ML022490098
| ML022490098 | |
| Person / Time | |
|---|---|
| Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
| Issue date: | 08/15/2002 |
| From: | Gosekamp M Entergy Nuclear Vermont Yankee |
| To: | Conte R NRC/RGN-I/DRS/OSB |
| Conte R | |
| References | |
| 05000271/02-301 05000271/02-301 | |
| Download: ML022490098 (27) | |
Text
JPM-SRO Admin A.1.a Rev.0, 05/02 Page 1 of 5 VERMONT YANKEE JOB PERFORMANCE MEASURE WORKSHEET Task Identification:
Title:
Respo
Reference:
SO-2(
Task Number:
34472 Task Performance: AO/RO/SRO
- nd to NRC "Credible Threat Notification"
)01041R1-110801 704 RO/SRO SRO Only X
Sequence Critical:
Yes_ NoX Time Critical:
Yes NoX Individual Performing Task:
Examiner:
Date of Evaluation:
Activity Code:
Method of Testing: Simulation Performance X
Discuss_
Setting: Classroom Simulator X
Plant Performance Expected Completion Time:
10 minutes Evaluation Results:
Performance: PASS FAIL Time Required:
Prepared by:_
Reviewed by Approved by Operations Training Instructor l 0 Licensed/Certifi d Reviewer Oeain i
Operations Training ManagO 4-
/z o7 Date t/L740 _
Date Date
JPM-SRO Admin A. 1.a Rev.0, 05/02 Page 2 of 5 Directions:
Discuss the information given on this page with the operator being evaluated. Allow time for him to ask questions before beginning performance of the task. As each performance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsat". Comments are required for any "Unsat" classification. If a step is preceded by an asterisk (*), it is a critical step. If a critical step is skipped or performed unsatisfactorily, then the individual has failed the Job Performance Measure.
After providing the initiating cue, ask the individual "Do you understand the task?"
Read to the person being evaluated:
Before starting, I will explain the initial conditions, provide the initiating cues and answer any questions you have.
This JPM will be performed in the Simulator and you are to perform all actions.
You are requested to "talk-through" the procedure, stating the parameters you are verifying or checking and the steps you are performing.
Inform me upon completion of this task.
Initial Conditions:
You are the Shift Supervisor. The plant has just received a phone call from the NRC Headquarters Operations Center. They have issued a "Credible Threat" warning for Vermont Yankee. The call was received 5 minutes ago.
Initiating Cues:
You are to respond to the NRC notification of a site specific credible threat. You are to use extension 2151 for ALL phone calls.
Task Standards:
Notify Security of threat and classifies the event.
Required Materials:
SO-2001041Rl_1 10801 SS Log AP 3125, Emergency Plan Classification and Action Level Scheme AP 0156, Notification of Significant Events Simulator Setup:
Any IC
JPM-SRO Admin A. L.a Rev.0, 05/02 Page 3 of 5 Evaluation Performance Steps TIME START:
SAT/UNSAT SteD 1:
Obtain Standing Order Standard:
Obtains Standing Order SO-2001041RI_1 10801 Note: Monitor examinee's use of phone to insure he only dials 2151 as per initiating cue.
SAT/UNSAT Anton 7-('fnfirmn Thriat S~~t~~iV.
a.\\V IX 1
1 Waet Standard:
Utilizing AP 0156, Appendix D, Step 1, calls the NRC to verify threat.
Interim Cue: As the NRC, state your name and confirm the threat notification was made to Vermont Yankee 5 minutes ago (provide an actual time).
SAT/UNSAT Step 3:
Obtain Information Standard:
Obtains information regarding the type and time of expected threat.
Interim Cue: The threat is a suspected car bomb. The threat is expected to occur anytime in the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. If asked, you do not wish to maintain an open line.
SAT/UNSAT
- Step 4:
Notify Security Shift Supervisor (SSS)
Standard:
Notify Security Shift Supervisor that an NRC site specific "Credible Threat" has been received.
Interim Cue: As the SSS, acknowledge communication.
SAT/UNSAT Sten 5:
Make Log Entries Standard:
In the SS log, enters: NRC contacts name, time of initial notification and verification of threat. Does NOT log the specific nature of threat.
JPM-SRO Admin A.1.a Rev.0, 05/02 Page 4 of 5 SAT/UNSAT
- Step 6:
Standard:
Make E-Plan Classification Classifies event as an Unusual Event (U-9-a)
Interim Cue: For the purposes of this JPM, you have completed your task.
- Critical Step TIME FINISH:
Terminating Cue:
SSS has been notified and the event has been classified.
Evaluator Comments:
System Specific K/A's:
System Generic K/A's:
N/A 2.1.15 (2.3/3.0)
JPM-SRO Admin A.1.a Rev.0, 05/02 Page 5 of 5 EXAMINEE HANDOUT Initial Conditions:
You are the Shift Supervisor. The plant has just received a phone call from the NRC Headquarters Operations Center. They have issued a "Credible Threat" warning for Vermont Yankee. The call was received 5 minutes ago.
Initiating Cues:
You are to respond to the NRC notification of a site specific credible threat. You are to use extension 2151 for ALL phone calls.
JPM-SRO Admin A. 1.b Rev.0, 05/02 Page 1 of 4 VERMONT YANKEE JOB PERFORMANCE MEASURE WORKSHEET Task Identification:
Title:
Reference:
Task Number:
Task Performance: AO/R(
Determine if Fuel Handling Can Continue with Inoperable SRMs Technical Specifications 34103203
)/SRO RO/SRO SRO Only_
Sequence Critical:
Yes No X No X Time Critical:
Yes Individual Performing Task:
Examiner:
Date of Evaluation:
Activity Code:-
Method of Testing: Simulation Performance X Discuss -
Setting: Classroom Simulator X
Plant Performance Expected Completion Time:
10 minutes Evaluation Results:
Performance: PASS _
FAIL Time Required:
Prepared by:_
Reviewed by:.
Approved by:.
Operations Training Instructor bibo z-Date Date Date 10-~
aini a g e
JPM-SRO Admin A. l.b Rev.0, 05/02 Page 2 of 4 Directions:
Discuss the information given on this page with the operator being evaluated. Allow time for him to ask questions before beginning performance of the task. As each performance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsat". Comments are required for any "Unsat" classification. If a step is preceded by an asterisk (*), it is a critical step. If a critical step is skipped or performed unsatisfactorily, then the individual has failed the Job Performance Measure.
After providing the initiating cue, ask the individual "Do you understand the task?"
Read to the person being evaluated:
Before starting, I will explain the initial conditions, provide the initiating cues and answer any questions you have.
You are to perform all actions.
You are requested to "talk-through" the procedure, stating the parameters you are verifying or checking and the steps you are performing.
Inform me upon completion of this task.
Initial Conditions:
You are the SS in a refueling outage. All control rods are operable and inserted. The next planned fuel move is to remove the 4 fuel bundles around control rod 30-3 1. The daily surveillance of the SRMs is underway per OP 4102. SRM D and C have been declared inoperable. All other SRMs are operable.
Initiating Cues:
You are to determine if the bundles around rod 30-31 can be moved with the SRMs C and D inoperable.
Task Standards:
Determines fuel movement may continue Required Materials:
OP 2130, Source Range Monitoring System OP 4102, Refuel Outage/Fuel Movement Periodic Tests Technical Specifications Simulator Setup:
If simulator used, any refueling IC
JPM-SRO Admin A. 1.b Rev.0, 05/02 Page 3 of 4 Evaluation SAT/UNSAT SAT/UNSAT Performance Steps TIME START:
Step 1:Determine quadrant locations Standard:
Utilizing OP 4102, Figure 1, or OP 2130 Figure 1, or Full Core Display determines bundles for rod 30-031 are in the "A" SRM quadrant.
- Step 2:
Determine Tech Spec requirements Standard:
Utilizing Tech Specs Section 3.12.B determines fuel moves can continue.
- Critical Step TIME FINISH:
Determination made that fuel movement can continue.
Terminating Cue:
Evaluator Comments:
System Specific K/A's:
System Generic K/A's:
N/A 2.1.9 (2.5/4.0)
JPM-SRO Admin A. 1.b Rev.0, 05/02 Page 4 of 4 EXAMINEE HANDOUT Initial Conditions:
You are the SS in a refueling outage. All control rods are operable and inserted. The next planned fuel move is to remove the 4 fuel bundles around control rod 30-31. The daily surveillance of the SRMs is underway per OP 4102. SRM C and D have been declared inoperable. All other SRMs are operable.
Initiating Cues:
You are to determine if the bundles around rod 30-31 can be moved with the SRMs C and D inoperable.
JPM-SRO Admin A.2 Rev.1, 05/02 Page 1 of 5 VERMONT YANKEE JOB PERFORMANCE MEASURE WORKSHEET Task Identification:
Title:
Review Completed Surveillance and Take Action for Out of Spec Data
Reference:
OP 4124, Residual Heat Removal System Surveillance Procedure Task Number:
3420260302/03 Task Performance: AO/RO/SRO _
RO/SRO Only X SE Only Sequence Critical:
Yes No X Time Critical:
Yes No X Individual Performing Task:
Examiner:
Date of Evaluation:
Activity Code:
Method of Testing: Simulation Performance X Discuss Setting: Classroom X Simulator X Plant X Performance Expected Completion Time:
10 minutes Evaluation Results:
Performance: PASS _
FAIL Time Required:
Prepared by:
Operations Trfining Instructor Date Reviewed by:
S Licensed/Certifi d Reviewer Date Approved by:.
Operations raining Man ger Date
JPM-SRO Admin A.2 Rev. 1, 05/02 Page 2 of 5 Directions:
Discuss the information given on this page with the operator being evaluated. Allow time for him to ask questions before beginning performance of the task. As each performance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsat". Comments are required for any "Unsat" classification. If a step is preceded by an asterisk (*), it is a critical step. If a critical step is skipped or performed unsatisfactorily, then the individual has failed the Job Performance Measure.
After providing the initiating cue, ask the individual "Do you understand the task?"
Read to the person bein2 evaluated:
Before starting, I will explain the initial conditions, provide the initiating cues and answer any questions you have.
You are to perform all actions.
You are requested to "talk-through" the procedure, stating the parameters you are verifying or checking and the steps you are performing.
Inform me upon completion of this task.
Initial Conditions:
You are the Shift Supervisor. The plant is at 100% power. All equipment is operable.
Initiating Cues:
Review the provided surveillance data as Shift Supervisor.
Task Standards:
Out of Spec opening time for RHR-27A valve noted on surveillance; 7-day LCO identified per TS 3/5/A/4/b Required Materials:
OP 4124, Residual Heat Removal System Surveillance Procedure (latest revision)
VYOPF 4124.01, RHR Valve Operability Test (latest revision) filled in with an Out of Spec opening time for RHR-27A VY Technical Specifications Simulator Setup:
N/A
JPM-SRO Admin A.2 Rev. 1, 05/02 Page 3 of 5 Evaluation SAT/UNSAT Performance Steps TIME START:
Step 1:Obtain completed surveillance data from OP 4124 Standard:
VYOPF 4124.01 obtained Interim Cue: Provide completed VYOPF 4124.01 for RHR Loop "A" SATIUNSAT SAT/UNSAT SAT/UNSAT
- Step 2:
Review data Standard:
Identifies RHR-27A opening time Out of Spec Step 3:Review Acceptance Criteria Standard:
Determines RHR-27A opening time fails Acceptance Criteria 2
- Step 4:
Declares RHR-27A inoperable Standard:
Determines 7 day LCO in effect per TS 3.5.A.4.b
- Critical Step
JPM-SRO Admin A.2 Rev. 1, 05/02 Page 4 of 5 TIME FINISH:
Terminating Cue:
Valve opening time identified as Out of Spec and correct LCO entered Evaluator Comments:
System Specific K/A's:
System Generic K/A's:
N/A 2.2.12 (3.0/3.4)
JPM-SRO Admin A.2 Rev.1, 05/02 Page 5 of 5 EXAMINEE HANDOUT Initial Conditions:
You are the Shift Supervisor. The plant is at 100% power. All equipment is operable.
Initiating Cues:
Review the provided surveillance data and sign as Shift Supervisor.
V/
RHR LOOP 'A' VALVE OPERABILITY TEST s
1, Frequency.
Quarterly_
St opw 1Catce:_7__
Other-Specify_______________WO#
C2.-
C)~(M Cal. Due Date:
7i3 Test Valve Closes Fully IST Normal
[ST Acceptance Results A
NA CornSonent Position Test Method Guidelines IST Ref. Value Criteria (i
SAT UNSAT Bleed pressure off the upstream face of RHR-46A via RHR-100A, then verify that pressure N/A S10 psig RHR-46A C
as indicated on PI-10-100A is <100 psig three minutes after re-closing RHR-100A.
r0p Valve Actuation Time sec)
Results of SE IST IST Ref. Value IST Acce tble Ranga Test Value IST Evaluation Valve Test Norm.
0 en inClose a ls Number Reg.
Pos.
Test Method Guidelines Open Close Mi Max Mi Max 0 en Close ACC RA Place RHR-89A TEST switch in TEST and RHR-192A closed. When RHR-89A X
C test complete, place RHR-89A TEST switch in AUTO and RHR-192A 56.00 54.00 47.60 64.40 45.90 62.10 571Z° 1 7tZ-7 open.
o RHR-25A X
0 Ensure that RHR-27A is CLOSED before OPENING RHR-25A 19.00 16.15 21.85
>8 47
.h =
RffHR -27A X
C Ensure that RHR-25A is CLOSED before OPENING RHR-27A 43.26 42.63 36.78 46.00 36.24 49.02
- 38. 1 I1 RHR-260 X
C Verifynosamping gress. RHR1 160 and RHR-61 are operated
.M6 1.00 2.00 N r 3S.
RIH-R 161 X
~C by the same switch at the RB3 samn le sink
.~~'~
RHR-34A X
C Ensure that RHR-39A is CLOSED prior to OPENING RHR-34A 37.00 38.00 31.45 42.55 32.30 43.70 4.31 39.1 RHR-38A X
C Ensure RHR-34A stroked open to depressurize and drain pipe then 15.00 16.00 12.75 17.25 13.60 18.40 I iD.(.
closed, and ensure RHR-39Ais CLOSED niortoop eningRR3A RHR-39A X
C Ensure RHR-34A and R
-3 aclosed nror to openin RHR-39A 58.00 57.00 49.30 66.70 48.45 65.55
-(-.lb C.j'- 3r-Ensure that RHR-26A is CLOSED, open RHR-50A52A to RHR-31A X
C depressurize piping, then close & lock RHR-50A52A before opening 60.00 59.00 51.00 69.00 50.15 67.85 RHR-31A.
,7z
/
RHR-26A X
C Ensure thatRHR-31A Is CLOSED before OPENING RHR-26A, 57.00 56.00 48.45 265 55 47.0 64.40
_(.Z.
(_
RHR-16A X
0 Ensure RHR-15A/C CLOSED 23.00 22.00 19.55 26.45 18.70
- 25. 30 l'.1 RR-65A X
0 N/A 5 3.98 53.6-2 4.9 62.0 45.58 61.66 52.MB.80 RHR-13A X
0 Ensure RHR-15A is CLOSED before oenin thevalve 97.00 95.00 82.45 100.00 80.75 100.00 11.o0 fs-RI_
Ensure RHR-1 3A is CLOSED before cycling the valve. After cycling RHR-15A X
C RHR-15A and 15C, open/verify open RHR-16Ato place system in 96.00 95.00 81.60 110.40 80.75 109.25 LC,?4A L
normal line-up Ensure RHR-15C Is CLOSED before opening the valve. Afer cycling RHR-13C X
0 RHR-15A and 15C, open/verify open RHR-16A to place system in 93.00 93.00 79.05 100.00 79.05 100.00
'te.o' 9 1.o
/
normal line-up Ensure RHR-13C is CLOSED before cycling the valve. Afer cycling RHR-15C X
C RHR-15A and 15C, open/verify open RHR-16Ato place system In 95.00 94.00 80.75 109.25 79.90 108.10 f
AS:3
/
normal line-up.181 RHR-66 X
C Ensure that RHR-57 is CLOSED before OPENING RHR 5,
22.00 M
RHR-57. X C
Ensure that RHR-66 is CLOSED before OPENING RHR-57.
1.01.5 2.5
'~
I1(7 Note:
The Operations Administrative Assistant is required to forward a copy of this completed form to the System Engineering Records Clerk.
VYOPF 4124.01A OP 4124 Rev. 54 Page 1 of 2
RHR LOOP 'A' VALVE OPERABILITY TEST (Continued)
Acceptance Criteria:
- 1.
Each valve operated through a complete stroke.
- 2.
Valves operated within specified times.
- 3.
RHR-78A locked closed, and RHR-79A and 100A closed. When primary containment is required, a dedicated operator shall remain in the immediate vicinity of the valve controls with Immediately available communications established with the Control Room until RHR-78A is closed. (NVY99004 02)
- 4.
No back leakage observed on RHR-46A. ([ST Rqmt.)
4 NOTE:
Testing RHR-160 in the CLOSED direction verifies proper operation upon loss of actuation air. The fail safe testing requirements of the VY IST program are therefore satisfied.
REMARKS:
/J, 41 RHR Loop 'A' filled and vented per VYOPF 4124.13A by:
VLA.
\\-j I
O60 Test Completed by:
Valves in NORMAL position independently verified by:_
IST Data evaluated by:_
A rol Go
- a.
I U
-g ShLoft Engineer Shift Engineer Remote Time
, 9 e
Oz ate ate Date Reviewed by vate Shift Supervisor Date Note:
The Operations Administrative Assistant is required to forward a copy of this completed form to the System Engineering Records Clerk.
VYOPF 4124.01A OP 4124 Rev. 54 Page 2 of 2
JPM-SRO Admin A.3 Rev.0, 05/02 Page 1 of 6 VERMONT YANKEE JOB PERFORMANCE MEASURE WORKSHEET Task Identification:
Title:
Locate and Determine Radiological Conditions for Inspection of Valve
Reference:
OP 4530. Dose Rate Radiation Surveys Task Number:
508016 Task Performance: AO/RO/SRO _
RO/SRO Only X SE Only_
Sequence Critical:
Yes No X Time Critical:
Yes No X Individual Performing Task:
Examiner:
Date of Evaluation:
Activity Code:
Method of Testing: Simulation X
Performance Discuss _
Setting: Classroom _
Simulator Plant X Performance Expected Completion Time:
10 minutes Evaluation Results:
Performance: PASS FAIL Time Required:
Prepared by:
Operations Tiring Instructor ate Reviewed by:
/
._ 0
§ icensed/Certified Reviewer Date Approved by:
Operatio s Training Mtager Date
JPM-SRO Admin A.3 Rev.0, 05/02 Page 2 of 6 Directions:
Discuss the information given on this page with the operator being evaluated. Allow time for him to ask questions before beginning performance of the task. As each performance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsat". Comments are required for any "Unsat" classification. If a step is preceded by an asterisk (*), it is a critical step. If a critical step is skipped or performed unsatisfactorily, then the individual has failed the Job Performance Measure.
After providing the initiating cue, ask the individual "Do you understand the task?"
Read to the person being evaluated:
Before starting, I will explain the initial conditions, provide the initiating cues and answer any questions you have.
This JPM will be performed in the Plant and you are to simulate the actions.
You are requested to "talk-through" the procedure, stating the parameters you are verifying or checking and the steps you are performing.
Inform me upon completion of this task.
Initial Conditions:
- The previous shift prepared the "A" RCU Pump for startup in preparation for swapping operating pumps per OP 2112, Section B
- Abnormal indications were observed during the initial start attempt of RCU Pump "A"
Initiatin2 Cues:
Utilizing plant reference materials and posted surveys, you are to determine:
- The locations of CU-29A
- The general area where the AO should position himself in the room when not performing valve manipulations Task Standards:
The valve is located in the "A" RWCU Pump room with the area around the Step Off Pad having the lowest dose rate.
Required Materials:
- OP 2112, Reactor Water Cleanup System (latest revision)
- RWCU "A" Pump Room Survey Map OP 4530, Dose Rate Radiation Surveys (latest revision)
JPM-SRO Admin A.3 Rev.0, 05/02 Page 3 of 6 Simulator Setup:
N/A
JPM-SRO Admin A.3 Rev.0, 05/02 Page 4 of 6 Evaluation SAT/UNSAT Performance Steps TIME START:
- Step 1:
Determine location of valve Standard:
Determines CU-29A is located in RCU Pump A room Note: OP 2112 (Section A), EMPAC database, Isometric prints or other plant reference material may be used to determine location.
SAT/UNSAT
- Step 2:
Locate Survey Map Standard:
Locate the "A" RCU pump room survey map in the RCA exit area Interim Cue: When survey map is located, provide the attached survey map. Inform examinee this is the latest survey map for the room.
SAT/UNSAT
- Step 3:
Standard:
Determine Low Dose Area Utilizing survey map, determines the area near the Step Off Pad (SOP) has the lowest dose (30mr/hr)
- Critical Step
JPM-SRO Admin A.3 Rev.0, 05/02 Page 5 of 6 TIME FINISH:
Terminating Cue:
Valve located in the "A" RWCU Pump room with the SOP area having the lowest dose rate.
Evaluator Comments:
System Specific K/A's:
System Generic K/A's:
N/A 2.3.10 (2.9/3.3)
JPM-SRO Admin A.3 Rev.0, 05/02 Page 6 of 6 EXAMINEE HANDOUT Initial Conditions:
- The previous shift prepared the "A" RCU Pump for startup in preparation for swapping operating pumps per OP 2112, Section B
- Abnormal indications were observed during the initial start attempt of RCU Pump "A"
Initiating Cues:
Utilizing plant reference materials and posted surveys, you are to determine:
- The locations of CU-29A
- The general area where the AO should position himself in the room when not performing valve manipulations
Survey Logbook# 5°Z..
3 ss7 Survey Log ID: RB 280 E RWCU A Pump Room Room DATE: 3 -J-oz I TIME: tqlo Power level:
I I
y, RWP: oR2-
- cooo, I1-o instrument(s)
Serial number Cal due date L-l 0&S1 02-o L -10 l t q~AqP3a ry /)
tv /A _
A A_
Contamination Data
- 1.
OPM/IOOCM 2 unless otherwise noted
- 2.
LAS in. CCPM Smear Smear Results Results I,
-- 13.
h1
- 2.
Lfj $
14.
- 4.
l 16.
- s.
S K
- 17.
- 6.
X 18.
- 7.
ZQOooo (LI95) 19.
- 8.
1..oo
- 20.
- 9.
21.
- 10.
22.
- 11.
23.
- 12.
24.
Alpha Smears Results Results 4 h N14 Air sample results N /A mRlhr O Routine Job Coverage O Pre-Job Q System Breach O Pre-decon O Post decon O Other (note type)
Surveyor(s):
Print Name: M
- c14-t axt 4P Signature
u Remarks:
IbWhM Vt-At,5
'Vb4Tis 1, Reviewed by:
._t
JPM-SRO Admin A.4 Rev.1, 05/02 Page 1 of 4 VERMONT YANKEE JOB PERFORMANCE MEASURE WORKSHEET Task Identification:
Title:
Reference:
Task Number:
Task Performance: AO/R(
Classify Event Based Upon Simulated Plant Conditions AP 3125, Emergency Plan Classification and Action Level Scheme 3440190302/03
)/SRO RO/SRO SRO Only Sequence Critical:
Yes No X Time Critical:
Yes No X Individual Performing Task:
Examiner:
Date of Evaluation:
Activity Code:
Method of Testing: Simulation Performance X
Discuss -
Setting: Classroom Simulator X
Plant Performance Expected Completion Time:
5 minutes Evaluation Results:
Performance: PASS _ FAIL Time Required:
Prepared by:
pe
//;in n
OperatioRtffrainin~g Instructor Date Date 4
~, ~,1 Date
JPM-SRO Admin A.4 Rev.1, 05/02 Page 2 of 4 Directions:
Discuss the information given on this page with the operator being evaluated. Allow time for him to ask questions before beginning performance of the task. As each performance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsat". Comments are required for any "Unsat" classification. If a step is preceded by an asterisk (*), it is a critical step. If a critical step is skipped or performed unsatisfactorily, then the individual has failed the Job Performance Measure.
After providing the initiating cue, ask the individual "Do you understand the task?"
Read to the person bein2 evaluated:
Before starting, I will explain the initial conditions, provide the initiating cues and answer any questions you have.
This JPM will be performed in the Simulator and you are to perform all actions.
You are requested to "talk-through" the procedure, stating the parameters you are verifying or checking and the steps you are performing.
Inform me upon completion of this task.
Initial Conditions:
Simulated plant conditions following scenario with simulator in FREEZE.
Initiating Cues:
The Shift Supervisor has asked you to classify the event.
Task Standards:
The candidate correctly applies emergency classification guidelines for simulated plant conditions.
Required Materials:
AP 3125, Emergency Plan Classification and Action Level Scheme (Appendix A) (latest revision)
Simulator Setup:
Place the simulator in FREEZE after running the Initial NRC Exam (scheduled for the week of Aug 12, 2002)
JPM-SRO Admin A.4 Rev.1, 05/02 Page 3 of 4 Evaluation SAT/UNSAT SAT/UNSAT Performance Steps TIME START:
Step 1:
Review plant conditions Standard:
Applicant reviews annunciators and control room indication
- Step 2:
Classify Event Standard:
Using AP 3125, Appendix A, applicant declares an Alert based upon A-3-a or A-3-b
- Critical Step TIME FINISH:
Event classification complete.
Terminating Cue:
Evaluator Comments:
System Specific K/A's:
System Generic K/A's:
N/A 2.4.41 (2.3/4.1)
JPM-SRO Admin A.4 Rev.1, 05/02 Page 4 of 4 EXAMINEE HANDOUT Initial Conditions:
Simulated plant conditions following scenario with simulator in FREEZE.
Initiating Cues:
The Shift Supervisor has asked you to classify the event.