FENOC 5501 North State Route 2 FirstEnergy Nuclear Operating Company Oak Harbor, Ohio 43449 Lew W. Myers 419-321-7599 Chief Operating Officer Fax 419-321-7582 10 CFR 50.55a Docket Number 50-346 License Number NPF-3 Serial Number 2805 September 3, 2002 United States Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555-0001
Subject:
Withdrawal of 10 CFR 50.55a Request for Use of Alternative to ASME Code Requirements for the Davis-Besse Nuclear Power Station Third Ten-Year Interval Inservice Inspection Program (RR-A9; TAC No. MB 1607)
Ladies and Gentlemen:
By letter dated September 19, 2000 (Serial Number 2672), the FirstEnergy Nuclear Operating Company (FENOC) submitted the Third Ten-Year Interval Inservice Inspection (ISI) Program for the Davis-Besse Nuclear Power Station (DBNPS). Relief Request RR-A9, which was submitted as part of the ISI Program, proposed the use of ASME Code Case N-619, "Alternative Requirements for Nozzle Inner Radius Inspections for Class 1 Pressurizer and Steam Generator Nozzles."
Since the submittal of this request, the NRC staff has issued Draft Regulatory Guide DG-1 112, "ASME Code Cases Not Approved for Use," dated December 2001. The Draft Regulatory Guide states that Code Case N-619 is not acceptable to the NRC Staff because the study upon which it was based was not sufficiently broad to address all applicable plants and conditions. Additionally, the NRC Staff found the ultrasonic testing data inconclusive. Therefore, FENOC is withdrawing Relief Request RR-A9 from the NRC and will remove it from the Third Ten-Year Interval Inservice Inspection Program.
Docket Number 50-346 License Number NPF-3 Serial Number 2805 Page 2 Should you have any questions or require additional information, please contact Mr. Patrick J. McCloskey, Manager - Regulatory Affairs, at (419) 321-8450.
Very truly yours, Enclosure cc:
J. E. Dyer, Regional Administrator, NRC Region III J. B. Hopkins, NRC/NRR Senior Project Manager C. S. Thomas, NRC Region III, DB-1 Senior Resident Inspector Utility Radiological Safety Board
Docket Number 50-346 License Number NPF-3 Serial Number 2805 Enclosure COMMITMENT LIST THE FOLLOWING LIST IDENTIFIES THOSE ACTIONS COMMITTED TO BY THE DAVIS-BESSE NUCLEAR POWER STATION (DBNPS) IN THIS DOCUMENT.
ANY OTHER ACTIONS DISCUSSED IN THE SUBMITTAL REPRESENT INTENDED OR PLANNED ACTIONS BY THE DBNPS. THEY ARE DESCRIBED ONLY FOR INFORMATION AND ARE NOT REGULATORY COMMITMENTS.
PLEASE NOTIFY THE MANAGER - REGULATORY AFFAIRS (419-321-8450) AT THE DBNPS OF ANY QUESTIONS REGARDING THIS DOCUMENT OR ANY ASSOCIATED REGULATORY COMMITMENTS.
COMMITMENTS DUE DATE Remove Relief Request RR-A9 from the Third Prior to the Fourteenth Ten-Year Interval ISI Program.
Refueling Outage.