Kewaunee Nuclear Power Plant Point Beach Nuclear Plant N490 Highway 42 6610 Nuclear Road Kewaunee, Wl 54216-9511 Two Rivers, Wl 54241 NM C 920 388 2560 920.755 2321 Committed to Nuclear Excellence Kewaunee / Point Beach Nuclear Operated by Nuclear Management Company, LLC NRC-02-084 September 6, 2002 10 CFR 50.4 Mr. Samuel J. Collins, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission One White Flint North Room 5 D2, Mail Stop 0-5 E7 11555 Rockville Pike Rockville, MD 20852
Dear Mr. Collins:
Docket 50-305 Operating License DPR-43 Kewaunee Nuclear Power Plant Compliance with Order for Interim Safeguards Security Compensatory Measures For Kewaunee Nuclear Power Plant On February 25, 2002, the U. S. Nuclear Regulatory Commission issued an Order that modifies the operating license for Kewaunee Nuclear Power Plant (KNPP) to require compliance with the specified interim safeguards and security compensatory measures.
The Order required certain actions be taken by the Nuclear Management Company, LLC (NMC) at KNPP within 20 days of issuance of the Order. KNPP submitted the 20-day response to the Order via letter dated March 18, 2002.
Item C.2 of the Order required KNPP report to the Commission when full compliance with the requirements described in Attachment 2 has been achieved.
The attachment to this letter contains the KNPP response.
The attachment to this letter does not contain safeguards information. All requirements of the Order were fully implemented on or before August 31, 2002.
Additional questions or clarifications associated with this submittal should be directed to Dr. M. P. Findlay, Director - Security, NMC at 715/377-3310.
Documentation supporting implementation of the requirements of the Order are available for inspection at KNPP.
Docket 50-305 NRC-02-084 September 6, 2002 Page 2 I declare under penalty of perjury that the foregoing is true and correct.
Executed on September 6, 2002.
Sincerely, Y/0-v 1 t "y 6AL
Thomas Coutu Site Vice President Kewaunee Nuclear Power Plant GIH Attachment cc - US NRC, Region III US NRC Senior Resident Inspector Letter from T. Coutu (NMC)
To Mr. Samuel J. Collins Dated September 6, 2002 Nuclear Management Company, LLC Docket 50-305 Kewaunee Nuclear Power Plant Compliance with Order for Interim Safeguards and Security Compensatory Measures
Docket 50-305 NRC-02-084 September 6, 2002, Page 1 NUCLEAR MANAGEMENT COMPANY, LLC DOCKET 50-305 KEWAUNEE NUCLEAR POWER PLANT Compliance with Order for Interim Safeguards and Security Compensatory Measures Order Requirement B.l.a KNPP is in compliance with this requirement.
B.l.b Signs have been placed in accordance with the requirements of the Order. KNPP has installed buoys in compliance with guidance received from the maritime authority having jurisdiction over this element of the Order. Such placement is subject to seasonal restrictions.
B.l.c KNPP is in compliance with this requirement. The required evaluation has been performed. The evaluation has concluded no action is required.
B.l.d The evaluation performed for Item B.1.c indicated that additional actions are not required.
B.2.a.(1)
An evaluation was performed in accordance with this requirement.
B.2.a.(2)
Following completion of the evaluation required in accordance with Item B.2.a.(1),
the requirements of this element as determined by the evaluation required by B.2.a.(1) of the Order were fully implemented.
B.2.b KNPP is in compliance with this requirement.
B.2.c Exception to this requirement was taken in the March 18, 2002, 20-day response submitted by KNPP. However, since the earlier submittal KNPP no longer takes the exemption. Therefore, KNPP is in compliance with the requirement.
B.2.d As stated in the March 18, 2002, 20-day response, this item is not applicable to KNPP.
B.2.e As stated in the March 18, 2002, 20-day response, KNPP is in compliance with this requirement.
B.3.a As stated in the March 18, 2002, 20-day response, KNPP is in compliance with this requirement.
Docket 50-305 NRC-02-084 September 6, 2002, Page 2 B.3.b The March 18, 2002, 20-day response, committed KNPP to be in compliance with this requirement by May 1, 2002. Compliance was achieved by that date.
B.3.c The March 18, 2002, 20-day response committed KNPP to be in compliance with this requirement by May 15, 2002. Compliance with the requirement was achieved by that date.
B.3.d As stated in the March 18, 2002, 20-day response, actions were taken in this area in response to the October 6, 2001 advisory. The response committed to additional procedure changes to be implemented by July 1, 2002. These procedure changes were implemented in accordance with the KNPP commitment.
KNPP is in compliance with this requirement.
B.3.e The March 18, 2002, 20-day response committed KNPP to revise certain procedures by May 15, 2002, and to complete training of appropriate personnel by August 15, 2002. KNPP is in compliance with these commitments.
B.4.a KNPP is in compliance with this requirement.
B.4.b KNPP is in compliance with this requirement.
B.4.c KNPP is in compliance with this requirement. Further, as a result of the required evaluation, KNPP has implemented a supplemental strategy to strengthen the security response.
B.4.d As stated in the March 18, 2002, 20-day response, KNPP is in compliance with this requirement.
B.4.e KNPP is in compliance with this requirement.
B.4.f KNPP is in compliance with this requirement.
B.4.g KNPP is in compliance with this requirement.
B.4.h The March 18, 2002, 20-day response committed KNPP to complete this element of the Order by July 8, 2002. KNPP is in compliance with this commitment.
B.4.i The March 18, 2002, 20-day response committed KNPP to complete this element of the Order by July 31, 2002. KNPP is in compliance with this commitment.
Docket 50-305 NRC-02-084 September 6, 2002, Page 3 B.5.a As stated in the March 18, 2002, 20-day response, KNPP is in compliance with this requirement. Detailed plans were developed in response to the October 6, 2001, Safeguards Advisory.
B.5.b KNPP is in compliance with this requirement.
B.5.c KNPP is in compliance with this requirement.
B.5.d KNPP is in compliance with this requirement.
B.5.e As stated in the March 18, 2002, 20-day response, KNPP is in compliance with this requirement.
B.5.f KNPP is in compliance with this requirement.