ML022520156

From kanterella
Jump to navigation Jump to search
Entergy, Emergency Planning Procedures
ML022520156
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 08/30/2002
From:
Entergy Nuclear Northeast
To:
Document Control Desk, Office of Nuclear Security and Incident Response
References
Download: ML022520156 (11)


Text

Entergy Indian Point 3 CONTROLLED DOCUMENT TRANSMITTAL FORM TO: DISTRIBUTION DATE 8/30/2002 TRANSMITTAL NO: 27202 FROM:IP3 DOCUMENT CONTROL GROUP EXTENSION: 2038 The Document(s) identified below are forwarded for use. In accordance with AP-18.2, please review to verify receipt, incorporate the document(s) into your controlled document file, properly disposition superseded, void, or inactive document(s). Sign and return the receipt acknowledgement below within fifteen'(15) working days.

AFFECTED DOCUMENT EMERGENCY PLAN PROCEDURES:

UNIT 3 DOC #

REV #

TITLE INSTRUCTIONS

                        • SEE ATTACHED FOR INSTRUCTIONS *****************
  • PLEASE NOTE EFFECTIVE DATES**

RECEIPT OF THE ABOVE LISTED DOCUMENT(S) IS HEREBY ACKNOWLEDGED. I CERTIFY THAT ALL SUPERSEDED, VOID, OR INACTIVE COPIES OF THE ABOVE LISTED DOCUMENT(S) IN MY POSSESSION HAVE BEEN REMOVED FROM USE AND ALL UPDATES HAVE BEEN PERFORMED IN ACCORDANCE WITH EFFECTIVE DATE(S) (IF APPLICABLE) AS SHOWN ON THE DOCUMENT(S).

NAME (PRINT)

SIGNATURE DATE CC#

Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.

Indian Point 3 NPP PO. Box 308 Buchanan, NY 10511 Tel 914 736 8000 NRC EMERGENCY PLA1NING CONTROL COPY NO.:

DATE:

SUBJECT:

Emergency Planning Procedures The enclosed revisions are for your controlled copy of the IP-3 Emergency Plan.

old sheets, insert new sheets, initial/date this transmittal and return it DOCUMENTS DEPARTMENT.

If you have any questions regarding these changes, Planning (x8404/x8318).

Please discard to the IP-3 call Emergency Thank you.

Volume II

- Emergency Response Activation Implementing Procedures Old Table of Contents Vol.

II IP-2200 Rev. 6 8/02 11/00 New Table of Contents Vol.

II IP-2200 Rev.7 I acknowledge the receipt of these revisions to the IP-3 Emergency Plan.

TO:

FROM:

8/30/02 8/30/02 8/02 (Date)

(Signature)

"--Entergy--

Paqe:

1 29_-AUG-02 DISTRIBUTION CONTROL LIST Document Name:

EMER PLAN CC-NAME NAME 1 PLANT MANAGER'S OFFICE 2 EP/TRAINING ADMINISTRATOR 3 RES DEPARTMENT MANAGER 4 REFERENCE LIBRARY 9 JOINT NEWS CENTER 10 SHIFT MGR.(LUB-001-GEN) 11 CONTROL ROOM & MASTER 14 EOF 16 AEOF/A.GROSJEAN(ALL EP'S) 19 NUC ENGINEERING LIBRARY 22 RESIDENT INSPECTOR 23 MCNAMARA N 24 MCNAMARA N 25 DOCUMENT CONTROL DESK 28 AVRAKOTOS N 29 E-PLAN STAFF 30 E-PLAN STAFF 31 BARANSKI J(VOLUME I ONLY) 32 MURPHY L -(VOLUME I ONLY) 33 LONGO N (VOLUME I ONLY) 34 GREENE D (VOLUME I ONLY) 35 RAMPOLLA M(VOLUME I ONLY) 41 SIMULATOR 107 QA MANAGER 319 C.STELLATO(NRQ-OPS TRN) 354 L.GRANT(LRQ-OPS/TRAIN) 376 E-PLAN STAFF 424 J.CHIUSANO(OPS INSTR) 510 L.GRANT(LRQ-OPS/TRAIN) 511 L.GRANT(LRQ-OPS/TRAIN) 512 C.STELLATO(NRQ-OPS TRN) 513 C.STELLATO(NRQ-OPS TRN) 517 PLANT MANAGER'S OFFICE 518 TSC 520 CONTROL ROOM (UNIT 2) 521 SIMULATOR 522 NRC RESIDENT 523 ROBERT VOGLE (UNIT 2) 524 JOHN MCCA*N (UNIT 2)

DEPT UNIT 3(UNIT 3/IPEC ONLY)

TRAINING (ALL EP'S)

RES (UNIT 3/IPEC ONLY)

REC/TRN(UNT 3/IPEC ONLY)

EMER PLN (ALL EP'S)

OPS (UNIT 3/IPEC ONLY)

OPS(3PT-D001/6(U3/IPEC)

E-PLAN (ALL EP'S)

E-PLAN (EOP'S ONLY)

DOC (UNIT 3/IPEC ONLY)

US NRC(UNIT 3/IPEC ONLY)

NRC (ALL EP'S)

NRC (ALL EP'S)

NRC (ALL EP'S)

J A(UNIT 3/IPEC ONLY)

E-PLAN (ALL EP'S)

E-PLAN (ALL EP'S)

ST.

EMERG.

MGMT.

OFFICE DISASTER & EMERGENCY EMERGENCY SERVICES DISASTER & CIVIL DEFENSE OFFICE OF EMERG MANAGE TRAIN(UNIT 3/IPEC ONLY)

QA (UNIT 3/IPEC)

NRQ (UNIT 3/IPEC ONLY)

LRQ (UNIT 3/IPEC ONLY)

E-PLAN (ALL EP'S)

(UNIT 3/IPEC ONLY)

LRQ (UNIT 3/IPEC ONLY)

LRQ (UNIT 3/IPEC ONLY)

NRQ (UNIT 3/IPEC ONLY)

NRQ (UNIT 3/IPEC ONLY)

ADMIN/(UNIT 2/IPEC ONLY)

UNIT 2(UNIT 2/IPEC ONLY)

OPS (UNIT 2 & IPEC ONLY)

TRAIN (UNIT 2/IPEC ONLY)

US NRC(UNIT 2/IPEC ONLY)

TRAIN/LIB (ALL EP'S)

NUC SAFETY/LIC(ALL EP'S)

LOCATION 45-3-B

  1. 48 45-4-A
  1. 48 EOF IP3 IP3(ONLY)

BOF WPO-12D WPO/7A 45-2-B OFFSITE OFFSITE OFFSITE OFFSITE EOF EOF OFFSITE WESTCHESTR ROCKLAND ORANGE PUTNAM 48-2-A TRL #2A

  1. 48
  1. 48 EOF
  1. 48
  1. 48
  1. 48
  1. 48
  1. 48 IP2 IP2 IP2 IP2 IP2 OFFSITE IP2

VOLUME II TABLE OF CONTENTS 08/30/02 ENTERGY NUCLEAR NORTHEAST INDIAN POINT NO.

3 NUCLEAR POWER PLANT EMERGENCY PLAN -

VOLUME II EMERGENCY RESPONSE ACTIVATION TABLE OF CONTENTS IC/EAL'S INITIATING CONDITIONS AND EMERGENCY ACTION LEVELS CONTROL ROOM IP-2000 Emergency Activation of the Control Room (CR)

IP-2001 Emergency Director (ED),

Plant Operations Manager (POM),

Shift Manager (SM)

Procedure IP-2002 CR Health Physics Technician IP-2003 CR Watch Chemist IP-2004 CR Clerk IP-2005 CR Offsite Communicator IP-2006 CR Direct-Line Communicator TECHNICAL SUPPORT CENTER (TSC)

IP-2100 Emergency Activation of the Technical Support Center (TSC)

IP-2101 Technical Support Center (TSC) Manager IP-2102 TSC Communicator(s)

IP-2103 TSC SPDS Computer Operator IP-2104 TSC Video Operator IP-2105 TSC Accountability Officer IP-2106 TSC Clerk REV.

/

DATE 9

07/02 4

16 3

6 3

2 4

4 9

3 4

2 VOID 5

09/98 08/02 02/99 07/02 09/00 06/01 10/99 11/00 02/01 12/98 08/99 06/01 N/A 06/99 OPERATIONS SUPPORT CENTER (OSC)

IP-2200 Emergency Activation of the Operations Support Center (OSC)

IP-2201 Operations Support Center (OSC)

Manager IP-2202 OSC Direct-Line Communicator IP-2203 OSC Dispatcher IP-2204 OSC Team Leaders IP-2205 OSC H.P. Team Leader IP-2206 OSC Accountability Officer IP-2207 OSC Clerk IP-2208 OSC Security Team Leader IP-2209 OSC H.P. Technician IP-2210 OSC Dosimetry Technician IP-2211 OSC Chemistry Team Leader 7

8/02 9 2 3

3 8

VOID 5

4 4

3 2

08/02 12/98 07/02 06/02 10/99 N/A 06/99 03/02 12/97 06/98 03/00

EnterGy EMERGENCY PLAN PROCEDURES PROCEDURE NO.

IP-2200 REV.

EMERGENCY ACTIVATION OF THE OPERATIONS SUPPORT CENTER (OSC)

THIS PROCEDURE IS TSR THIS PROCEDURE IS NOT TSR WRITTEN BY:

/4j,,A..

SIGNATURE/DATE REVIEWED BY:QýEDT APPROVED BY EFFECTIVE DATE:

REFERENCE TIGNATURE/DATE TITLE:

7 I

0]

PROCEDURE USE IS EMERGENCY ACTIVATION OF THE OPERATIONS SUPPORT CENTER (OSC)

VOIlUME Ii TABLE OF CONTENTS 08/30/02 ENTERGY NUCLEAR NORTHEAST INDIAN POINT NO.

3 NUCLEAR POWER PLANT EMERGENCY PLAN -

VOLUME II EMERGENCY RESPONSE ACTIVATION I t TABLE OF CONTENTS OPERATIONS. FACILITY (EOF)

REV.

/

bATE 5

IP-2300 Emergency Activation of the Emergency Operations Facility (EOF)

IP-2301 Emergency Director Replaced byIP-EP-255 IP-2302 EOF Technical Advisor and Information Liaison IP-2303 EOF Radiological Assessment Team Leader (RATL)

IP-2304 EOF Dose Assessment Health Physicist IP-2305 EOF MIDAS Operator IP-2306 EOF Security officer IP-2307 EOF Clerk IP-2308 EOF Direct-Line Communicator IP-2309 EOF Offsite Communicator IP-2310 EOF Onsite Radiological Communicator IP-2311 EOF Offsite Radiological Communicator IP-2312 EOF Public Relations Liaison IP-2313 EOF Public Relations Technical Advisor IP-2314 EOF Radiological Assessment Monitor ALTERNATE EMERGENCY OPERATIONS FACILITY (AEOF) 11/00 VOID -

N/A 10 5

5 4

7 5

4 4

4 4

VOID VOID VOID 07/02 11/00 07/02 03/00 12V98 10/99 03/00 09/00 08/02 06/99 N/A N/A N/A IP-2400 Emergency Activation of the Alternate Emergency Operations Facility (AEOF)

Replaced by IP-EP-251 SECURITY ACTIVATION IP-2500 Security Emergency Activation Responsibilities RECOVERY/TERMINATION IP-2600 Emergency Termination and Transition to Recovery Replaced by IP-EP-610 IP-2601 Recovery Manager Replaced by IP-EP-610 IP-2602 Development of a Recovery Action Plan Replaced by IP-EP-610 IP-2603 Recovery Support Group Manager EP-FORMS SECTION -

Index APPENDIX 'A' APPENDIX 'B' APPENDIX

'C' ROSTER I ROSTER II ROSTER III Emergency Offsite Telephone List Emergency Response Facility Telephone List VOID -

N/A 12 08/02 VOID -

N/A VOID -

N/A VOID -

N/A 1

07/02 07/02 07/02 07/02 06/02 06/02 06/02 (VI'JCVN

VOLUME II IP-2200 Rev.

7 EMERGENCY ACTIVATION OF THE OPERATIONS SUPPORT CENTER (OSC)

TABLE OF CONTENTS SECTION TITLE PAGE 1.0 Purpose 1

2.0 Responsibilities 1

3.0 References 1

4.0 Procedure 2

5.0 Attachments 5.1 OSC Setup 5.2 OSC Floorplan

VOLUME II IP-2200 Rev. 7 IP-2200 EMERGENCY ACTIVATION OF THE OPERATIONS SUPPORT CENTER (OSC) 1.0 PURPOSE 1.1 The purpose of this procedure is to provide instruction for setting up, and staffing the Operations Support Center (OSC).

The goal of this procedure is to prepare the OSC to provide personnel of various disciplines, to accomplish a variety of emergency tasks.

These tasks may be search and rescue, repair and corrective actions, special radiological monitoring forays, and/or equipment manipulation.

2.0 RESPONSIBILITIES 2.1 The OSC MANAGER is responsible for:

A.

Ensuring that the OSC is made operational in accordance with this procedure; B.

Ensuring that minimum staffing is attained, and; C.

Declaring the OSC activated as soon as minimum staffing can assume its responsibilities.

2.2 The OSC Staff is responsible for the following:

A.

Responding to the OSC, as required; B.

Performing the mandatory accountability card-in upon entry; C.

Setting up the OSC as per Attachment 5.1, "OSC Setup"; (the following technicians are not responsible for the set-up, but may assist as necessary: Maintenance, I&C, H.P., Waste Management and Dosimetry.

D.

Assuming assigned positions and ensuring that support staff are available and properly briefed; and, E.

Ensuring that relief personnel are fully briefed prior to assuming shift responsibilities.

3.0 REFERENCES

3.1 E-Plan Volume II, Series IP-2200 Procedures 3.2 EP-Form

  1. 10, "OSC Staffing Chart" 3.3 EP-Form
  1. 18, "OSC Emergency Briefing Form" 3.4 EP-Form
  1. 19, "NYPA Communications Message Form" IP-2200 Page 1 of 2

VOLUME II IP-2200 Rev. 7 4.0 PROCEDURE NOTE The steps in this procedure are not required to be performed in sequence.

INITIAL the blank, lines upon completion of the designated steps.

NOTE The OSC shall be staiffed at the ALERT, SITE AREA EMERGENCY, or GENERAL EMERGENCY classification levels, whichever comes first.

NOTE The Indian Point #3 OSC is located on the West Side of the Second Floor of the Administration Building, adjacent to the Turbine Building.

4.1 IF you are the first to arrive in the OSC, ASSUME responsibilities for setting up the OSC using Attachment 5.1, "OSC Setup".

4.2 SETUP the OSC in accordance with the instructions on Attachment 5.1, "OSC Setup".

(Also see.2, "OSC Floorplan".)

5.0 ATTACHMENTS 5.1 OSC Setup 5.2 OSC Floorplan END OF TEXT IP-2200 Page 2 of 2

VOLUME II IP-2200 Rev.7 Page 1 of 1 ATTACHMENT 5.1 OSC SETUP DATE:

1.

ENSURE availability of the Emergency Plan, Volumes I, II and III.

2.

ENSURE availability of the book of EP-Forms.

3.

DISTRIBUTE individual Position Books.

4.

PLACE the position name plates and name tags on desks.

REFER to Attachment 5.2, "OSC Floorplan".

5.

PLACE a supply of EP-Form #19, "NYPA Communications Message Form" near OSC Dispatcher and OSC Direct-Line Communicator.

6.

HAVE EP-Form #10, "OSC Staffing Chart" available for sign-in.

7.

DEACTIVATE voice mail on OSC Manager and OSC Team Leader phones by performing the following steps:

PICK-UP handset, PRESS 114, hang-up PICK-UP handset, PRESS 116, hang-up PICK-UP handset, PRESS 117, hang-up

8.

SET-UP Direct Line Communicator headset and the Portable Page System. Ensure their operability.

9.

SUPPLY the H.P. Team Leader with EP-Form #18.

"OSC Emergency Briefing Forms".

10.

HANG the status boards.

11.

Via the Operations Team Leader:

A.

CHECK ventilation for operability.

B.

PLACE R-41, R-42 and R-43 (OFF-CAL-H.V.OPER) switch to the OPER position at the TSC CP-42 Rad Monitor Panel.

NOTE A

ENSURE these Rad monitor channels are RESTORED to the CAL position at-the end of all Drills/Events and acknowledge the Fail Alarm Annunciator.

12.

SYNCHRONIZE ALL OSC clocks with the CONTROL ROOM Flight Panel clock.

13.

Via the I&C Team Leader, CHECK volume & operability of the Public Address (P.A.)

speaker.

14.

NOTIFY the OSC Manager when OSC setup is complete.

IP-2200

VOLUME II iP-2200 Rev.

7 Page 1 of 1 ATTACHMENT 5.2 OSC FLOORPLAN Emergency Personnef Status List IP-2200