Entergy Indian Point 3 CONTROLLED DOCUMENT TRANSMITTAL FORM TO: DISTRIBUTION DATE 8/30/2002 TRANSMITTAL NO: 27202 FROM:IP3 DOCUMENT CONTROL GROUP EXTENSION: 2038 The Document(s) identified below are forwarded for use. In accordance with AP-18.2, please review to verify receipt, incorporate the document(s) into your controlled document file, properly disposition superseded, void, or inactive document(s). Sign and return the receipt acknowledgement below within fifteen'(15) working days.

AFFECTED DOCUMENT EMERGENCY PLAN PROCEDURES: UNIT 3 DOC # REV # TITLE INSTRUCTIONS

                        • SEE ATTACHED FOR INSTRUCTIONS *****************
  • PLEASE NOTE EFFECTIVE DATES**

ALL RECEIPT OF THE ABOVE LISTED DOCUMENT(S) IS HEREBY ACKNOWLEDGED. I CERTIFY THAT SUPERSEDED, VOID, OR INACTIVE COPIES OF THE ABOVE LISTED DOCUMENT(S) IN MY POSSESSION HAVE BEEN REMOVED FROM USE AND ALL UPDATES HAVE BEEN PERFORMED IN ACCORDANCE WITH EFFECTIVE DATE(S) (IF APPLICABLE) AS SHOWN ON THE DOCUMENT(S).

NAME (PRINT) SIGNATURE DATE CC#

Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.

Indian Point 3 NPP

"--Entergy-- PO. Box 308 Buchanan, NY 10511 Tel 914 736 8000 TO: NRC CONTROL COPY NO.:

FROM: EMERGENCY PLA1NING DATE: 8/30/02

SUBJECT:

Emergency Planning Procedures The enclosed revisions are for your controlled copy of the IP-3 Emergency Plan. Please discard to the IP-3 old sheets, insert new sheets, initial/date this transmittal and return it call Emergency DOCUMENTS DEPARTMENT. If you have any questions regarding these changes, Planning (x8404/x8318).

Thank you.

Volume II - Emergency Response Activation Implementing Procedures Old New Table of Contents Vol. II 8/02 Table of Contents Vol. II 8/30/02 Rev. 6 11/00 IP-2200 Rev.7 8/02 IP-2200 I acknowledge the receipt of these revisions to the IP-3 Emergency Plan.

(Signature) (Date)

Paqe: 1 29_-AUG-02 DISTRIBUTION CONTROL LIST Document Name: EMER PLAN CC-NAME NAME DEPT LOCATION 1 PLANT MANAGER'S OFFICE UNIT 3(UNIT 3/IPEC ONLY) 45-3-B TRAINING (ALL EP'S) #48 2 EP/TRAINING ADMINISTRATOR 45-4-A 3 RES DEPARTMENT MANAGER RES (UNIT 3/IPEC ONLY)

REC/TRN(UNT 3/IPEC ONLY) #48 4 REFERENCE LIBRARY EOF JOINT NEWS CENTER EMER PLN (ALL EP'S) 9 IP3 SHIFT MGR.(LUB-001-GEN) OPS (UNIT 3/IPEC ONLY) 10 IP3(ONLY) 11 CONTROL ROOM & MASTER OPS(3PT-D001/6(U3/IPEC)

E-PLAN (ALL EP'S) BOF 14 EOF WPO-12D E-PLAN (EOP'S ONLY) 16 AEOF/A.GROSJEAN(ALL EP'S) WPO/7A 19 NUC ENGINEERING LIBRARY DOC (UNIT 3/IPEC ONLY)

US NRC(UNIT 3/IPEC ONLY) 45-2-B 22 RESIDENT INSPECTOR OFFSITE MCNAMARA N NRC (ALL EP'S) 23 OFFSITE NRC (ALL EP'S) 24 MCNAMARA N OFFSITE NRC (ALL EP'S) 25 DOCUMENT CONTROL DESK OFFSITE 28 AVRAKOTOS N J A(UNIT 3/IPEC ONLY)

E-PLAN (ALL EP'S) EOF 29 E-PLAN STAFF EOF E-PLAN STAFF E-PLAN (ALL EP'S) 30 OFFSITE ST. EMERG. MGMT. OFFICE 31 BARANSKI J(VOLUME I ONLY) WESTCHESTR MURPHY L -(VOLUME I ONLY) DISASTER & EMERGENCY

  • 32 ROCKLAND EMERGENCY SERVICES 33 LONGO N (VOLUME I ONLY) ORANGE GREENE D (VOLUME I ONLY) DISASTER & CIVIL DEFENSE 34 PUTNAM 35 RAMPOLLA M(VOLUME I ONLY) OFFICE OF EMERG MANAGE TRAIN(UNIT 3/IPEC ONLY) 48-2-A 41 SIMULATOR TRL #2A QA (UNIT 3/IPEC) 107 QA MANAGER #48 C.STELLATO(NRQ-OPS TRN) NRQ (UNIT 3/IPEC ONLY) 319 #48 LRQ (UNIT 3/IPEC ONLY) 354 L.GRANT(LRQ-OPS/TRAIN) EOF E-PLAN (ALL EP'S) 376 E-PLAN STAFF #48 J.CHIUSANO(OPS INSTR) (UNIT 3/IPEC ONLY) 424 #48 LRQ (UNIT 3/IPEC ONLY) 510 L.GRANT(LRQ-OPS/TRAIN) #48 511 L.GRANT(LRQ-OPS/TRAIN) LRQ (UNIT 3/IPEC ONLY)

NRQ (UNIT 3/IPEC ONLY) #48 512 C.STELLATO(NRQ-OPS TRN) #48 NRQ (UNIT 3/IPEC ONLY) 513 C.STELLATO(NRQ-OPS TRN) IP2 PLANT MANAGER'S OFFICE ADMIN/(UNIT 2/IPEC ONLY) 517 IP2 518 TSC UNIT 2(UNIT 2/IPEC ONLY)

OPS (UNIT 2 & IPEC ONLY) IP2 520 CONTROL ROOM (UNIT 2) IP2 521 SIMULATOR TRAIN (UNIT 2/IPEC ONLY)

US NRC(UNIT 2/IPEC ONLY) IP2 522 NRC RESIDENT OFFSITE ROBERT VOGLE (UNIT 2) TRAIN/LIB (ALL EP'S) 523 IP2 NUC SAFETY/LIC(ALL EP'S) 524 JOHN MCCA*N (UNIT 2)

VOLUME II TABLE OF CONTENTS 08/30/02 ENTERGY NUCLEAR NORTHEAST INDIAN POINT NO. 3 NUCLEAR POWER PLANT EMERGENCY PLAN - VOLUME II EMERGENCY RESPONSE ACTIVATION TABLE OF CONTENTS REV. # / DATE 9 - 07/02 IC/EAL'S INITIATING CONDITIONS AND EMERGENCY ACTION LEVELS CONTROL ROOM IP-2000 Emergency Activation of the Control Room (CR) 4 09/98 16 08/02 IP-2001 Emergency Director (ED), Plant Operations Manager (POM), Shift Manager (SM) Procedure 3 02/99 IP-2002 CR Health Physics Technician 6 07/02 IP-2003 CR Watch Chemist 3 09/00 IP-2004 CR Clerk 2 06/01 IP-2005 CR Offsite Communicator 4 10/99 IP-2006 CR Direct-Line Communicator TECHNICAL SUPPORT CENTER (TSC)

IP-2100 Emergency Activation of the Technical Support 4 - 11/00 Center (TSC) 9 - 02/01 IP-2101 Technical Support Center (TSC) Manager 3 - 12/98 IP-2102 TSC Communicator(s) 4 - 08/99 IP-2103 TSC SPDS Computer Operator 2 - 06/01 IP-2104 TSC Video Operator VOID - N/A IP-2105 TSC Accountability Officer 5 - 06/99 IP-2106 TSC Clerk OPERATIONS SUPPORT CENTER (OSC) 7 - 8/02 IP-2200 Emergency Activation of the Operations Support Center (OSC)

IP-2201 Operations Support Center (OSC) Manager 9 08/02 2 12/98 IP-2202 OSC Direct-Line Communicator 3 07/02 IP-2203 OSC Dispatcher 3 06/02 IP-2204 OSC Team Leaders 8 10/99 IP-2205 OSC H.P. Team Leader VOID N/A IP-2206 OSC Accountability Officer 5 06/99 IP-2207 OSC Clerk 4 03/02 IP-2208 OSC Security Team Leader 4 12/97 IP-2209 OSC H.P. Technician 3 06/98 IP-2210 OSC Dosimetry Technician 2 03/00 IP-2211 OSC Chemistry Team Leader

EnterGy EMERGENCY PLAN PROCEDURES PROCEDURE NO. IP-2200 REV. 7 TITLE: EMERGENCY ACTIVATION OF THE OPERATIONS SUPPORT CENTER (OSC)

EMERGENCY ACTIVATION OF THE OPERATIONS SUPPORT CENTER (OSC)

THIS PROCEDURE IS TSR I THIS PROCEDURE IS NOT TSR 0]

WRITTEN BY: /4j,,A..

SIGNATURE/DATE

  • REVIEWED BY:QýEDT APPROVED BY ,;

TIGNATURE/DATE EFFECTIVE DATE:

PROCEDURE USE IS REFERENCE

VOIlUME Ii TABLE OF CONTENTS 08/30/02 ENTERGY NUCLEAR NORTHEAST INDIAN POINT NO. 3 NUCLEAR POWER PLANT EMERGENCY PLAN - VOLUME II EMERGENCY RESPONSE ACTIVATION It TABLE OF CONTENTS OPERATIONS. FACILITY (EOF) REV. # / bATE (VI'JCVN 5 - 11/00 IP-2300 Emergency Activation of the Emergency Operations Facility (EOF)

VOID - N/A IP-2301 Emergency Director Replaced byIP-EP-255 07/02 EOF Technical Advisor and Information Liaison 10 IP-2302 5 11/00 IP-2303 EOF Radiological Assessment Team Leader (RATL) 5 07/02 IP-2304 EOF Dose Assessment Health Physicist 4 03/00 IP-2305 EOF MIDAS Operator 7 12V98 IP-2306 EOF Security officer 5 10/99 IP-2307 EOF Clerk 4 03/00 IP-2308 EOF Direct-Line Communicator 4 09/00 IP-2309 EOF Offsite Communicator 4 08/02 IP-2310 EOF Onsite Radiological Communicator 4 06/99 IP-2311 EOF Offsite Radiological Communicator VOID N/A IP-2312 EOF Public Relations Liaison VOID N/A IP-2313 EOF Public Relations Technical Advisor VOID N/A IP-2314 EOF Radiological Assessment Monitor ALTERNATE EMERGENCY OPERATIONS FACILITY (AEOF)

VOID - N/A IP-2400 Emergency Activation of the Alternate Emergency Operations Facility (AEOF)

Replaced by IP-EP-251 SECURITY ACTIVATION 12 - 08/02 IP-2500 Security Emergency Activation Responsibilities RECOVERY/TERMINATION VOID - N/A IP-2600 Emergency Termination and Transition to Recovery Replaced by IP-EP-610 VOID - N/A IP-2601 Recovery Manager Replaced by IP-EP-610 VOID - N/A IP-2602 Development of a Recovery Action Plan Replaced by IP-EP-610 1 - 07/02 IP-2603 Recovery Support Group Manager EP-FORMS SECTION - Index 07/02 07/02 APPENDIX 'A' - ROSTER I 07/02 ROSTER II 06/02 ROSTER III 06/02 APPENDIX 'B' - Emergency Offsite Telephone List Telephone List 06/02 APPENDIX 'C' - Emergency Response Facility

VOLUME II IP-2200 Rev. 7 EMERGENCY ACTIVATION OF THE OPERATIONS SUPPORT CENTER (OSC)

TABLE OF CONTENTS SECTION TITLE PAGE 1.0 Purpose , 1 2.0 Responsibilities 1 3.0 References 1 4.0 Procedure 2 5.0 Attachments 5.1 OSC Setup 5.2 OSC Floorplan

VOLUME II IP-2200 Rev. 7 IP-2200 EMERGENCY ACTIVATION OF THE OPERATIONS SUPPORT CENTER (OSC) 1.0 PURPOSE 1.1 The purpose of this procedure is to provide instruction for setting up, and staffing the Operations Support Center (OSC). The goal of this procedure is to prepare the OSC to provide personnel of various disciplines, to accomplish a variety of emergency tasks. These tasks may be search and rescue, repair and corrective actions, special radiological monitoring forays, and/or equipment manipulation.

2.0 RESPONSIBILITIES 2.1 The OSC MANAGER is responsible for:

A. Ensuring that the OSC is made operational in accordance with this procedure; B. Ensuring that minimum staffing is attained, and; C. Declaring the OSC activated as soon as minimum staffing can assume its responsibilities.

2.2 The OSC Staff is responsible for the following:

A. Responding to the OSC, as required; B. Performing the mandatory accountability card-in upon entry; C. Setting up the OSC as per Attachment 5.1, "OSC Setup"; (the following technicians are not responsible for the set-up, but may assist as necessary: Maintenance, I&C, H.P., Waste Management and Dosimetry.

D. Assuming assigned positions and ensuring that support staff are available and properly briefed; and, E. Ensuring that relief personnel are fully briefed prior to assuming shift responsibilities.

3.0 REFERENCES

3.1 E-Plan Volume II, Series IP-2200 Procedures 3.2 EP-Form #10, "OSC Staffing Chart" 3.3 EP-Form #18, "OSC Emergency Briefing Form" 3.4 EP-Form #19, "NYPA Communications Message Form" IP-2200 Page 1 of 2

VOLUME II IP-2200 Rev. 7 4.0 PROCEDURE NOTE The steps in this procedure are not required to be performed in sequence.

INITIAL the blank, lines upon completion of the designated steps.

NOTE The OSC shall be staiffed at the ALERT, SITE AREA EMERGENCY, or GENERAL EMERGENCY classification levels, whichever comes first.

NOTE The Indian Point #3 OSC is located on the West Side of the Second Floor of the Administration Building, adjacent to the Turbine Building.

4.1 IF you are the first to arrive in the OSC, ASSUME responsibilities for setting up the OSC using Attachment 5.1, "OSC Setup".

4.2 SETUP the OSC in accordance with the instructions on Attachment 5.1, "OSC Setup". (Also see Attachment 5.2, "OSC Floorplan".)

5.0 ATTACHMENTS 5.1 OSC Setup 5.2 OSC Floorplan END OF TEXT IP-2200 Page 2 of 2

VOLUME II IP-2200 Rev.7 Page 1 of 1 ATTACHMENT 5.1 OSC SETUP DATE:

1. ENSURE availability of the Emergency Plan, Volumes I, II and III.
2. ENSURE availability of the book of EP-Forms.
3. DISTRIBUTE individual Position Books.
4. PLACE the position name plates and name tags on desks.

REFER to Attachment 5.2, "OSC Floorplan".

5. PLACE a supply of EP-Form #19, "NYPA Communications Message Form" near OSC Dispatcher and OSC Direct-Line Communicator.
6. HAVE EP-Form #10, "OSC Staffing Chart" available for sign-in.
7. DEACTIVATE voice mail on OSC Manager and OSC Team Leader phones by performing the following steps:
  • PICK-UP handset, PRESS 114, hang-up
  • PICK-UP handset, PRESS 116, hang-up
  • PICK-UP handset, PRESS 117, hang-up
8. SET-UP Direct Line Communicator headset and the Portable Page System. Ensure their operability.
9. SUPPLY the H.P. Team Leader with EP-Form #18.

"OSC Emergency Briefing Forms".

10. HANG the status boards.
11. Via the Operations Team Leader:

A. CHECK ventilation for operability.

B. PLACE R-41, R-42 and R-43 (OFF-CAL-H.V.OPER) switch to the OPER position at the TSC CP-42 Rad Monitor Panel.

NOTE A ENSURE these Rad monitor channels are RESTORED to the CAL position at-the end of all Drills/Events and acknowledge the Fail Alarm Annunciator.

12. SYNCHRONIZE ALL OSC clocks with the CONTROL ROOM Flight Panel clock.
13. Via the I&C Team Leader, CHECK volume & operability of the Public Address (P.A.) speaker.
14. NOTIFY the OSC Manager when OSC setup is complete.

IP-2200

VOLUME II iP-2200 Rev. 7 Page 1 of 1 ATTACHMENT 5.2 OSC FLOORPLAN Emergency Personnef Status List IP-2200