exam bank Question #

LI INPO exam bank Question #

LI Other facility exam bank Facility LI Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam Page 1 of 1

t^NWQESTION An attachment to the examination will be required to answer this question.

YES X NO Attachment required is:

Review and Validation Comments TRG -

OPS - modified stem to identify a sustained loss and removed admission valve rersponse Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SRO only X 10CFR55.41.9 10CFR55.43 Memnyl/Fundamental oehensioW Analys Proposed Question (fleer te-MAttaehrzt 2)_

Unit 1 is operating at 100% RTP when a steam line rupture occurs in the Reactor Building main steam pipe tunnel.

Which one of the following identifies the radioactive release vent path(s) that would exist if the area blowout panel(s) opened during the event as designed?

Operation of the area blowout panels would cause a release to the ......

a. site environment only.
b. Turbine Building only.
c. Reactor Building and site environment.
d. Turbine Building and the site environment.

Page 1 of 1

Proposed Answer Reference(s) TM-OP-034-ST

d. correct - one panel goes to TB the other to the environment Discuss Distracters
a. incorrect - this would be for below grade rooms (RHR/RCIC/HPCI)
b. incorrect - this would be path for TB main steam tunnel without panel actuation
c. incorrect - panels blow out to environment except RB tunnel RO SRO 2 Tier # 2 Tier #

2 Group # 1 Group #

290001 K/A 290001 K/A K1.07 K1.07 3.0 I-rating 3.1 I-rating K&A Statement Knowledge of the physical connections and/or cause-effect relationships between SECONDARY CONTAINMENT and the following: Turbine building ventilation (steam tunnel)

SSES Cross-Reference Learning Objective(s) # 1274o II I BANK QUESTION (attach question)

LI SSES exam bank Question #

FI INPO exam bank Question #

FI Other facility exam bank Facility LI Previous NRC exam Facility and date of exam rI Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

LI SSES exam bank Question #

LI INPO exam bank Question #

LI Other facility exam bank Facility LI Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam Page 1 of 1

KNESTIUES An attachment to the exami naile required to answer this question.

YES ( I Attachment required is:

Review and Validation Comments TRG -

OPS - underlined vent and blowout panels to remove confusion regarding leakage through other paths Page 1 of 1

ON 0-pt.

'al WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only onIy Both 2 LOD 10CFR55.4 X 10CFR55.43.5 Memory/Fundamental rehension/AnaIysis Proposed Question (Refer to Attachment 2)

While operating at 80% RTP a feedwater control malfunction causes RPV level to drop to below the scram setpoint. The following conditions exist 2 minutes after scram initiation:

  • RPV level is 20 inches and slowly rising
  • RPV pressure is 960 psig and stable Given those conditions, which one of the following procedures is required to be implemented in order to control RPV parameters?
a. ON-100-101, "Scram".
b. EO-100-102, "RPV Control".
c. EO-1 00-113, "Level/Power Control".
d. GO-100-005, "Plant Shutdown to Cold Shutdown".

Page 1 of 1

_ No. -

~T,. mW4V.

Proposed Answer Reference(s)

c. correct - Low Ivi entry with > one rod not at PPOO2 00 Discuss Distracters
a. incorrect - scram with no EO entry condition
b. incorrect - low IvI with < one rod not at 00
d. incorrect - when directed from ON-100-101 RO SRO Tier # 3 Tier #

Group # Group #

K/A 2.4.1 K/A I-rating 4.6 I-rating K&A Statement Knowledge of EOP entry conditions and immediate action steps.

SSES Cross-Referei ice Learning Objective(s 2622 , ,

BANK QUESTION (<attach question)

D SSES exam ban] k Question #

EI INPO exam bank Question #

E Other facility exa m bank Facility LI Previous NRC e)(am Facility and date of exam n Previous audit e)(am Facility and date of exam MODIFIED BANK QUESTION (attach question)

F SSES exam bank Question #

F INPO exam bank Question #

C Other facility exam bank Facility F Previous NRC exam Facility and date of exam EL Previous audit exam Facility and date of exam X WUESTION ,

An attachment to the examination will be required to answer this question.

YES X NO Attachment required is:

Page 1 of 1

AAle

- agi Review and Validation Comments TRG - Changed wording in stem to "the following conditions exist after scram' OPS - removed word 'entry and" from stem Pagel of I

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only (nly Both 2 LOD 10CFR55.41 X 10CFR55.43.4 Memory/Fundamental Ceension/Ajsis Proposed Question (Refer to Attachment 2)

Which one of the following Reactor Building area radiation conditions would require a Rapid Depressurization during an event on Unit 2 involving extensive fuel failure and a HPCI piping rupture discharging into the Reactor Building per EO-100-104, 'Secondary Containment Control"?

a. HPCI Room I IR/hr, RCIC Room 11 R/hr, CRD North 9R/hr, CRD South 9R/hr.
b. HPCI Room 11R/hr, RCIC Room 9R/hr, CRD North 11R/hr, CRD South 1OR/hr.
c. HPCI Room 9R/hr, RCIC Room 9R/hr, CRD North 11 R/hr, CRD South 1 1R/hr.
d. HPCI Room 9R/hr, RCIC Room 8R/hr, CRD North 9R/hr, CRD South 9R/hr.

Page 1 of 1

Proposed Answer Reference(s)

b. correct - MAX SAFE is RD criteria if two or EO-000-1 04 more areas PPOO2 Discuss Distracters
a. incorrect - HPCI and RCIC are one area per EO
c. incorrect - CRD North and south are one area per EO
d. incorrect - no area above MAX SAFE RO SRO Tier # 1 Tier #

Group #. 2 Group #

K/A 295033 K/A EA2.02 I-rating 3.2 I-rating K&A Statement Ability to determine and interpret the following as they apply to HIGH SECONDARY CONTAINMENT AREA RADIATION LEVELS: Equipment operability SSES Cross-Reference Learning Objective(s) # 2598 __ _ _ _ I _ I__ _ __ _ _

BANK QUESTION (attach question)

C] SSES exam bank Question #

El INPO exam bank Question #

L Other facility exam bank Facility L Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

LI SSES exam bank Question # .

LI INPO exam bank Question #

LI Other facility exam bank Facility El Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam NEWT QU IN)

Page 1 of 1

.,r

? - -- I An attachment to the examination will be required to answer this question.

X YES NO Attachment required is:

Unit 2 EO-100-104 flow chart Review and Validation Comments TRG -

OPS - modified to focus on interpret_

.¢:

Modified question per discussion with OPS to utilize Unit 2 flowchiart to apply rad criteria which is based on equipment operability and personnel rad exposure Page 1 of i

E -'$S:t.C- ',V 4h N 7 WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SR Both 2 LOD 10CFR55.41 5.4t43.1 PX Memd auentamfol Comprehension/Analysis Proposed Question (Refer to Attachment 2)

Which one of the following identifies the plant effect and procedure that should be directed for a downscale failure of the "An narrow range RPV level instrument on Unit I as compared to the same failure on Unit 2 while operating at 100% RTP with FWLC in a normal lineup?

UNIT 1 UNIT 2

a. ON-100-101 due to low level scram GO-200-002 unit remains at 100%

power

b. GO-1 00-002 unit remains at 100% power ON-200-101 due to low level scram
c. ON-164-002 due to runback of Recirc GO-200-002 unit remains at 100%

power

d. GO-100-002 unit remains at 100% power ON-264-002 due to runback of Recirc

.. t,'.

, -1..

Page 1 of 1 -.1;

t' 1/2.

Proposed Answer Referece(s) 7

d. correct - on unit 1 averaged le vel will drop slightly but remain above L3, unit 2 will receive L3 runback from selected NR Discuss Distracters
a. incorrect - average input will drop slightly
b. incorrect - NR input to RPS is one out of two twice and FWLC will cause level to go high not low
c. incorrect - average input will drop slightly RO SRO Tier # 3 Tier #

Group # Group #

K/A 2.2.3 K/A I-rating 3.3 I-rating K&A Statement (multi-unit) Knowledge of the design/procedural/ and operational differences between units SSES Cross-Reference Learning Objective(s) #

BANK QUESTION (attach question)

LI SSES exam bank Question #

L INPO exam bank Question #

L Other facility exam bank Facility L Previous NRC exam Facility and date of exam C: Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

Li SSES exam bank Question #

Li INPO exam bank Question #

Li Other facility exam bank Facility Li Previous NRC exam Facility and date of exam EL Previous audit exam Facility and date of exam X§U3USTION )

An attachment to the examination will be required to answer this question.

YES X NO Page 1 of 1

Attachment required is:

Review and Validation Comments TRG-  : I OPS - No comments Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only . ) Both 10CFR55.41 X 10CFR55.43.1 (X Memory/Fundamena Comprehension/Analysis Proposed Question (Refei lo Attai heIIMMitt 2r Unit 1 is at 30% power. It has been determined that multiple ECCS equipment malfunctions have resulted in NON-COMPLIANCE with the LCO statements that are applicable in Modes 1, 2 and 3. There are NO action statements (conditions) associated with the current combinations of inoperable equipment.

Per Technical Specifications, which one of the following actions is required?

a. Within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> initiate actions to place the plant in Cold Shutdown.
b. Within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> initiate actions to place the mode switch in Startup.
c. Immediately verify operability of redundant ECCS equipment and obtain a Technical Specification interpretation with 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
d. Within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> verify operability of redundant ECCS equipment and continue operation until a valid Technical Specification LCO exists.

Page 1 of 1

Proposed Answer Reference(s) TS 3.0.3/Bases

a. correct - When there are No applicable -

OP-AD-001 LCOs and the existing LCOs are NOT met -

AD044A action must be taken within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to place the plant in a non-applicable mode, which in this case is mode 4, Cold Shutdown.

Discuss Distracters

b. incorrect - Only one hour is allowed to initiate action and the mode switch must be in Startup within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />
c. incorrect - Operation may not continue without the plant meeting existing LCOs.
d. incorrect - Operation may not continue without the plant meeting existing LCOs RO SRO Tier # 3 Tier #

Group # Group #

K/A 2.1.11 K/A -/

I-rating 3.8 I-rating K&A Statement Knowledge of less than one hour technical specification action statements for systems SSES Cross-Reference I"Learning Objective(s) # 4056b _ I I BANK QUESTION (attach question X-:itsexa ran - Question # AD044 B/4493/ 1 D INPO exam bank Question #

FII Other facility exam bank Facility X Previous NRC exam Facility and date of exam SSES 2001

[: Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

LI SSES exam bank Question #

LI INPO exam bank Question #

LI Other facility exam bank Facility L Previous NRC exam Facility and date of exam L Previous audit exam Facility and date of exam LI NEW QUESTION Page 1 of 1

An attachment to the examrir5-wiUerequired to answer this question.

YES NO Attachment required is:

Review and Validation Comments Modified wording in choice c and d to "redundant" ECCS Changed LOD from 3 to 2 Page 1 of 1

AUG-06-2002 TUE 12:10 PH FAX NO. P. 10 WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only on Bolts 10CFR55.41 x 10CFR55.43.5 Memory/Fundamental rehjnsioAnalYsis Proposed Question Unit 1 was at 100% RTP and Unit 2 was in Shutdown Cooling with 2B RHR pump at 195°F coolant temperature.

An evacuation of the control room was ordered due to dense smoke. All control room actions were completed prior to evacuation.

Control was established at the Remote Shutdown panels 13 minutes after the evacuation.

The following events occurred during the evacuation:

  • Unit I suppression pool temperature is 129 0F and rising due to HPCI auto initiation on low-low level and SRV operation.
  • Unit 2 coolant temperature has risen to 21 9°F and rising following RHR pump shutdown.

Which one of the following identifies the highest applicable E-plan classification that is required due to these station conditions? EP-PS-1 00 is provided for your use.

a. Unusual Event.
b. Alert.
c. Site Area Emergency.
d. General Emergency.

Page 1 of 1 AUG-06-2002 12:30 P. 10

FX NO. P. 11 AUG-06-2002 12:11 PH TUE 12:11 fiUG-06-2002 TUE PM FAX NO. P. I1I Proposed Answer Reference(s) EP-PS-100 Tab 4

c. correct - SAE per EP-PS-100 TAB 4 EAL 10.3 for Unit 1 Discuss Distracters
a. incorrect - EAL 12.1 is for initiation of Low-low-low ECCS not HPCI on unit 1
b. incorrect - EAL 2.2 for both units. EAL 10.2 for unit 2
d. incorrect- EAL 10.4 if unit I pool temp rose to 290F RO SRO Tier # 1 Tier #

Group # 1 Group #

K/A 295016 K/A 2.1.14 I-rating 3.3 I-rating K&A Statement Knowledge of system status criteria which requires the notification of plant personnel.

SSES Cross-Referer ice Learning Objective(s ) # 5 (EP012) II ,_

I__ __I BANK QUESTION (a attach question)

SSES exam bani Question #

El INPO exam bank Question # .

rl Other facility exai mnbank Facility M Previous NRC ex am Facility and date of exam M Previous audit ex am Facility and date of exam MODIFIED BANK QUESTION (attach question)

El SSES exam bank Question #

El INPO exam bank Question #

El Other facility exam bank Facility E Previous NRC exam Facility and date of exam E Previous audit exam Facility and date of exam ment to the examination will be required to answer this question.

NO Page 1 of 1 AUG-06-2002 12:31 96% P . 11

AUG-06-2002 TUE 12:11 PM FAX NO. P. 12 Attachment required is:

EP-PS-100 TAB 4 Review and Validation Comments TRG - Clarified supplied doc to candidate OPS - No comments NRC - Added other unit conditions to original question to allow evaluation of other three classifications due to plant parameters Page 1 of 1 AUG-06-2002 12:31 96% P.12

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only <nl Both 10OCFR55.41 X 10CFR55.43.4 Me da mental ComprehensionlAnalysis Proposed Question (R/fe1 tlAttd Tlfen t.

An emergency condition exists on site involving both units.

been entered and the Shift Supervisor (SS) has assumed The Emergency Plan has the role of Emergency Director. It is determined that normal station exposure limits will be exceeded to perform a search and rescue operation in the Reactor Building for a disabled worker.

Which one of the following meets the required amproval(s) receive an estimated 12,000 mrem to perform this evolution? to allow an individual to

a. Only the SS acting as Emergency Director.
b. The Emergency Director in the EOF and the Radiation Protection Coordinator/Recovery Manager.
c. The SS acting as Emergency Director, Radiation Protection

/Recovery Manager and Dose Assessment Supervisor. Coordinator

d. The SS acting as Emergency Director, the Emergency Director in the EOF and the Dose Assessment Supervisor.

Page 1 of 1

Proposed Answer Reference(s) EP-PS-100-6 Tab 6

c. correct - all three reqd above 4000 mrem EP Discuss Distracters
a. incorrect - this is for <4000 mrem
b. incorrect - also requires DASU
d. incorrect - also requires RM RO SRO Tier # 3 Tier #

Group # Group #

K/A 2.3.1 KIAtn I-rating 3.0 I-rating K&A Statement Knowledge of 10CFR20 and related facility radiation control requirements SSES Cross-Reference Learning Objective(s) #

BANK QUESTION (attach question)

FI SSES exam bank Question #

F INPO exam bank Question #

El Other facility exam bank Facility F Previous NRC exam Facility and date of exam F Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

LI SSES exam bank Question #

FI INPO exam bank Question #

LI Other facility exam bank Facility LI Previous NRC exam Facility and date of exam FI Previous audit exam Facility and date of exam

<'ETTON An attachment to the exam ip4f reequired to answer this question.

YES (NO Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only ~ only Both (

10CFR55.41 X 10CFR55.43.3 13udaet Comprehension/Analysis Proposed Question (rfle tu AtLac-lneIt 2)

During rounds an operator identifies a component labeling error in the plant on a Control Structure HVAC damper that could lead to misoperation of the damper. The operator hangs a Deficiency Identification Tag on the component label and generates an action request (AR).

Which one of the following individuals is responsible for assigning the priority for this AR per NDAP-QA-0502, "Work Order Process"?

a. Shift Supervision.
b. Functional Unit Manager.
c. NAS Quality Control Services.
d. Work Order Processing Foreman.

Page 1 of 1

Proposed Answer Reference(s) NDAP-QA-0502 4.5.1

a. correct - per NDAP SS is responsible to AD044A review all AR written by ops to assign the priority Discuss Distracters
b. incorrect - responsible for admin implementation and review of NDAP with work groups
c. incorrect - Work package review and tagging quality components until dispositioned
d. incorrect - representing Maint. In WCC clasifies, codes and assigns WOs RO SRO Tier # 3 Tier #

Group # Group #

K/A 2.2.19 K/A &/

I-rating 3.1 I-rating K&A Statement Knowledge of maintenance work order requirements SSES Cross-Reference I/ Learning Objective(s) # 4309 I I _

BANK QUESTION (attach question)

II SSES exam bank Question #

D INPO exam bank Question #

D Other facility exam bank Facility rD Previous NRC exam Facility and date of exam a Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

D1 SSES exam bank Question #

LI INPO exam bank Question #

DOther facility exam bank Facility E: Previous NRC exam Facility and date of exam Dj Previous audit exam Facility and date of exam C UESTION E

Page 1 of 1

An attachment to the examinationwl required to answer this question.

YES (

Attachment required is:

Review and Validation Comments TRG -

OPS -

Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only Both 10CFR55.41 X 10CFR55.43.6 Comprehension/Analysis Proposed Question (Retfl Atoehi ient 2)

EO-100-1 13, "Level/Power Control", directs throttling and preventing injection when > 5%

power to lower RPV level to -60" to -110".

Which one of the following identifies the expected power response and reason for this response when this action to lower RPV level is taken?

RPV level is lowered to.......

a. uncover the fuel to reduce natural circulation and limit the peak power level to below the fuel thermal limits.
b. uncover the feedwater spargers to reduce subcooling and limit the onset of severe power/flow instabilities.
c. isolate RWCU to prevent boron removal by the system and limit the peak power level to below the fuel thermal limits.
d. trip the operating Recirculation pumps to reduce forced circulation and limit the onset of severe power/flow instabilities.

Page 1 of 1

Proposed Answer Reference(s) EO-000-1 13

b. correct - lowering of level below -24" will EO-100-1 13 uncover FW spargers and reduce subcooling PPOO2 effect causing power to drop and reducing the probability of oscillations Discuss Distracters
a. incorrect - level is not throttled and prevented to below TAF per EO-00-1 13
c. incorrect - RWCU is isolated when SLC is injected to prevent boron removal
d. incorrect - tripping the pumps will reduce flow and may increase the probability of oscillations RO SRO Tier # 1 Tier #

Group # 1 Group #

K/A 295031 K/A .-

EA2.02 I-rating 4.2 I-rating K&A Statement Ability to determine and/or interpret the following as they apply to REACTOR LOW WATER LEVEL: Reactor power SSES Cross-Reference Learning Objective(s) # ' 2621a II I BANK QUESTION (attach question)

Eli SSES exam bank Question #

E INPO exam bank Question #

El Other facility exam bank Facility El Previous NRC exam Facility and date of exam EL Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

El SSES exam bank Question #

El INPO exam bank Question #

El Other facility exam bank Facility El Previous NRC exam Facility and date of exam E Previous audit exam Facility and date of exam Page 1 of 1

An attachment to the ekamirequired to answer this question.

YES QX N Attachment required is:

Review and Validation Comments TRG - No Comments OPS - added RPV to level statements Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only X9 SRO only Both 3 LOD 10CFR55.41 X 10CFR55.43.2 Memory/Fundamental X Comprehension/Analysis Proposed Question (Refer to Attachment 2)

The following conditions exist in the Primary Containment following an inadvertent initiation and operation of HPCI while Unit 1 was at 100% RTP:

  • Suppression Pool Average temperature indicates 91 OF
  • Suppression Pool temperature near the HPCI steam exhaust indicates 11 1OF
  • HPCI is now shutdown
  • RHR Suppression Pool Cooling is not in service Which one of the following Technical Specification 3.6.2.1 actions shduld be entered with the indicated suppression pool conditions?
a. Action A only.
b. Action C only.
c. Action D only.
d. Action A and C only.

Page 1 of 1

Proposed Answer Reference(s) TS 3.6.2.1

a. correct - TS is based on average water TM-OP-059-ST temperature, given conditions are >90 but below 110 requiring Action A Discuss Distracters
b. incorrect - for temp >105 during testing not inadvertent ops
c. incorrect - for temp >110 average not localized
d. incorrect - Action C would be entered if ave were >105 during testing and then exited when testing ended and Action A would be entered until <90 RO SRO Tier # 1 Tier #

Group # 1 Group #

K/A 295013 K/A /

AA2.02 I-rating 3.5 I-rating K&A Statement Ability to determine and/or interpret the following as they apply to HIGH SUPPRESSION POOL TEMPERATURE: localized heating/stratification SSES Cross-Reference Learning Objective(s) # / 10360k 289 ,_

BANK QUESTION (attach question)

D SSES exam bank Question #

D INPO exam bank Question #

D Other facility exam bank Facility D Previous NRC exam Facility and date of exam D Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question) rD SSES exam bank Question #

D INPO exam bank Question #

D Other facility exam bank Facility D Previous NRC exam Facility and date of exam D Previous audit exam Facility and date of exam Page 1 of 1

,A* ahment to the examination will be required to answer this question.

X ~ YES) NO Attachment required is:

TS 3.6.2.1 Review and Validation Comments No comments Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only 10CFR55.41 (E i3Oy Both in>

X 10CFR55.43.5 Memory/Fundamental X Comprehension/Analysi Proposed Question (Refer tu AAttach i l e1t-2)-

A loss of coolant accident and high drywell pressure scram has occurred on Unit 1.

The following indications are noted for the Traversing In-core Probe system:

  • Four of the five system Ball valves on 1C610 indicate closed
  • Four of the five shear valve continuity indicators on 1C610 are extinguished
  • All three purge on indicating lamps are extinguished on 1C610
  • All five in shield lights are illuminated
  • The TIP purge supply valve indication on 1C601 indicates closed Which one of the following identifies the action expected of your shift given these indications for the TIP system in accordance with OP-AD-002, "Standards for Shift Operations"?
a. Immediately close the open Ball valve then notify Shift Supervisor.
b. Immediately fire the shear valve with the lit indicator then notify Shift Supervisor.
c. Notify Shift Supervisor then close the open Ball valve after receiving permission.
d. Notify Shift Supervisor then fire the shear valve with the lit indicator after receiving permission.

Page 1 of 1

Proposed Answer Reference(s) OP-AD-002

a. correct - one ball valve has failed to isolate ON-100-101 and ensure isolations is an IA per OP-AD-002 AD044A Discuss Distracters
b. incorrect - shear valve indicators are normally extinguished, one valve has lost continuity
c. incorrect - OP-AD-002 identifies ensuring isolations as an IA and does not require SS permission
d. incorrect - shear valve indicators are normally extinguished, one valve has lost continuity, however if firing were necessary permission would be required RO SRO Tier # 2 Tier #

Group # 3 Group #

K/A 215001 K/A .,

2.4.49 I-rating 4.0 I-rating K&A Statement Ability to perform without reference to procedures those actions that require immediate operation of system components and controls SSES Cross-Reference Learning Objective(s) # 4051 , ,I_ I BANK QUESTION (attach question)

FI1 SSES exam bank Question #

E INPO exam bank Question #

El Other facility exam bank Facility El Previous NRC exam Facility and date of exam E Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

El SSES exam bank Question #

LI INPO exam bank Question #

LI Other facility exam bank Facility

[L Previous NRC exam Facility and date of exam Page 1 of 1

C] Previous audit exam Facility and date of exam An attachment to the examiali~iN required to answer this question.

YES Q NO Attachment required is:

Review and Validation Comments TRG - Added in shield indication to stem conditions OPS - Changed all choices to Shift "Supervisor" Page 1 of 1

AUG-06-2002 TUE 12:12 PM FAX NO. P. 13 WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only T11 SRO oBn Both 2 LOD 10CFR55.41 X 10CFR55.43.4 n nt Comprehension/Analysis Proposed Question (Refer to Attachment 2)

Which one of the following identifies the condition that would require SSES to restrict site access to only essential personnel per the Emergency Plan?

a. Any Alert declaration.
b. An alert declaration that requires accountability initiation.
c. Any Site Area Emergency declaration.
d. A Site Area Emergency declaration that requires Station Evacuation.

Page 1 of 1 AUG-06-2002 12:31 96% P . 13

AUG-06-2002 TUE 12:12 PM FAX NO, P. 14 Proposed Answer Reference(s) ED-PS-1 00

d. correct - site access restricted at SAE with evac directive Discuss Distracters
a. incorrect - activation of facilities is at this level
b. incorrect - this happens on all Alerts
c. incorrect - only if Station evac if directed RO SRO Tier # 3 Tier #

Group # Group #

K/A 2.1.13 K/A I-rating 2.9 I-rating K&A Statement Knowledge of facility requirements for controlling vital/controlled access SSES Cross-Reference Learning Objective(s) #

BANK QUESTION (attach question) 71 SSES exam bank Question #

C1 INPO exam bank Question #

1 Other facility exam bank Facility 13Previous NRC exam Facility and date of exam F1 Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question) 1 SSES exam bank Question #

1 INPO exam bank Question # -

1 Other facility exam bank Facility 13Previous NRC exam Facility and date of exam 1 Previous audit exam Facility and date of exam CNEW QE;O An attachment to the examination will be required to answer this question.

Page 1 of I RUG-06-2002 12: 32 96% P . 14

P. 15 FX NO.

12: 12 PPM UG-O6-2OO2 TUE 12:12 AUG-06-2002 FAX NO, P. 15 YES x NO Attachment required is:

Review and Validation Comments TRG -

OPS - developed with ops support Page 1 of I RUG-06-2002 12:32 96% P.15

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only j3onl Both (3L 10CFR55.41 X 10CFR55.43.2 t~undamental) Comprehension/Analysis Proposed Question (Refer tow Adtt-hm4e,1 2)

Which one of the following identifies the effect of operating above the Suppression Pool Water Level LCO of 24 feet per the unit Technical Specifications bases?

The Primary Containment could fail as a result of......

a. exceeding the dynamic loading on the pool walls due to the column of water.
b. excessive pool swell loads during the DBA LOCA due to excessive downcomer submergence.
c. excessive DW to pool differential pressure due to covering the suppression chamber to drywell vacuum breaker pipes.
d. exceeding the containment design pressure due to displaced nitrogen from the suppression pool air space being forced into the DW.

Page 1 of 1

Proposed Answer Reference(s) TS B 3.6.2.2

b. correct - per bases 3.6.2.2 TM-OP-059-ST Discuss Distracters
a. incorrect - SAG concern during PC flooding
c. incorrect - EOP concern with level >43'
d. incorrect - NP, bases of PSL curve and Spray Initiation limit in EOPs RO SRO Tier # 1 Tier #

Group # 2 Group #

K/A 295029 K/A v 2.2.25 I-rating 3.7 I-rating K&A Statement Knowledge of bases in technical specifications for limiting conditions for operations and safety limits SSES Cross-Reference Learning Objective(s) # / 10361 , ,

BANK QUESTION (attach question)

FI SSES exam bank Question #

Fl INPO exam bank Question #

E Other facility exam bank Facility FII Previous NRC exam Facility and date of exam FI Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

LI SSES exam bank Question #

L INPO exam bank Question #

F Other facility exam bank Facility F Previous NRC exam Facility and date of exam F Previous audit exam Facility and date of exam An attachment to the examination will be required to answer this question.

Page 1 of 1

YES :X, NO Attachment required is:

Review and Validation Comments TRG - No comments OPS - added pool air space to choice d vs. chamber Page 1 of 1

1A

~~~~~.1 1. {~LS~~-c f- f- b 2 42->?

Holm, e =

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only X13 SRO only Both 2 LOD 10CFR55.41 X 10CFR55.43.2 Memory/Fundamental X Comprehension/Analysis Proposed Question (Refer to Attachment 2)

Unit 1 is in MODE 1. I&C is performing the Quarterly Channel Calibration of ADS, to satisfy SR 3.3.5.1.3. I&C has just determined and notified you that the timer for Div I timed out at 121 seconds and Div II at 105 seconds.

Which of the following identifies the required action, if any, per TS 3.3.5.1?

a. No action is required
b. Within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> declare ADS valves inoperable I-
c. Restore Div I channel to operable status within 8 days
d. Restore Div I channel to operable status within 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> Page 1 of 1

-i

",j .

5 ( 7

.  :: ", I I -. ,, i, - ", " !04:

7 , "i - .

w A4'

- K r, Proposed Answer Reference(s) TS 3.3.5.1

c. correct - per action F.2 with HPCI and TM-OP-083E-ST RCIC OPERABLE Discuss Distracters
a. incorrect - action is required
b. incorrect - this is action F. 1
d. incorrect - this is action F.2 with HPCI or RCIC INOP RO SRO Tier # 2 Tier #

Group # 1 Group #

K/A 218000 K/A 2.1.33 I-rating 4.0 I-rating K&A Statement Ability to recognize indications for system operating parameters which are entry-level conditions for technical specifications SSES Cross-Reference Learning Objective(s) # 2112 , I.I BANK QUESTION (attach question)

X SSES exam bank Question # SM001 /08/ 1 L INPO exam bank Question #

C] Other facility exam bank Facility M Previous NRC exam Facility and date of exam L1 Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

F] SSES exam bank Question #

LI INPO exam bank Question #

LI Other facility exam bank Facility -

FI Previous NRC exam Facility and date of exam L Previous audit exam Facility and date of exam El NEW QUESTION An attachment to the examination will be required to answer this question.

Page 1 of 1

, 11" , -"

i -4'i' '-'i V

X YES NO Attachment required is:

T.S. 3.3.5.1 Review and Validation Comments TRG - Discussed concern regarding format and possible typo of TS action, no changes to question OPS - no comments Page 1 of 1

4 rBe-eI4.

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only X14nS y Both 2 LOD 10CFR55.41 X 10CFR55.43.2 Memory/Fundamental (rehension/Aonalyis Proposed Question (Refer to Attachment 2)

The following conditions exist:

  • Unit 1 is in Mode 5 preparing for a 1A 201 ESS Bus outage
  • Unit 2 is at 100% RTP
  • ESS transformer 101 trips on a fault condition (OA10306 trips)
  • ESS Buses 1A201 and 2A201 transfer to alternate power Which one of the following identifies the applicable T.S. action conditions, if any, to be entered at Unit 1 and Unit 2 under these conditions?

Unit I Unit 2

a. No LCO action required No LCO action required
b. Condition A of LCO 3.8.2 No LCO action required
c. No LCO action required Condition A of LCO 3.8.1
d. Condition A of LCO 3.8.2 Condition A of LCO 3.8.1 Page 1 of 1

i%~t ^::V07 I  : ,

Proposed Answer Reference(s) TS 3.8.1

c. correct - Both units have lost one off-site SM017 M-9 circuit unit 1 does not require entry into Mode TM-OP-003-ST 5 TS (2 busses) Unit 2 enters TS Discuss Distracters
a. incorrect - unit 2 must enter TS
b. incorrect - unit 2 must enter TS and unit 1 does not require entry into Mode 5 TS (2 busses)
d. incorrect - unit 1 does not require entry into Mode 5 TS (2 busses)

RO SRO Tier # 1 Tier #

Group # 1 Group #

K/A 295003 K/A 2.1.33 I-rating 4.0 I-rating K&A Statement Ability to recognize indications for system operating parameters which are entry-level conditions for technical specifications SSES Cross-Reference Learning Objective(s) # 5317 , II BANK QUESTION (attach question)

Du SSES exam bank Question #

D INPO exam bank Question #

D Other facility exam bank Facility D2 Previous NRC exam Facility and date of exam C: Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

[:] SSES exam bank Question #

[I INPO exam bank Question # .

rD Other facility exam bank Facility F] Previous NRC exam Facility and date of exam C] Previous audit exam Facility and date of exam -

CXNEW QETO Page 1 of 1

- .MV An attachment to the examination will be required to answer this question.

X YES NO Attachment required is:

Unit 1 TS 3.8.1/3.8.2/3.8.713.8.8 Unit 2 TS 3.8.113.8.213.8.7/3.8.8 Review and Validation Comments TRG - no comments OPS - modified stem to place Unit 1 in mode 5 Page 1 of 1

Attachment -

(Form ES-401-6 comparable)

RO only XI5 SRO only Both 3 LOD I OCFR55.41 X 10CFR55.43.5 X Memory/Fundamental Comprehension/Analysis Proposed Question (Refer to Attachment 2)

During a failure to scram condition on Unit 1 the following conditions exist:

  • RPV level is being maintained at -90 inches using HPCI
  • RPV pressure is 965 psig with BPVs a No boron has been injected Using the attached ES-161-001, Blowdown Mode Bypassing Interlocks", which

-RWCU one of the following identifies whythe procedure cannot be used for pressure control during execution of EQ-100-1 13, "Level/Power Control" with these plant conditions?

a. ES is not directed in this flowchart.
b. a pump must be operating to utilize this mode.

C. a RWCU low RPV level isolation signal exists.

d. APRM power is above the capacity of the RWCU heat exchangers.

Page 1 of 1

15Z i f<-a: L  :

if Proposed Answer Reference(s) ES-161-001

c. correct -ES-161-001 does not bypass L2 EO-100-113 isolation PPOO6 Discuss Distracters
b. incorrect - ES-161-001 allow operation with no pump at lower flow limit of 175 gpm
d. incorrect - RWCU operated at rated power to accomplish its purpose
a. incorrect - can be used provided boron has not been injected and ES-161-001 conditions are met RO SRO Tier # 1 Tier #

Group # 1 Group #

K/A 295009 K/A AA2.03 I-rating 2.9 I-rating K&A Statement Ability to determine and/or interpret the following as they apply to LOW REACTOR WATER LEVEL: Reactor water cleanup blowdown rate SSES Cross-Reference Learning Objective(s) # 5425 _ II BANK QUESTION (attach question)

LI SSES exam bank Question #

E INPO exam bank Question #

n Other facility exam bank Facility E Previous NRC exam Facility and date of exam n Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

LI SSES exam bank Question #

L INPO exam bank Question #

LI Other facility exam bank Facility El Previous NRC exam Facility and date of exam El Previous audit exam Facility and date of exam X NEW QUESTION Page 1 of 1 . wl,;

7.'

c the examination will be required to answer this question.

X NO Attachment required is:

ES-161-001, -RWCU Blowdown Mode Bypassing Interlocks" Review and Validation Comments TRG -

OPS - modified stem conditions and choice d now moved to a Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only X16 SRO only Both 2 LOD 10CFR55.41 X 10CFR55.43. 1 Memory/Fundamental X Comprehension/Analysis Proposed Question (Refer to Attachment 2)

While operating at 100% RTP on Unit 1, EO-100-104, SECONDARY CONTAINMENT CONTROL has been entered due to flooding in the HPCI room to the MAX SAFE level.

A leak in the fire suppression system pipe in the area has been identified and isolated but water level has not been restored below the MAX SAFE level.

Which one of the following Technical Specification actions should be entered?

a. T.S. 3.5.1, Action D for HPCI inoperability.
b. T.S. 3.5.3, Action A for HPCI and RCIC inoperability.
c. T.S. 3.5.1, Action E for HPCI and LPCI inoperability.
d. T.S. 3.0.3 for multiple ECCS equipment inoperability.

Page 1 of 1

-:V l 'A4,",',',i Proposed Answer Reference(s) ON-1 69-002

a. correct - HPCI area is separate from other EO-1 00-1 04 areas and this level indicates that the Aux oil T.S. 3.5.1 pump is submerged resulting in INOP AD045 however stm space is connected on this unit Discuss Distracters
b. incorrect - RCIC and HPCI are separate areas
c. incorrect - LPCI is in separate area
d. incorrect - 3.0.3 would be directed from Action I if HPCI and more than one ADS INOP RO SRO Tier # 1 Tier #

Group # 2 Group #

K/A 295036 K/A EA2.01 I-rating 3.2 I-rating K&A Statement Ability to determine and interpret the following as they apply to SECONDARY CONTAINMENT HIGH SUMP/AREA WATER LEVEL: Operability of components in the area SSES Cross-Reference Learning Objective(s) # 1358 I, BANK QUESTION (attach question)

FI SSES exam bank Question #

E INPO exam bank Question #

Lil Other facility exam bank Facility C: Previous NRC exam Facility and date of exam Li Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

LI SSES exam bank Question #

C] INPO exam bank Question #

LI Other facility exam bank Facility LI Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam X NEW QUESTION Page 1 of 1

An attachment to the examination will be required to answer this question.

X YES NO Attachment required is:

TS 3.5.1 Review and Validation Comments TRG -

OPS - modified to be Unit 2 due to steam space connection Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only <y Both 2 O 10CFR55.41 X 10CFR55.43.4

>/ ndm eryl~nta Comprehension/Analysis Proposed Question (Refer to-AttaeAont )

The Unit 1 RIB Stack Monitor Panel - Rad Meas. 1C216B (29-818') alarm horn has actuated and Green H light is illuminated.

Which one of the following identifies a source of airborne radioactivity that would result in this panel alarming?

a. Zone 3 Ventilation Exhaust.
b. Zone 2 Ventilation Exhaust.
c. Standby Gas Treatment Exhaust.
d. Unit 1 Turbine Building Ventilation Exhaust.

Page 1 of 1

Proposed-Answer Reference(s) ON-070-001

a. correct - Each RB has it's own stack AD045 Discuss Distracters
b. incorrect - would alarm U2 stack alarm
c. incorrect - would alarm SBGT stack alarm
d. incorrect - would alarm U1 TB stack RO SRO Tier # 1 Tier #

Group # 2 Group #

K/A 295034 K/A y EA2.02 I-rating 4.2 I-rating K&A Statement Ability to determine and interpret the following as they apply to SECONDARY CONTAINMENT VENTILATION HIGH RADIATION: Cause of high radiation levels SSES Cross-Reference Learning Objective(s) # v 1358 , _ _ , _I_ I BANK QUESTION (attach question)

Fl SSES exam bank Question #

El INPO exam bank Question #

E1 Other facility exam bank Facility El Previous NRC exam Facility and date of exam El Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

E1 SSES exam bank Question #

El INPO exam bank Question #

L Other facility exam bank Facility El Previous NRC exam Facility and date of exam El Previous audit exam Facility and date of exam etuestion An attachment to the examination will be required to answer this question.

Page 1 of 1

YES X N Attachment required is:

Review and Validation Comments TRG - Identified choice B as Non plausible Discussed indication in stem that MVP could be in operation lending plausibility to choice a

OPS - changed to address RB rad as source vs. RW Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only .nEEy Both ( D 10CFR55.41 X 10CFR55.43.5 Memory/Fundamental ehension/AnaIysi Proposed Question (Rcfer to Attschmon 2)

Which one of the following identifies the Primary Containment High Range Radiation Monitor (RITS-1 5720A1B) inoperability condition that requires a special report be submitted to the NRC and the time requirement for that report?

Monitors INOP Required Report Time

a. One for >7 days 14 day
b. One for > 30 days 30 day
c. Two for > 7 days 14 day
d. Two for > 30 days 30 day Page 1 of 1

Proposed Answer Reference(s) TS 3.3.3.1/5.6.7

c. correct - TS 3.3.3.1 Action C/D Table NDAP-QA-0720 3.3.3.1 -11F15.6.7 AD044A TM-OP-079X-ST Discuss Distracters
a. incorrect - one allowed inop for 30 days before report reqd
b. incorrect - Action A but this would be a 14 day report time
d. incorrect - would Action C but this would be a 14 day report time RO SRO Tier # 2 Tier #

Group # 2 Group #

K/A 272000 K/A >

2.4.30 I-rating 3.6 I-rating K&A Statement Knowledge of which events related to system operations/status that should be reported to outside agencies SSES Cross-Reference Learning Objective(s) # 2 4398 , /4399 _ __

BANK QUESTiON (attach question)

El SSES exam bank Question #

E INPO exam bank Question #

3 Other facility exam bank Facility El Previous NRC exam Facility and date of exam El Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

El SSES exam bank Question #

El INPO exam bank Question #

E] Other facility exam bank Facility E] Previous NRC exam Facility and date of exam El Previous audit exam Facility and date of exam Page 1 of 1

KNEW TIONs

~a tm ent to the examination will be required to answer this question.

NO Attachment required is:

TS 3.3.3.1 Review and Validation Comments Page 1 of 1

, 0 WRITTEN EXAMINATION QUESTION WORKSHEET Attachment I (Form ES-401-6 comparable)

RO only 1onon Both 2 LOD 10CFR55.41 X 10CFR55.43.5 Memory/Fundamental eComprehension/An is Proposed Question (Refer to Attachment 2)

During removal of a Waste shipping cask from the site, an automobile accident at the site access on Route 11 causes a localized release of airborne contamination. No injuries were involved but the responding security guard received an intake that is approximately 7 times the occupational annual limit. The guard is on site being decontaminated and no other individuals were exposed.

Which one of the following identifies the most restrictive reportability time requirement?

a. 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> report
b. 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> report C. 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> report
d. 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> report

Proposed Answer Reference(s) NDAP-QA-0720

a. correct - Attachment E, 5.b. -

AD044A Discuss Distracters

b. incorrect - AUt F 4. This could be possible if were released to public
c. incorrect - Aft G 3. This would be if injured/contaminated and transported offsite
d. incorrect - Att H 2.b. this would be if exposed to 1 occupational annual limit RO SRO Tier # 1 Tier #

Group # 1 Group #

K/A 295017 K/A 2.4.30 I-rating 3.6 I-rating K&A Statement Knowledge of which events related to (high off-site release rates) system operations/status that should be reported to outside agencies SSES Cross-Reference Leaming Objective(s) # 4398 __ _ __ _ I I___ _ __ _ _

BANK QUESTION (attach question)

Li SSES exam bank Question #

L INPO exam bank Question #

Li Other facility exam bank Facility F Previous NRC exam Facility and date of exam F Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

FI SSES exam bank Question #

L1 INPO exam bank Question #

L1 Other facility exam bank Facility FI Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam Page 1 of I

NEW QU N An attachment to the examination will be required to answer this question.

X YES NO Attachment required is:

NDAP-QA-0720 Review and Validation Comments TRG -

OPS -

Page 1 of I

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment I (Form ES-401-6 comparable)

RO only n 20 'O ly Both 2 LOD 10CFR55.41 X 10CFR55.43.4 d Comprehension/Analysis Proposed Question (Refer to Attachment 2)

Which one of the following shift positions is responsible for directly supervising and directing Radwaste operations per OP-AD-002, "Standards for Shift Operations"?

a. Shift Supervisor
b. Radwaste Supervisor
c. Unit 1 Unit Supervisor
d. Assistant Unit Supervisor Page 1 of 1

V '"'K '-xt It" Proposed Answer Reference(s) -

OP-AD-002

d. correct - per OP-AD-002 step 5.9.1.f/g -

NDAP-QA-0300 AD044A Discuss Distracters

a. incorrect - has control room command function
c. incorrect - responsible for control room activities for respective unit and common systems
c. incorrect - this individual got direction from AUS and no longer exists RO SRO Tier # 3 Tier #

Group # Group #

K/A 2.3.3 K/A I-rating 2.9 I-rating K&A Statement Knowledge of SRO responsibilities for auxiliary systems that are outside the control room (eg. Waste disposal and handling systems)

SSES Cross-Reference Learning Objective(s) # 4071 , _I I BANK QUESTION (attach question)

II SSES exam bank Question #

D INPO exam bank Question #

D Other facility exam bank Facility i Previous NRC exam Facility and date of exam E Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

El SSES exam bank Question #

L INPO exam bank Question #

El Other facility exam bank Facility El Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam Page 1 of 1

And:A .;Ali .- P CNWQESTION?

An attachment to the examination will be required to answer this question.

YES X NO Attachment required is:

Review and Validation Comments TRG -

OPS -

Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SR Both 10CFR55.41 X 10CFR55.43.2 Memory/Fundamental C ehension/Anal Proposed Question PKeer to Attanm lr2)

Which one of the following identifies the required Drywell area temperature instruments needed to determine that Drywell Air Temperature is below the LCO value per Unit Technical Specifications?

a. All four Division 1 temperature instruments can be averaged with the four Division 2 instruments inoperable without using substitute values.
b. At least six of the eight temperature instruments from either Division can be averaged with the remaining two instruments inoperable using substitute values.
c. The two Accident Monitoring temperature instruments can be averaged with all eight non-Accident Monitoring instruments inoperable without using substitute values.
d. At least two of the four Division 1 and two of the four Division 2 temperature instruments can be averaged with the remaining instruments inoperable using substitute values.

Page 1 of 1

Proposed Answer Reference(s) TS 3.6.1.5 B

b. correct - TS bases SR 3.6.1.5.1 TM-OP-059Z-ST Discuss Distracters
a. incorrect - must have at least 6 of 8
c. incorrect - 2 of the 8 are the two Accident monitor instruments per TS 3.3.3.1 PAM
d. incorrect - this total would be below the 6 required RO SRO Tier # 1 Tier #

Group # 2 Group #

K/A 295012 K/A LI/

AA2.01 I-rating 3.9 I-rating K&A Statement Ability to determine and interpret the following as they apply to HIGH DRYWELL TEMPERATURE: Drywell temperature SSES Cross-Reference Learning Objective(s) # 2 10511 I I BANK QUESTION (attach question)

LI FII SSES exam bank Question #

INPO exam bank Question #

FI LI Other facility exam bank Facility Qo Previous NRC exam LI Facility and date of exam Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

LI SSES exam bank Question #

LI INPO exam bank Question #

C] Other facility exam bank Facility LI Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam t EWQESTION Page 1 of 1

,Ap~a.a3rahment to the examination will be required to answer this question.

~j~) ~NO Attachment required is:

TS 3.6.1.5 and Bases Review and Validation Comments TRG -

OPS -

Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SR Both 10CFR55.41 X 10CFR55.43.5 Memory/Fundamental (e e so n/AnAiis Proposed Question fRfelrto -ALachmennt A total loss of Instrument Air system pressure has occurred on Unit 1 and cannot be restored. The EOPs have been entered and Rapid Depressurization unsuccessfully performed with SRVs requiring alternate depressurization methods to be utilized.

Which one of the following identifies the available systems that should be directed to rapidly depressurize the RPV per EO-100-1 12, "Rapid Depressurization" with this loss of IA?

a. RCIC and MSL drains.
b. SJAE and MSL drains.
c. RFPT and Available BPV's.
d. RCIC and Available BPV's.

Page 1 of 1

Proposed Answer Reference(s) EO-100-1 12

a. correct - IA does not prevent use of RCIC EO-000-1 12 or MSL drains PPOO2 .

Discuss Distracters

b. incorrect - OUTBD MSIVs isolate SJAE
c. incorrect - OUTBD MSIVs isolate RFPT and BPV header
d. incorrect - OUTBD MSIVs isolate BPV header RO SRO Tier # 1 Tier #

Group # 2 Group #

K/A 295019 K/A _,

2.4.6 I-rating 4.0 I-rating

,. K&A Statement Knowledge of symptom based EOP mitigation strategies SSES Cross-Reference Learning Objective(s) # 2628 , I BANK QUESTION (attach question)

III SSES exam bank Question #

D: INPO exam bank Question #

II Other facility exam bank Facility D1Previous NRC exam Facility and date of exam El Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

D SSES exam bank Question #

FDINPO exam bank Question #

DOther facility exam bank Facility LIPrevious NRC exam Facility and date of exam El Previous audit exam Facility and date of exam ESTION Page 1 of 1

An attachment to the examipplrWttbe-jequired to answer this question.

YES Attachment required is:.

Review and Validation Comments TRG -

OPS -

Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only SR Both 10CFR55.41 X 10CFR55.43.5 Memory/Fundamental <Yehension/A sis Proposed Question (Refei to ALttdah`rint 2 An explosion in the Off-gas system piping has resulted in a release in the area and a

loss of vacuum scram condition. The following conditions exist on Unit 1:

  • RPV level is -80 inches and stable
  • RPV pressure 1000 psig and stable using SRVs
  • Reactor power is 25% RTP and stable
  • SLC is injecting
  • No process radiation monitors have alarmed during the event
  • Offgas piping is isolated and no longer releasing to atmosphere Which one of the following identifies the ability to assign ES-184-002, "Reopening MSIVs Bypassing Isolations" to reopen MSIVs and the status of the condenser used to make that decision?

ES Procedure Main Condenser

a. Should be directed Available
b. Should be directed Not available
c. Should not be directed Not available
d. Should not be directed Available Page 1 of 1

Proposed Answer Reference(s) EO-100-113 LQ/P-5 c correct - with offgas isolated no method EO-000-1 13 exists to establish vacuum PPOO2 Discuss Distracters

a. incorrect - not directed if condenser not available and incorrect assessment
b. incorrect - not directed if condenser not available
d. incorrect - incorrect assessment RO SRO Tier # 2 Tier #

Group # 2 Group #

K/A 271000 K/A 2.4.6 V I-rating 4.0 I-rating K&A Statement Knowledge of the symptom based EOP mitigation strategies SSES Cross-Reference Learning Objective(s) # ' 2680 ,_ _ II BANK QUESTION (attach question)

FI SSES exam bank Question #

Fli INPO exam bank Question #

FI Other facility exam bank Facility M Previous NRC exam Facility and date of exam R Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

CI SSES exam bank Question #

FI INPO exam bank Question #

LI Other facility exam bank Facility LI Previous NRC exam Facility and date of exam FI Previous audit exam Facility and date of exam NEQESTIONS Page 1 of 1

An ,p nemqt to the examination will be required to answer this question.

jES)

_ NO Attachment required is:,

EO-100-1 13 flowchart Review and Validation Comments TRG -

OPS -

Page 1 of 1

y ru WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only Both 2 LOD 1only I OCFR55.41 X 10CFR55.43.4 QEm nda mental) Comprehension/Analysis Proposed Question (Refer to Attachment 2)

With both units at 100% RTP on the back shift it is determined that a jacket water filling operation on the B Emergency Diesel Generator was performed using a contaminated hose. Samples indicate that the jacket water system has been contaminated.

Which one of the following identifies the notification requirement(s) for this condition per OP-AD-002, 'Standards for Shift Operations"?

a. Initiate an AR only.
b. Initiate an AR and complete SSES Emergent Issue Response Checklist only.
c. Complete SSES Emergent Issue Response Checklist and make a 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> ENS notification only.
d. Initiate an AR, complete SSES Emergent Issue Response Checklist and make a 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> ENS notification.

Page 1 of 1

K.

i 40.

I I-. i 77 Proposed Answer Reference(s) OP-AD-002

b. correct - step 7.5.2.c.(3) AD044A Discuss Distracters
a. incorrect - also requires immediate notification of duty manager via checklist
c. incorrect - no reportability required
d. incorrect - no reportability required RO SRO Tier # 2 Tier #

Group # 1 Group #

K/A 264000 K/A 2.1.14 I-rating 3.3 I-rating K&A Statement Knowledge of system status criteria which require the notification of plant personnel SSES Cross-Reference Learning Objective(s) # 4037 , I BANK QUESTION (attach question)

C] SSES exam bank Question #

Li INPO exam bank Question #

Li Other facility exam bank Facility Li Previous NRC exam Facility and date of exam C: Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

Li SSES exam bank Question #

Li INPO exam bank Question #

Li Other facility exam bank Facility Li Previous NRC exam Facility and date of exam Li Previous audit exam Facility and date of exam EWQESTIONS Page 1 of 1

Anatahen oth xmntonwl erqirdt nwrhsqeto YES X NO Attachment required is:

Review and Validation Comments TRG -

OPS - changed CR to AR in choices Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

RO only Both 10CFR55.41 X 10CFR55.43.2 vimoyFundam a Comprehension/Analysis Proposed Question (f~er to Attacfm [

Unit 1 is operating at 100% RTP, when it is reported that the fast acting solenoids on the Main Turbine Bypass valves will not function as designed.

Which one of the following identifies the bases for the required Technical Specification action(s) in this condition?

a. MCPR safety limit may be exceeded during a turbine generator load reject transient unless the MCPR penalty is applied.
b. MCPR safety limit may be exceeded during a feedwater controller failure transient after applying the MCPR penalty.
c. RPV pressure safety limit may be exceeded during a turbine generator load reject transient unless the MCPR penalty is applied.
d. RPV pressure safety limit may be exceeded during a feedwater controller failure transient after applying the MCPR penalty.

Page 1 of 1

Proposed Answer Reference(s) TS 3.7.6 B

a. correct - penalty reduces max power to TS 3.2.2 prevent exceeding SL on transient TM O-- P09aE-T Discuss Distracters
b. incorrect - penalty is action to allow continued ops
c. incorrect - this SL is associated with TS 3.4.11
d. incorrect - this SL is associated with TS 3.4.11 RO SRO Tier # 2 Tier #

Group # 1_ Group #

K/A 21000 K/A, 2.2.25 I-rating 377~ I-rating K&A Statement Knowledge of bases in Technical specifications for limiting conditions for operation and safety limits SSES Cross-Reference Learning Objective(s) # 10337 - ' ,

BANK QUESTION (attach question)

D SSES exam bank Question #

LII INPO exam bank Question #

D~Other facility exam bank Facility D- Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question) aI SSES exam bank Question #

LI INPO exam bank Question #

LI Other facility exam bank Facility LI Previous NRC exam Facility and date o ex-am El Previous audit exam Facility and date of exam ESTION Page 1 of 1

An attachment to the examin _ ~e equired to answer this question.

YES ( I Attachment required is:

Review and Validation Comments Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET

-3 Attachment 1 (Form ES-401-6 comparable)

X1 RO only SRO only Both 2 LOD X 10CFR55.41.5 10CFR55.43 X Memory/Fundamental Comprehension/Analysis Proposed Question (Refer to Attachment 2)

Which one of the following identifies the required RPV pressure and core flow conditions identified in Technical Specification Safety Limits to allow operation above 25% RTP?

RPV Pressure Core Flow

a. > 785 psig < 10 mlbm/hr
b. > 785 psig > 10 mlbm/hr
c. < 785 psig < 10 mlbm/hr
d. < 785 psig > 10 mlbm/hr Page 1 of 1

-j Proposed Answer Reference(s) TS 2.1.1.2

b. High flow and pressure required TM-OP-062-ST Discuss Distracters
a. low flow requires < 25% RTP
c. low pressure requires < 25% RTP
d. low flow or low pressure requires < 25%

RTP RO SRO 3 Tier # Tier #

Group # Group #

/ 2.2.22 K/A K/A 3.4 I-rating I-rating K&A Statement Knowledge of limiting conditions for operations and safety limits.

SSES Cross-Reference Learning Objective(s) # V 2616 I, BANK QUESTION (attach question)

L SSES exam bank Question #

L INPO exam bank Question #

L Other facility exam bank Facility L1 Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

LI SSES exam bank Question #

LI INPO exam bank Question #

L Other facility exam bank Facility LI Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam (X NEW QUESTION An attachment to the exam uired to answer this question.

YES Attachment required is:

Page 1 of 1

-j Review and Validation Comments No comments Page 1 of 1

1 WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

X2 RO only SRO only Both 3 LOD e X 10CFR55.41 .6 I .

. - 1.I I . ".1-t .

, 4  ; .. .. .. I 10CFR55.43 Memory/Fundamental X Comprehension/Analysis Proposed Question (Refer to Attachment 2)

Unit I is operating at 100% RTP. The following Standby Liquid Control System conditions exist following SLC tank filling:

  • SLC tank temperature is 70 0F
  • AR 107 B03, STANDBY LIQUID TANK HI/LO TEMP is in alarm
  • SLC tank level is 5100 gallons
  • AR 107 C03, STANDBY LIQUID TANK HI/LO LEVEL is in alarm
  • Chemistry sample results after filling indicate that the concentration of the sodium pentaborate solution in the SLC tank is 15.4% by weight Which one of the following identifies the status of the SLC system according to Technical Specifications?
a. The LCO is satisfied.
b. Tank temperature does not meet the LCO conditions.
c. Tank available volume does not meet the LCO conditions.
d. Sodium pentaborate concentration does not meet the LCO conditions.

I 1 .11.,; :,

. . . 7. -: ,

Page 1 of I

-1 , - . .1 .. '.

Proposed Answer Reference(s) TS 3.1.7

b. correct - temp is below the value on figure TM-OP-053-ST 3.1.7-2 for the given concentration Discuss Distracters
a. incorrect - would be correct if temp was in spec on figure 3.1.7-2
c. incorrect - volume is acceptable per 3.1.7-1 for the given concentration
d. incorrect - conc. is acceptable for the given volume RO SRO 2 Tier # Tier #

1 Group # Group #

211000 K/A K/A 2.1.33 3.4 I-rating I-rating K&A Statement Ability to recognize indications for system (SLC) operating parameters which are entry-level conditions for technical specifications.

SSES Cross-Reference Learning Objective(s) # 10099 , I I BANK QUESTION (attach question)

EI SSES exam bank Question #

LI INPO exam bank Question #

LI Other facility exam bank Facility L Previous NRC exam Facility and date of exam El Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

X SSES exam bank Question # SY0171C3/1 4/1 LI INPO exam bank Question #

E] Other facility exam bank Facility .

LI Previous NRC exam Facility and date of exam L Previous audit exam Facility and date of exam LI NEW QUESTION An attachment to the examination will be required to answer this question.

X YES NO Page 1 of 1

Attachment required is:

Technical Specification section 3.1.7 Review and Validation Comments TRG - Modified stem conditions to identify alarms and conditions that resulted in this configuration (i.e.'tank filling) also changed parameters to indicthattank '

temperature is the condition that is outside T.S. LCO values.

OPS - changed shift management to supervision I

. . . . - I- - , I- . t I t

Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable) gn SRO only Both 2  :

X 10CFR55.41.7

.5.43 X Memory/Fundame Comprehension/Analysis Proposed Question (Refer to Attachmcnt 2)

A Unit 1 startup is in progress. The following conditions exist:

  • RPV Temperature (coolant) is 235 0 F
  • RPV Pressure is 5 psig
  • Reactor Power is on IRM Range 8
  • Vacuum is being maintained using the mechanical vacuum pump A rod drop accident occurs causing severe fuel damage and rising reactor coolant activity. Which one of the following identifies the automatic system trip/isolations that will occur as a direct result of this event?
a. Off-gas Isolation and MSIV closure.
b. Off-gas Isolation and Turbine Building HVAC isolation.
c. Reactor scram, MSIV closure and Mechanical Vacuum Pump trip.
d. Reactor scram, Mechanical Vacuum Pump trip and Turbine Building HVAC isolation.

Page 1 of 1

Proposed Answer Reference(s) TM-OP-079E-ST

c. correct - because MSL High Radiation is a P&ID M-107 direct input to system logic TM-OP-58-ST Discuss Distracters
a. incorrect - Off Gas does not isolate on high radiation
b. incorrect - TB HVAC has no high Radiation Trip circuit
d. incorrect - TB HVAC has no high Radiation Trip circuit RO SRO 1 Tier # Tier #

2 Group # _ Group#

j/ 295017 K/A K/A AA1.10 3.6 I-rating I-rating K&A Statement Ability to manually operate and/or monitor the following as they apply to HIGH OFF-SITE RELEASE RATE: RPS SSES Cross-Reference Learning Objective(s) # / 1200a II I UESTION (atta X SSES exam bank Question # AD045 /1357/ 21 I INPO exam bank Question #

n Other facility exam bank Facility El Previous NRC exam Facility and date of exam L Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

LI SSES exam bank Question #

LI INPO exam bank Question #

LI Other facility exam bank Facility EL Previous NRC exam Facility and date of exam L Previous audit exam Facility and date of exam LI NEW QUESTION Page 1 of 1

A An attachment to the examt il required to answer this question.

YES (Q_

Attachment required is:

Review and Validation Comments TRG - Modified choices to use each response twice only Modified stem for focus OPS - modified stem conditions to state maintaining vacuum vs. established Changed stem wording to fuel damage vs. fuel element failure Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable) nly SRO only BothI 2 LOD 10CFR55.41 X 10CFR55.43.2 X Memory/Fundamental Comprehension/Analysis ProDosed Question (Refer to Attachment 2)

After the appropriate lineups are verified the PCOP starts the uA" RHR pump in Shutdown Cooling Mode of operation but does not immediately raise flow above 4000 gpm per OP-249-002, "RHR Shutdown Cooling Operation". Which one of the following identifies the concern as a result of this action?

a. Heat exchanger tube vibration could occur.
b. Heat exchanger inlet valve cavitation could occur.
c. Pump impeller and casing overheating could occur.
d. Loss of reactor vessel water inventory could occur.

11 I: z0 .

Page 1 of 1

Proposed Answer Reference(s) OP-149-002 section

d. correct - min flow opens on low flow after 3.1.8 30 sec TD TM-OP-049-ST Discuss Distracters
b. incorrect - this is the limit on HX RHRSW flow
a. incorrect - this is the limit on 10K gpm RHR flow thru HX
c. incorrect - F007 is closed but not disabled in SDC RO SRO 1 Tier # Tier #

3 Group # Group #

295021 K/A K/A 2.1.32 3.4 I-rating I-rating K&A Statement Ability to explain and apply system (Loss of Shutdown cooling) limits and precautions SSES Cross-Reference Learning Objective(s) # 197b , I BANK QUESTION (attach question)

X SSES exam bank Question # SY01 71C01/C17 L1 INPO exam bank Question #

El Other facility exam bank Facility Ej Previous NRC exam Facility and date of exam EL Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

L SSES exam bank Question #

L INPO exam bank Question #

E: Other facility exam bank Facility EL Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam LI NEW QUESTION Page 1 of 1

An attachment to the examination will be required to answer this question.

YES X NO Attachment required is:

Review and Validation Comments TRG - Modified stem wording to eliminate window dressing Corrected procedure number to reflect Unit 2 OPS - changed to RO only question OLD SRO 2 Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable) i 3n SRO only Both X 10CFR55.41.7 CFR5.43 X: Memory/Fundament Comprehension/Analysis Proposed Question tRfertoeAttdci.mt-2)d During control rod exercising on Unit 1 three different rod select lights illuminate when rod 30-35 is selected at the rod select matrix.

Which one of the following identifies the Reactor Manual Control System status lamp and control rod block status under this condition?

Illuminated Lamp Rod Block Status

a. Data Fault Block applied
b. Data Fault No block applied
c. Rod Select Block Block applied
d. Rod Select Block No block applied Page 1 of 1

Proposed Answer Reference(s) TM-OP-056A-ST

a. correct - transponder failure, test or scan mode failures light this 1C651 indication and cause a block Discuss Distracters
b. incorrect - block will occur
c. incorrect - this would light with matrix key in OFF
d. incorrect - this would light with matrix key in OFF and a block will occur RO SRO 2 Tier # Tier #

1 Group # Group #

v 201002 K/A K/A A4.05 3.1 I-rating I-rating K&A Statement Ability to manually operate and/or monitor in the control room: Rod select matrix SSES Cross-Reference Learning Objective(s) # '- 2329n II I ABANK QUESTION (attach questi X SSES exam bank Question # SY017KO7/C 26 D INPO exam bank Question #

LII Other facility exam bank Facility LI Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

[II SSES exam bank Question #

LI INPO exam bank Question #

C] Other facility exam bank Facility L Previous NRC exam Facility and date of exam L Previous audit exam Facility and date of exam a NEW QUESTION An attachment to the examination will be required to answer this question.

Page 1 of 1

YES X N Attachment required is:

Review and Validation Comments TRG - Corrected choice b to unit terminology OPS - Changed to two column format Changed stem to plant conditions that have occurred here at SSES Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

X6 RO only SRO only Both 3 LOD x 10CFR55.41 .6 10CFR55.43 Memory/Fundamental X Comprehension/Analysis Proposed Question (Refer to Attachment 2)

During a reactor startup on Unit 2, an IRM INOP and a resultant IRM BID/F/H UPSCALEIINOP alarm, rod block and half scram occurs.

I&C determines that IRM drawer"B" has a module unplugged and places the drawer mode switch from OPERATE to the STBY position.

Which one of the following identifies the response of the Rod Block and drawer INOP trip circuit if the INOP INHIBIT pushbutton inside IRM drawer "B" is depressed and held?

Rod Block INOP TriD

a. Clears Clears
b. Remains in Clears
c. Clears Remains in
d. Remains in Remains in Page 1 of 1

1: - -

........, i_m

. . gU}

..V*"

cW *&

4  ;" '-"

1. c - - -

ProDosed Answer Reference(s) TM-OP-078B-ST

d. correct - PB will only clear block if due to drawer mode switch not in OPER Discuss Distracters - : :_ - : . .j I I I I It
a. incorrect - this would occur if INOP were due to drawer mode switch only
b. incorrect - INOP would remain in due to module unplugged INOP trip
c. incorrect - rod block would remain in due to module unplugged INOP trip RO SRO 2 Tier # Tier #

1 Group # Group #

215003 K/A K/A A4.04 3.1 I-rating I-rating K&A Statement Ability to manually operate and/or monitor in the control room: IRM backpanel switches, meters and indicating lights SSES Cross-Reference Learning Objective(s) # 10231b I I BANK QUESTION (attach question)

EL SSES exam bank Question #

El INPO exam bank Question #

Ci Other facility exam bank Facility EL Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

X SSES exam bank Question # SY01710 2/C 2 Li INPO exam bank Question #

Li Other facility exam bank Facility .

Li Previous NRC exam Facility and date of exam Li Previous audit exam Facility and date of exam Li NEW QUESTION Page 1 of 1

An attachment to the examination will be required to answer this question.

YES X NO Attachment required is:

Review and Validation Comments TRG - no comments OPS - Reworded stem for clarification of conditions Changed on drawer to inside drawer for PB location in stem Iage 1Ot 1 0 .r

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

SRO only Both 3 LOD X 10CFR55.41.6 10CFR55.43 Memory/Fundamental Corn Proposed Question (Refer to Attachment 2)

Power accession is in progress with Unit 1 at 10% RTP in Mode 1, when an input LPRM to APRM 'A' fails downscale. The APRM downscale alarm comes in. APRM currently has seven input LPRMs bypassed.

Which one of the following identifies the impact of these conditions on continued rod withdrawal and required actions per plant procedures?

a. A rod block exists. The failed LPRM should be bypassed to clear the rod block.
b. A rod block exists. The failed LPRM and 'A' APRM should be bypassed to clear the rod block.
c. No rod block exists but the failed LPRM should be bypassed to clear the alarm.
d. No rod block exists but the failed LPRM and 'A' APRM should be bypassed to clear the alarm.

Page 1 of 1

  • 4 q.4 4Y.*

4.4 Proposed Answer Reference(s) AR-1 03-001

b. correct - a block exists due to the TM-OP-078D-ST downscale and an INOP trip will exist once the LPRM is bypassed requiring the APRM be bypassed to allow rod withdrawal Discuss Distracters
a. incorrect - an APRM INOP rod withdrawal block will occur when the LPRM is bypassed
c. incorrect - APRM downscale block now exists
d. incorrect - APRM downscale block now exists RO SRO 2 Tier # Tier #

1 Group # Group #

215005 K/A K/A A2.03 3.6 I-rating I-rating K&A Statement Ability to (a) predict the impacts of the following on the AVERAGE POWER RANGE MONITOR/LOCAL POWER RANGE MONITOR SYSTEM; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Inoperative trip (all causes)

SSES Cross-Reference Learning Objective(s) # 2358j __ _ _ _ I _ _ __ _ _ _I_ _

BANK QUESTION (attach question)

Fl SSES exam bank Question #

Fl INPO exam bank Question #

El Other facility exam bank Facility El Previous NRC exam Facility and date of exam El Previous audit exam Facility and date of exam 9_O~QESTION Ottac X SSES em Question # SY017' 104/C 6 al INPO exam bank Question #

Li Other facility exam bank Facility L Previous NRC exam Facility and date of exam L Previous audit exam Facility and date of exam Page 1 of 1

An attachment to the examination will be required to answer this question.

YES X NO Attachment required is:

Review and Validation Comments TRG -

OPS-Page 1 of I

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable) n SRO only Both X 10CFR55.41.12 10CFR55.43 Memory/Fundamental X Compren /na Proposed Question tJefe toAttaclnne1d-2)

Given the following conditions:

  • Unit 1 is making preparations for performing a procedure on a system in a radiation area with a 150 mr/hour dose rate.
  • The appropriate radiological precautions have been taken.
  • An HP briefing has been completed.

Using the As Low As Reasonably Achievable (ALARA) guidelines, which of the following methods provides the lowest total dose for completing this procedure?

a. One individual performing the procedure in the area for 35 minutes.
b. Two individuals performing the procedure in the area for 20 minutes.
c. One individual installing shielding in the area for 10 minutes then both performing the procedure for 35 minutes with a reduced dose rate of 7.5 mr/hr.
d. Two individuals installing shielding in the area for 5 minutes then both performing the procedure for 20 minutes with a reduced dose rate of 7.5 mr/hr.

Page 1 of 1

Proposed Answer Reference(s) NDAP-QA-0625

d. correct - 30.0 mr total exposure AD044B Discuss Distracters
a. incorrect - 87.500 mr total exposure
b. incorrect - 100.000 mr total exposure
c. incorrect - 33.75 mr total exposure RO SRO 3 Tier # Tier #

Group # Group #

v' 2.3.2 K/A K/A 2.5 I-rating I-rating K&A Statement Knowledge of facility ALARA program SSES Cross-Reference Learning Objective(s) # z 4798e I I QUESTION (attach questi Question # AD044 C/X.A.2.G/ 1 a INPO exam bank Question #

a Other facility exam bank Facility D Previous NRC exam Facility and date of exam a Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question) a SSES exam bank Question #

a INPO exam bank Question #

a Other facility exam bank Facility j Previous NRC exam Facility and date of exam a Previous audit exam Facility and date of exam LI NEW QUESTION An attachment to the examia re rqired to answer this question.

YES N Attachment required is:

Page 1 of 1

Review and Validation Comments Corrected calculation and modified stem for focus Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

SRO only Both X 10CFR55.41.8 10CFR55.43 CXy/Fundamenta Comprehension/Analysis ProDosed Question - to Aiwctmrn 2)

During operation of Unit 2 with ESS Bus 2A202 out of service a loss of ESS bus 2A203 occurs. It is desired to align RHR to Suppression pool sprays for temperature control.

Which one of the following identifies the available Unit 2 RHR Pump and Loop combinations to support this mode of operation from the control room?

Available Pump(s) Available Loop(s)

a. 2A only 2A and 2B
b. 2A and 2D 2A only
c. 2A and 2D 2A and 2B
d. 2D only 2A only Page 1 of 1

Proposed Answer Reference(s) TM-OP-049-ST

b. correct - Pumps have power and loop A valves are powered from ESS bus 2A Discuss Distracters
a. incorrect - D pump is also available and B loop valves are not
c. incorrect - B loop valves are not available
d. incorrect - A pump is also available RO SRO 2 Tier # Tier #

2 Group # Group #

,, 230000 K/A K/A K2.02 2.8 I-rating I-rating K&A Statement Knowledge of the electrical power supplies to the following: RHR pumps SSES Cross-Reference Learning Objective(s) # i 10499a , I BANK QUESTION (attach question)

C] SSES exam bank Question #

D INPO exam bank Question #

D Other facility exam bank Facility F Previous NRC exam Facility and date of exam EL Previous audit exam Facility and date of exam __

MODIFIED BANK QUESTION (attach question)

El SSES exam bank Question #

LI INPO exam bank Question #

L Other facility exam bank Facility L Previous NRC exam Facility and date of exam L Previous audit exam Facility and date of exam An NEW QUESTION i An attachment to the examination will be required to answer this question.

Page 1 of 1

YES X NO Attachment required is:

Review and Validation Comments TRG - Changed question from 233000 K2.02 to 230000 K2.02 and modified question.

OPS - made conditions more realistic to plant conditions (ie. Two ESS buses out of service simultaneously)

Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

SRO only Both ( )

X 10CFR55.41.3 10CFR55.43 Memory/Fundamental rehenso n/Analysjs Proposed Question (PRefer to Attachment 2)-

Actual RPV level is rising on Unit 2. Which one of the following describes the operation of the RPV level instrumentation and Feedwater Level Control system to this level transient?

Level instrument AP RFP Speed Demand

a. Rises Rises
b. Rises Lowers
c. Lowers Rises
d. Lowers Lowers Page 1 of 1

ProDosed Answer Reference(s) TM-OP-045-ST

d. correct - rising lvI reduces diff pressure TM-OP-080-ST between ref. And var. legs this in turn calls for less flow to restore IvI Discuss Distracters
a. incorrect - this would occur if actual level lowered
b. incorrect - this would occur if actual level lowered and controller failed
c. incorrect - this would occur if actual level raised and controller failed RO SRO 2 Tier # Tier #

1 Group # _ Group #

/ 259002 K/A K/A K5.03 3.1 I-rating __ I-rating K&A Statement Knowledge of the operational implications of the following concepts as they apply to REACTOR WATER LEVEL CONTROL SYSTEM: Water level measurement SSES Cross-Reference Learning Objective(s) # v 10292d , I I BANK QUESTION (attach question)

LI SSES exam bank Question #

LI INPO exam bank Question #

LI Other facility exam bank Facility LI Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

W SSES exam bank Question #

El INPO exam bank Question #

L Other facility exam bank Facility LI Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam t QUESTION Page 1 of 1

An attachment to the exam' b 4 required to answer this question.

YES Attachment required is:

Review and Validation Comments TRG - No Comments OPS - modified stem to clarify conditions Page 1 of 1

rv WRITTEN EXAMINATION QUESTION WORKSHEET Attachment I '

(Form ES-401-6 comparable)

<O only SRO only Both 3 LOD X 10OCFR55.41 .4 10CFR55.43 Memory/Fundamental Proposed Question (Refer to Attachment 2)

Unit 1 is operating at 100% RTP with TBCCW pump 1A running and 1 B in standby when a loss of power occurred to the running pump MCC. The following alarms come in:

  • AR-123GO1,TBCCWPUMPAMOTORTRIP
  • AR-123GO3,TBCCWPUMPSDISCHARGEHEADERLOPRESSURE Which one of the following identifies the expected response of the system pumps to these conditions if the MCC power is subsequently restored 25 seconds later'?

A Pump would B Pump would

a. restart auto start
b. remain off auto start C. restart remain in standby
d. remain off remain in standby I

'Page 1 of I

on

-k Proposed Answer Reference(s) TM-OP-01 5-ST

b. correct - Low pressure will start STBY pump, loss of power for >15 seconds will prevent pump restart on loss of power Discuss Distracters
a. incorrect - this would occur if power were restored within 15 seconds to A pump
c. incorrect - this would occur if pressure did not drop to 65 psig and power were restored within 15 seconds to A pump
d. incorrect - this would occur if pressure did not drop to 65 psig and power was not restored within 15 seconds to A pump RO SRO 2 Tier # Tier #

2 Group # Group #

400000 K/A K/A K4.01 3.4 I-rating I-rating K&A Statement Knowledge of CCWS design feature(s) and or interlocks which provide for the following: Automatic start of standby pump SSES Cross-Reference Learning Objective(s) # 1733a I I

. _ I BANK QUESTION (attach question)

Fl SSES exam bank Question #

El INPO exam bank Question #

rl Other facility exam bank Facility El Previous NRC exam Facility and date of exam El Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

El SSES exam bank Question #

El INPO exam bank Question #

El Other facility exam bank Facility El Previous NRC exam Facility and date of exam El Previous audit exam Facility and date of exam

- t-Page 1 of 1

An attachment to the examination will be required to answer this question.

YES X NO Attachment required is:

Review and Validation Comments TRG - Concern that alarm G03 would clear when pump started OPS - moved restoration of power to bottom of condition in stem identifying response:

is after these alarms come in 0Page 1 of 1  :

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

SRO only Both (7 )

X 10CFR55.41.10 10CFR55.43 Memory/Fundamental X ComprehensionA Proposed Question (cRfer to Attaehreft 2)

A loss of coolant accident and high drywell pressure scram has occurred on Unit 1.

With the Traversing In-core Probe system in a normal standby line up, which one of the following identifies the status of TIP system during execution of ON-1 59-002,

'Containment Isolation" to verify system response?

Ball Valve Purge Isolation Valve Positions Position on 1C601

a. Closed Open
b. Closed Closed
c. Open Open
d. Open Closed Page 1 of 1

Proposed Answer Reference(s) ON-1 59-001

b. correct - ball and purge valve auto isolate, AD045 TM-OP-078F-ST Discuss Distracters
a. incorrect - normal line up
c. incorrect - failure to auto isolate during traces
d. incorrect - following isolation with ball valve failure RO SRO 2 Tier # Tier #

3 Group # Group #

/ 215001 K/A K/A A3.03 2.5 I-rating I-rating K&A Statement Ability to monitor automatic operations of the TRAVERSING IN-CORE PROBE including: Valve operation SSES Cross-Reference Learning Objective(s) # 1 1357 , -' 2316a _ _ _, I BANK QUESTION (attach question)

EJ SSES exam bank Question #

LI INPO exam bank Question #

CI Other facility exam bank Facility a Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

LI SSES exam bank Question #

LI INPO exam bank Question #

LI Other facility exam bank Facility LI Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam X NEW QUESTION Page 1 of 1

An attachment to the examinat-wfwHe required to answer this question.

YES Attachment required is:

Review and Validation Comments Modified stem for focus Changed to column format.

Removed Shear valve indication to remove confusion Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

(Tjonly SRO only Both ( 2 LO~D 10CFR55.41.10 10CFR55.43 (X /Fundamenta Comprehension/Analysis Proposed Question R[fere to -Atachmrritz 2)

EO-100-1 12, 'Rapid Depressurization" step RD-9 asks "ARE ALL ADS VALVES OPEN?"

Which one of the following 1C601 indications are used to determine valve status per this step if the RPV is fully depressurized?

a. SRV OPEN annunciators only.
b. ADS solenoid lights and RPV pressure.
c. Acoustic Monitor red lights and RPV pressure.
d. SRV OPEN annunciators and Acoustic Monitor red lights.

Page 1 of 1

Proposed Answer Reference(s) EO-000-1 12

b. correct - with RPV depressurized acoustics EO-100-1 12 will not illuminate bases for step RD-9 PPOO2 Discuss Distracters
a. incorrect - alarms are from acoustic mon.
c. incorrect - acoustic mon. will not indicate at low RPV pressures
d. incorrect -acoustic mon. will not indicate at low RPV pressures RO SRO 2 Tier # Tier #

1 Group # Group #

218000 K/A K/A A1.04 4.1 I-rating I-rating K&A Statement Ability to predict and/or monitor changes in parameters associated with operating the AUTOMATIC DEPRESSURIZATION SYSTEM controls including:

Reactor pressure SSES Cross-Reference Learning Objective(s) # L/2621 c II I BANK QUESTION (attach question)

D SSES exam bank Question #

D INPO exam bank Question #

El Other facility exam bank Facility Fl Previous NRC exam Facility and date of exam Fl Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

El SSES exam bank Question #

El INPO exam bank Question #

El Other facility exam bank Facility El Previous NRC exam Facility and date of exam E Previous audit exam Facility and date of exam CEETTI Page 1 of 1

k a ment to the examination will be required to answer this question.

YENO Attachment required is:

EO-100-1 12 flowchart Review and Validation Comments TRG - Maked RO oriented vs. interpreting EOP flow charts OPS -

Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

( SRO only Both X 10CFR55.41.10 10CFR55.43 1_ery/FundamentI Comprehension/Analysis Proposed Question -(Refe to Attachrent 2)

Which one of the following describes the use of the SSES EOPs when the control room has been evacuated and control established at the Remote Shutdown Panel per ON-100-009, "Control Room Evacuation"?

a. EOP procedures take precedence and provide parameter control bands and strategies, ON-100-009 is entered and executed concurrently.
b. EOP procedures take precedence and provide parameter control bands and strategies, ON-1 00-009 is exited when the EOP entery condition occurs.
c. Control Room Evacuation procedures take precedence and provide adjusted parameter control bands and strategies, the EOPs are not entered from RSP.
d. Control Room Evacuation procedures take precedence and provide adjusted parameter control bands and strategies, the EOPs are entered but modified per ON-1 00-009.

Page 1 of 1

Proposed Answer Reference(s) ON-1 00-109

a. correct - per discussion section AD045 Discuss Distracters
b. incorrect - ON is not exited
c. incorrect - not EOP-ON strategy
d. incorrect - not EOP-ON strategy RO SRO 1 Tier # Tier#

2 Group # Group #

295016 K/A K/A 2.4.6 3.1 I-rating I-rating K&A Statement Knowledge symptom based EOP mitigation strategies.

SSES Cross-Reference Learning Objective(s) # / 1364 I I BANK QUESTION (attach question)

Fl SSES exam bank Question #

D INPO exam bank Question #

D Other facility exam bank Facility D Previous NRC exam Facility and date of exam D Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

FD SSES exam bank Question #

D1 INPO exam bank Question #

DOther facility exam bank Facility D Previous NRC exam Facility and date of exam Dj Previous audit exam Facility and date of exam X NEW QUESTIOn An attachment to the examintrrWilerequired to answer this question.

YES Page 1 of 1

Attachment required is:

Review and Validation Comments Corrected typos in stem and choices Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

X5 RO only SRO only Both (2 )

10CFR55.41.11 CFR55.43 X Memory/Fundamenta Comprehension/Analysis Proposed Question Bezel Lo AttacnmenL 2)

Work is underway in the spent fuel pool to cut old detector tubes and place them into a storage cask for removal. After cutting and moving a detector tube the following alarms are received in the control room:

  • AR-101 D05, REFUELING FLOOR AREA Hi RADIATION
  • AR-101 E05, SPENT FUEL POOL AREA HI RADIATION
  • PICSY format RADRX indicates upscale on the Refuel Floor Area and Spent Fuel Pool monitors Which one of the following describes the ability to determine area radiation levels on the Refuel Floor with this upscale condition?
a. SBGT Exhaust Radiation monitor PICSY display only.
b. Local reading of the Refueling Floor Area Radiation monitor only.
c. Refueling Floor Area High Range Accident monitor PICSY display and HP surveys.
d. Local reading of the Refueling Floor Area High Range Accident Radiation monitor only.

Page 1 of 1

Proposed Answer Reference(s) TM-OP-079B-ST

c. correct - accident monitor RE-13749 AR-101-001 indicates 100 to 1 million mR/hr and is on HiRAD PICSY display Discuss Distracters
a. incorrect - SBGT is not only method since hi range monitors are available and this would be release rad
b. incorrect - local would have same range and is rad hazard
d. incorrect - local would is rad hazard and PICSY is available RO SRO 1 Tier # Tier #

2 Group # Group #

v 295023 K/A K/A AA2.01 3.6 I-rating I-rating K&A Statement Ability to determine and interpret the following as they apply to REFUELING ACCIDENTS: area radiation levels SSES Cross-Reference Learning Objective(s) # v 1181f I I BANK QUESTION (attach question)

LI SSES exam bank Question #

LI INPO exam bank Question #

Fl Other facility exam bank Facility F Previous NRC exam Facility and date of exam F Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

L SSES exam bank Question #

L INPO exam bank Question #

L Other facility exam bank Facility LI Previous NRC exam Facility and date of exam L Pr vious audit exam Facility and date of exam X E USI Page 1 of 1

An attachment to the exami l`euired to answer this question.

YES Attachment required is:

Review and Validation Comments TRG -

OPS - No Comments Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable) 4 nl SRO only Both X 10CFR55.41.8 10CFR55.43 Memor Comprehension/Analysis Proposed Question (Rerer to AU2CI[eII )

Which one of the following identifies where the Core Spray System injects water into the reactor pressure vessel?

The Core Spray System injects water into the RPV through.....

a. spargers located in the downcomer annulus.
b. spargers located inside the shroud above the core.
c. connections on the "A" and "B" feedwater inlet piping.
d. connections on the "A" and "B" Recirculation system discharge piping.

Page 1 of 1

Proposed Answer Reference(s) TM-OP-051-ST

b. correct - two spargers inside shroud for CS to flood RPV during LOCA Discuss Distracters
a. incorrect - This is FW
c. incorrect - This is HPCI
d. incorrect - This is LPCI RO SRO 2 Tier # Tier #

1 Group # Group #

209001 K/A K/A K1.14 3.7 I-rating I-rating K&A Statement Knowledge of the physical connections and/or cause-effect relationships between LOW PRESSURE CORE SPRAY and the following: Reactor vessel SSES Cross-Reference Learning Objective(s) # -/20851 I I ANK QUESTION (attach question X SSES exam bank Question # SY017,J1/2258/ 3 D] INPO exam bank Question #

FL Other facility exam bank Facility L1 Previous NRC exam Facility and date of exam M Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

C: SSES exam bank Question #

LI INPO exam bank Question #

LI Other facility exam bank Facility LI Previous NRC exam Facility and date of exam El Previous audit exam Facility and date of exam NEW QUESTION Page 1 of 1

An attachment to the exa ine equired to answer this question.

YES Attachment required is:

Review and Validation Comments TRG - removed 'box" sparger from choice a OPS - No comments Page 1 of 1

) Upi~~~sl Fl~-4 -; -- ' . -. 0):':-

rX ~zt S0 vr WRITTEN-Fg*.E_ v "AttachmentI (Form ES-401-6 comparable)

(Enl SRO only Both 3 LOD X I OCFR55.41.7 10CFR55.43 Memory/Fundamental C omprehension/Analysis7 Proposed Question (Refer to Attachment 2)

Unit 2 RPV level has dropped to -130 inches due to a Loss of Coolant accident.

Which one of the following identifies the impact of arming and depressing both of the Unit 1 A and B Loop Core Spray Manual Initiation pushbuttons on 1C601?

Unit 1 Pumps Unit 2 Pumps

a. All start All pumps trip
b. All start Only A and C pumps trip
c. Only A and C start Only A and C pumps trip
d. Only A and C start All remain running Page 1 of 1 i i  :,

.i I .I i

v:

I I

n - 7 w,- 1 .% , t

Proposed Answer Reference(s) TM-OP-051-ST

c. correct - Both Unit LOCA logic Discuss Distracters
a. incorrect - this would defeat ECCS fucniction design on LOCA unit
b. incorrect - again this condition would cause EDG overload
d. incorrect - condition that would overload EDGs RO SRO 2 Tier # Tier #

1 Group # Group #

209001 K/A K/A A4.05 3.8 I-rating I-rating K&A Statement Ability to manually operate and/or monitor in the control room:

Manual initiation controls SSES Cross-Reference Learning Objective(s) # 2088a I I BANK QUESTION (attach question)

L SSES exam bank Question #

L INPO exam bank Question #

L Other facility exam bank Facility LI Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

El SSES exam bank Question # .

LI INPO exam bank Question #

El Other facility exam bank Facility LI Previous NRC exam Facility and date of exam R Previous audit exam Facility and date of exam Page 1 of 1

I II I E. O Nq 1 An attachment to the examination will be required to answer this question.

YES X NO Attachment required is:

Review and Validation Comments TRG - Concern about Unit 2 RPV pressure status OPS - Changed conditions on Unit 2 to LOCA with pumps running Modified choice a and d to plausible conditions s_,F,.-

-  : : 1. il . I

. . t. , ,

II . : r Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

SRO only Both (2 X 10CFR55.41.10 10CFR55.43 Memory/Fundamental Ceh ensionIA Proposed Question (F~rti tv ALlacn lt L) bus 'A' Unit 1 is in Mode 5 and has been shutdown for 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> when a loss of RPS procedure entry symptom occurs. Which one of the following identifies the off-normal that would be of concern during this loss?

a. ON-149-001, LOSS OF SHUTDOWN COOLING.
b. ON-155-007, LOSS OF CRD SYSTEM FLOW.
c. ON-164-002, LOSS OF REACTOR RECIRCULATION FLOW.
d. ON-184-001, MAIN STEAM LINE ISOLATION AND QUICK RECOVERY.

Page 1 of 1

Proposed Answer Reference(s) ON-1 58-001

a. correct - SDC isolation valve closes ON-1 49-001 requiring actions for loss of SDC AD045 Discuss Distracters
b. incorrect - this ON would not be entered due to RPS loss
c. incorrect - this would be a concern at power with loss of cooling to Recirc pumps
d. incorrect - this would be possible if both RPS A and B were lost RO SRO 2 Tier # Tier #

1 Group # Group #

212000 K/A K/A 2.4.4 4.0 I-rating I-rating K&A Statement Ability to recognize abnormal indications for system operating parameters which are entry-level conditions for emergency and abnormal operating procedures SSES Cross-Reference Learning Objective(s) # /1354 I I BANK QUESTION (attach question)

FZ SSES exam bank Question #

D INPO exam bank Question #

D Other facility exam bank Facility D Previous NRC exam Facility and date of exam a Previous audit exam Facility and date of exam ODIFIED BANK QUESTION (attach question X SSES exam bank Question # AD045 /C 145 EZ INPO exam bank Question #

a Other facility exam bank Facility D Previous NRC exam Facility and date of exam D Previous audit exam Facility and date of exam Page 1 of 1

NEW QUESTION An attachment to the exam s quired to answer this question.

YES N Attachment required is:

Review and Validation Comments Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable) nl SRO only Both 3 1LOD X 10CFR55.41.8 10CFR55.43 Memory/Fundamental ohensionIAnai Proposed Question 1(Refor to Attachment 2)-

Which one of the following is the basis for the size of the 42 gallon accumulator on the six ADS function SRVs?

This accumulator provides sufficient reserve nitrogen for.....

a. one ADS actuation with normal DW pressure and a reactor pressure of 1000 psig.
b. two ADS actuations with normal DW pressure and a reactor pressure of 0 psig.
c. one ADS actuation with maximum DW pressure of 45 psig and a reactor pressure of 0 psig.
d. two ADS actuations with maximum DW pressure of 45 psig and a reactor pressure of 1000 psig.

Page 1 of 1

ProDosed Answer Reference(s) TM-OP-083E-ST

c. correct - one cycle at limiting DP for nitrogen to open with RPV press low and DW pressure high Discuss Distracters
a. incorrect - this condition is design for smaller non-ADS accumulator
b. incorrect - this condition is not limiting condition for DP with DW at low press, also indicates two cycles
d. incorrect - this condition is not limiting condition for DP with RPV at high press, also indicates two cycles RO SRO 2 Tier # _ Tier#

1 Group # _ Group #

L,239002 K/A K/A K1 .06 3.4 I-rating I-rating K&A Statement Knowledge of the physical connections and/or cause-effect relationships between SRVs and the following: Drywell instrument air/drywell pneumatics SSES Cross-Reference Learning Objective(s) # / 2092c , , _

NK QUESTION (attach question X SSES exam bank Question # SYO17C4/2090/ 1 C: INPO exam bank Question #

C] Other facility exam bank Facility LI Previous NRC exam Facility and date of exam F1 Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

El SSES exam bank Question #

El INPO exam bank Question #

E Other facility exam bank Facility Page 1 of 1

El Previous NRC exam Facility and date of exam L1 Previous audit exam Facility and date of exam NEW QUESTION An attachment to the examin i quired to answer this question.

YES Q Attachment required is:

Review and Validation Comments TRG - corrected air to nitrogen in stem OPS - no comments Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

SRO only Both 2~LOD Xn 10CFR55.41 .7 10CFR55.43 CMemorlndmta Comprehension/Analysis Proposed Question (Rcfe1 t Allac,1mllI1 2 Following an automatic scram on Unit 1 from 100% RTP due to closure of the MVISIVs, a steam leak developed on the RCIC steam line in the pipe routing area and temperature has exceeded the isolation setpoint for 20 minutes and continues to rise. The RCIC system fails to isolate and all other plant systems respond as designed.

Which one of the following identifies the method(s) available to reduce RPV pressure and commence reactor cooldown per EO-1 00-102, `RPV Control"?

a. SRVs only.
b. RCIC only.
c. HPCI and RCIC only.
d. SRVs and HPCI only.

Page 1 of 1

Proposed Answer Reference(s) AR-1 08-001

a. correct - pipe tunnel is shared between -

AR-1 14-001 RCIC and HPCI TM-OP-050-ST Discuss Distracters

b. incorrect - RCIC isolates and trips
c. incorrect - RCIC and HPCI isolate and trip
d. incorrect - HPCI isolates and trips RO SRO 2 Tier # Tier #

1 Group # Group #

_ 217000 K/A K/A K3.03 3.5 I-rating I-rating K&A Statement Knowledge of the effect that a loss or malfunction of the REACTOR CORE ISOLATION COOLING SYSTEM will have on the following: Decay heat removal SSES Cross-Reference Learning Objective(s) # I/ 20151 , d10441(2) ,_I BANK QUESTION (attach question)

C] SSES exam bank Question #

El INPO exam bank Question #

El Other facility exam bank Facility .

El Previous NRC exam Facility and date of exam Fl Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

L SSES exam bank Question #

E INPO exam bank Question #

M Other facility exam bank Facility EL Previous NRC exam Facility and date of exam El Previous audit exam Facility and date of exam NEW UESION Page 1 of 1

An attachment to the examip wdla required to answer this question.

YES Attachment required is:

Review and Validation Comments TRG - Modified to identify temperature high for > 15 min timer OPS - Added failure to isolate to eliminate recovery or HPCI if temp drops below setpoint Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

(Enl SRO only Both X LODD x 10CFR55.41.7 10CFR55.43 Q~/Fund /mentam Comprehension/Analysis Proposed Question -tReferto Attacnment 2)-

While operating at 100% RTP on Unit 1 the following annunciator alarms:

  • AR-105 B03, EHC & AUX TRIP SYS 125 VDC POWER FAILURE Which one of the following identifies the effect this failure will have on the EHC/Main Turbine?
a. Loss of electrical speed signal will trip turbine immediately.
b. Mechanical trip solenoid and several turbine trips will be disabled.
c. Turbine operation will not be affected because PMG picks up loads.
d. Loss of power to Master Trip Solenoid Valve trips turbine immediately.

Page 1 of 1

Proposed Answer Reference(s) AR-105-001

b. correct - per AR-1 05 TM-OP-093L-ST TM-OP-093E-ST Discuss Distracters
a. incorrect - this would occur if low voltage DC were lost
c. incorrect - this system backs up UPS if

>1400 RPM

d. incorrect - powered from low voltage DC supply RO SRO 2 Tier # Tier #

1 Group # Group #

- 241000 K/A K/A K6.02 2.6 I-rating I-rating K&A Statement Knowledge of the effect that a loss or malfunction of the following will have on the REACTOR/TURBINE PRESSURE REGULATING SYSTEM: DC electrical power SSES Cross-Reference Learning Objective(s) # '."1641b I I BANK QUESTION (attach question)

FII SSES exam bank Question #

FII INPO exam bank Question #

D Other facility exam bank Facility D Previous NRC exam Facility and date of exam D Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

M SSES exam bank Question #

M INPO exam bank Question #

M Other facility exam bank Facility EL Previous NRC exam Facility and date of exam M Previous audit exam Facility and date of exam Page 1 of 1

An attachment to the examne required to answer this question.

YES Attachment required is:

Review and Validation Comments TRG - No comments OPS - No comments Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

CnI SRO only Both ( OD X 10CFR55.41.10 10CFR55.43 MemFnda aental Comprehension/Analysis ProDosed Question (R*fei to Attacnment 2 While operating at 100% RTP on Unit 1, a loss of coolant accident results in a high drywell temperature and pressure condition.

Which one of the following describes the suppression chamber conditions that exist if suppression chamber pressure reaches 13 psig per EO-100-103, "Primary Containment Control"?

Suppression chamber pressure indicates that.......

a. steam is bypassing the downcomer pipes.
b. downcomer pipe chugging is likely to occur.
c. the chamber design pressure has been reached.
d. the pressure suppression function has been exceeded.

Page 1 of 1

Proposed Answer Reference(s) EO-1 00-103

b. correct - 13 psig indicates 95% of non- EO-000-1 03 condensable gases are in the SC and PPOO2 chugging. is probable Discuss Distracters
a. incorrect - this is for exceeding PSL
c. incorrect - this value is 65 psig
d. incorrect - this is for PSL RO SRO 1 Tier # Tier #

2 Group # Group #

~,' 295028 K/A KIA EA2.05 3.6 I-rating I-rating K&A Statement Ability to determine and interpret the following as they apply to HIGH DRYWELL PRESSURE: Torus/suppression chamber pressure SSES Cross-Reference Learning Objective(s) # I/ 2621 f I I _

BANK QUESTION (attach question)

Ii SSES exam bank Question #

D INPO exam bank Question #

LI Other facility exam bank Facility L Previous NRC exam Facility and date of exam M Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

LI SSES exam bank Question #

LI INPO exam bank Question #

rI Other facility exam bank Facility LI Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam EWQESTIONS An attachment to the examination will be required to answer this question.

Page 1 of 1

YES X N Attachment required is:

Review and Validation Comments TRG -

OPS - No comments Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

( n SRO only Both X 10CFR55.41.4 10CFR55.43 Memor Comprehension/Analysis Proposed Question (Rofr to AttachmIet 2)

Which one of the following identifies the response of the associated Residual Heat Removal pump 1B unit cooler fan (1V21OB) when the RHR pump 1B is manually started for Suppression Pool Cooling from 1C601 ?

The room Unit Cooler will ......

a. auto start immediately.
b. require manual starting from the ventilation panel.
c. remain in standby and auto start if a high room temperature now occurs.
d. remain in standby and auto start if a LPCI auto initiation signal is now received.

Page 1 of 1

Proposed Answer Reference(s) TM-OP-049-ST

a. correct - UC starts on breaker position or room temp (Appx R)

Discuss Distracters

b. incorrect - auto start feature exists
c. incorrect - logic is temp or breaker
d. incorrect - logic is temp or breaker RO SRO 2 Tier # Tier #

3 Group # Group #

7/288000 K/A K/A K4.03 2.8 I-rating I-rating K&A Statement Knowledge of PLANT VENTILATION SYSTEMS design feature(s) and or interlock(s) which provide for the following: Automatic starting and stopping of fans SSES Cross-Reference Learning Objective(s) # "/181d I I BANK QUESTION (attach question)

El SSES exam bank Question #

El INPO exam bank Question #

Fl Other facility exam bank Facility LI Previous NRC exam Facility and date of exam El Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

C] SSES exam bank Question #

C] INPO exam bank Question #

Fl Other facility exam bank Facility Fl Previous NRC exam Facility and date of exam LI Previous audit exam Facility and date of exam NEQESTION)

Page 1 of 1

An attachment to the exam wi required to answer this question.

YES Q-2 Attachment required is:.

Review and Validation Comments TRG -

OPS - Modified stem for clarity Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

Gn SRO only Both X 10CFR55.41.10 100CFR55.43

< Fundam mn Comprehension/Analysis Proposed Question (Refet to A-Adt QIrienil 2)

Which one of the following identifies a condition requiring Independent Verification or Concurrent Verification per OP-AD-002, "Standards for Shift Operations"?

a. Manipulation of all safety and non-safety related components.
b. Clearing of Blocking on all safety and non-safety related components.
c. Application of Blocking on all safety and non-safety related components.
d. Restoration of installed jumpers, lifted leads, opened states links or removed fuses on all safety and non-safety related components.

Page 1 of 1

Proposed Answer Reference(s) OP-AD-002

c. correct-7.3.1.a AD044B Discuss Distracters
a. incorrect - step 7.3 note requires STAR
b. incorrect- step 7.3.1.b Safety related only
d. incorrect - step 7.3.2.c.(1) Safety related only RO SRO 3 Tier # Tier #

Group # Group #

./ 2.1.1 K/A K/A 3.7 I-rating I-rating K&A Statement Knowledge of conduct of operations requirements SSES Cross-Reference Learning Objective(s) # V 4501 , _ _ _

BANK QUESTION (attach question)

FLi SSES exam bank Question #

Li1INPO exam bank Question #

LI Other facility exam bank Facility LI Previous NRC exam Facility and date of exam Li1Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

L1 SSES exam bank Question #

Li INPO exam bank Question #

Li Other facility exam bank Facility Li Previous NRC exam Facility and date of exam EL Previous audit exam Facility and date of exam NE QESTION An attachment to the examip il required to answer this question.

YES Page 1 of 1

Attachment required is:

Review and Validation Comments TRG -

OPS - modified wording in all choices to indicate safety and non-safety related components vs. any wording from OP-AD Page 1 of 1

WRITTEN EXAMINATION QUESTION WORKSHEET Attachment 1 (Form ES-401-6 comparable)

( 3 SRO only Both 3L X 10CFR55.41.8 10CFR55.43 Memor Comprehension/Analysis Proposed Question {Rttlw to Attachmerit 2)

Which one of the following High Pressure Coolant Injection system Class 1E DC powered motor operated valves is required to re-align from the normal standby lineup to ensure injection during a SBO event?

a. Turbine Stop Valve (FV-1 5612).
b. Turbine Steam Supply Valve (FO01).
c. Turbine Steam Supply Inboard Isolation Valve (F002).
d. Turbine Steam Supply Outboard Isolation Valve (F003).

Page 1 of 1

Proposed Answer Reference(s) TM-OP-052-ST

b. correct - normally closed and DC powered Discuss Distracters
a. incorrect - hydraulic valve
c. incorrect - normally open AC powered
d. incorrect - normally open RO SRO 2 Tier # Tier #

1 Group # Group #

/206000 K/A K/A K2.01 3.2 I-rating I-rating K&A Statement Knowledge of electrical power supplies to the following: System valves (HPCI)

SSES Cross-Reference Learning Objective(s) # t/10367a I I BANK QUESTION (attach question)

FII SSES exam bank Question #

D INPO exam bank Question #

D-1 Other facility exam bank Facility FI Previous NRC exam Facility and date of exam E Previous audit exam Facility and date of exam MODIFIED BANK QUESTION (attach question)

LI SSES exam bank Question #

LI INPO exam bank Question #

LI Other facility exam bank Facility LI Previous NRC exam Facility and date of exam L Previous audit exam Facility and date of exam

_E _O An attachment to the examigatioz-w4I-be required to answer this question.

YES ( 9 Page 1 of 1

Attachment required is:

Review and Validation Comments TRG -

OPS - corrected typo in stem Page 1 of 1