ML022530390

From kanterella
Jump to navigation Jump to search

Letter, Interim Safeguards and Security Compensatory Measures
ML022530390
Person / Time
Site: River Bend Entergy icon.png
Issue date: 09/09/2002
From: Zwolinski J
NRC/NRR/DLPM
To: King R
Entergy Operations
Webb M, NRR/DLPM, 415-1347
References
TAC MB4195
Download: ML022530390 (4)


Text

September 9, 2002 Mr. Rick J. King, Director Nuclear Safety Assurance Entergy Operations, Inc.

River Bend Station P. O. Box 220 St. Francisville, LA 70775

SUBJECT:

RIVER BEND STATION - REPLY TO RESPONSE TO ORDER FOR INTERIM SAFEGUARDS AND SECURITY COMPENSATORY MEASURES (TAC NO. MB4195)

Dear Mr. King:

On February 25, 2002, the U.S. Nuclear Regulatory Commission (NRC) issued Orders modifying the operating licenses for the River Bend Station to require compliance with the specified interim safeguards and security compensatory measures.

The NRC staffs letter of June 6, 2002, addressed your earlier response to the Orders and granted, in response to your request, an extension of time until June 14, 2002, for your submission of the required response for interim compensatory measures (ICM) B.2.a(1 & 2) and B.2.b.

The NRC staff has reviewed your response to ICM B.2.a(1 & 2) and B.2.b, submitted by your letter of June 12, 2002, and finds that you have satisfied the current reporting requirements of the Order.

R. King The NRC will determine the effectiveness of your implementation of the ICMs through on-site inspections. I would like to remind you that, pursuant to Section III.C.2 of the Order, you are to report to the Commission when you have achieved full compliance with the requirements described in Attachment 2 to the Order.

Please contact Mike Webb at (301) 415-1347 if you have any other questions on these issues.

Sincerely,

/RA/

John A. Zwolinski, Director Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-458 cc: See next page

R. King The NRC will determine the effectiveness of your implementation of the ICMs through on-site inspections. I would like to remind you that, pursuant to Section III.C.2 of the Order, you are to report to the Commission when you have achieved full compliance with the requirements described in Attachment 2 to the Order.

Please contact Mike Webb at (301) 415-1347 if you have any other questions on these issues.

Sincerely,

/RA/

John A. Zwolinski, Director Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-458 cc: See next page DISTRIBUTION:

PUBLIC SCollins/JJohnson BSheron WBorchardt LMarsh BBoger VDricks SMorris GTracy RCrlenjak EMerschoff, RIV MWebb OGC ACRS/ACNW SECY G. Hill (2)

PDIV-1R/F RMartin RAlbert RSullivan VOrdaz JBelanger RGramm KBrockman, RIV RPalla DJohnson Accession No.: ML022530390 OFFICE PDII-1(LPM)

PDIV-/PM PDIV-1/LA NSIR NAME RMartin NKalyanam MMcAllister AMadison DATE 8/29/02 8/29/02 8/29/02 8/30/02 OFFICE PDIV-1/SC PDIV-1/PD DLPM/D NAME RGramm WRuland JZwolinski DATE 9/3/02 9/4/02 9/9/02 OFFICIAL RECORD COPY

March 2002 River Bend Station cc:

Winston & Strawn 1400 L Street, N.W.

Washington, DC 20005-3502 Manager - Licensing Entergy Operations, Inc.

River Bend Station P. O. Box 220 St. Francisville, LA 70775 Senior Resident Inspector P. O. Box 1050 St. Francisville, LA 70775 President of West Feliciana Police Jury P. O. Box 1921 St. Francisville, LA 70775 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 Ms. H. Anne Plettinger 3456 Villa Rose Drive Baton Rouge, LA 70806 Mr. Michael E. Henry, Administrator and State Liaison Officer Department of Environmental Quality P. O. Box 82135 Baton Rouge, LA 70884-2135 Wise, Carter, Child & Caraway P. O. Box 651 Jackson, MS 39205 Executive Vice President and Chief Operating Officer Entergy Operations, Inc.

P. O. Box 31995 Jackson, MS 39286-1995 General Manager - Plant Operations Entergy Operations, Inc.

River Bend Station P. O. Box 220 St. Francisville, LA 70775 Director - Nuclear Safety Entergy Operations, Inc.

River Bend Station P. O. Box 220 St. Francisville, LA 70775 Vice President - Operations Support Entergy Operations, Inc.

P. O. Box 31995 Jackson, MS 39286-1995 Attorney General State of Louisiana P. O. Box 94095 Baton Rouge, LA 70804-9095 Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 1701 North Congress Avenue Austin, Texas 78701-3326 Mr. Paul D. Hinnenkamp Vice President - Operations Entergy Operations, Inc.

River Bend Station P. O. Box 220 St. Francisville, LA 70775