License Change Request S02-03 from Salem Generating Station Units 1 & 2
ML022480263
Person / Time
Site: Salem  PSEG icon.png
Issue date: 08/22/2002
From: Tosch K
State of NJ, Dept of Environmental Protection
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML022480263 (4)


Text

James E. McGreevey Governor Sa of N6 es Department of Environmental Protection Division of Environmental Safety, Health, Analytical Programs Radiation Protection Programs Bureau of Nuclear Engineering PO Box 415 Trenton, NJ 08625-0415 August 22, 2002 Bradley M. Campbell Commissioner 7

/

U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 To Whom It May Concern:

Subject:

Salem Generating Station Units -1 and 2 Docket No. 50-272/50-311 Amendment to Facility Operating License License Change Request S02-03 The subject request was submitted to the NRC by PSE&G letter dated June 28, 2002. The request proposes to revise the requirements for Fuel Decay Time prior to commencing movement of radiated fuel. Technical Specification 3/4.9.3 is to be revised to allow 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> of decay time between October 15 and May 15, but is remain at 168 hours0.00194 days <br />0.0467 hours <br />2.777778e-4 weeks <br />6.3924e-5 months <br /> between May 16 and October 14, until the end of the year 2010.

The New Jersey Department of Environmental Protection's Bureau of Nuclear Engineering ha's reviewed the request in accordance with the requirements of 10 CFR 50.91 (b) and has no comments.

If you have any questions, please contact Rich Pinney at (609) 984-7558.

Sincerely, Kent W. Tosch, Manager Bureau of Nuclear Engineering New Jersey is an Equal Opportunity Employer Recycled Paper

C:

Distribution Jill Lipoti N.J. DEP D. Zannoni N.J. DEP R. Bores NRC Region I State Liaison Officer R. Lorsen NRC Sr. Resident Inspector R. Fretz NRC Sr.Project Manager G. Salaman PSE&G N

A-

Department of Environmental Protection Division of Environmental Safety, Health, and Analytical Programs Bureau of Nuclear Engineering P.O.Box - 415 Trenton, NJ 08625-0415 August 22, 2002 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Bradley M. Campbell Commissioner

-ii

/

Gentlemen:

Subject:

Hope Creek Generating Station Docket No. 50-354 Amendment to Facility Operating License License Change Request H02-07 The subject request was submitted to the NRC by PSE&G letter dated July 03, 2002. The request proposes to relocate the contents of Technical Specification Surveillance Requirement 4.7.5.e, Functional Tests, Snubbers. The utility is requesting expanding the testing interval of select snubbers from 18 months to 54 months. This type of snubber has been in service at Hope Creek since 1997. The testing interval reduction request is based on their functional failure history.

The New Jersey Department of Environmental Protection's Bureau of Nuclear Engineering has reviewed the request in accordance with the requirements of 10CFR50.91 (b). The State of New

\\Jersey has no comment.

"If you have any questions, please contact Rich Pinney at (609) 984-7558.

Sincerely, Tosch, Manager Bureau of Nuclear Engineering New Jersey is an Equal Opportunity Employer Recycled Paper James E. McGreevey Governor

c:

Distribution J. Lipoti N.J. DEP D. Zannoni N.J. DEP R. Bores NRC Region I State Liaison Officer J. Shoppy NRC Sr. Resident Inspector G. Wunder NRC Project Manager G. Salamon PSE&G 7