|
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML24283A1442024-10-16016 October 2024 Main Steam Line Break Accident Analysis LAR Pre-Application Meeting ML24247A0042024-09-0303 September 2024 SLR Efficiencies Public Meeting - NRC Presentation - September 5, 2024 ML24183A2082024-07-11011 July 2024 Presubmittal Presentation: TS 3.7, 3.14 Change for Extended AOT During Outage and SW Piping Maintenance, Cfrp SW Application - Slides ML24108A0712024-04-30030 April 2024 Combined - 2023 Annual Assessment Public Meeting Slides ML24029A2362024-01-30030 January 2024 Preliminary Results of the Environmental Review, Subsequent License Renewal ML23338A1522023-12-0707 December 2023 Public Meeting Slides for North Anna and Surry Emergency Plan Augmentation Times License Amendment Request ML23255A0992023-09-15015 September 2023 Slides for September 15, 2023 Public Meeting on Poanhi Seismic Evaluations ML23103A3482023-04-14014 April 2023 Annual Assessment Meeting Presentation for North Anna and Surry ML21221A0332022-06-17017 June 2022 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - NRC Slides ML22097A2262022-04-13013 April 2022 Presubmittal Presentation April 13, 2022 One-time TS Change of AOT for Unit 2 AFW Piping Replacement ML22055B1132022-03-0202 March 2022 Technical Support Center (TSC) Relocation Proposed License Amendment Request - NRC Pre-Submittal Meeting, March 2, 2022 ML21174A3042021-06-23023 June 2021 SLRA RAI Response Public Meeting - 21-06-24 ML21221A1542021-05-27027 May 2021 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Dominion Slides ML21134A1632021-05-20020 May 2021 Resolution of Tornado Wind Nonconformances Proposed License Amendment Request NRC Pre-Submittal Meeting - May 20, 2021 ML21127A1362021-05-13013 May 2021 May 13, 2021 NRC Pre-Submittal Meeting - Surry Power Station New Fuel Storage and Spent Fuel Pool Criticality Analysis Proposed License Amendment Request ML21132A2892021-05-13013 May 2021 SLRA RAI Response Public Meeting ML21145A2172021-05-13013 May 2021 Discussion on May 13, 2021 with Dominion on Select Staff RAIs on North Anna Subsequent License Renewal Application - Dominion Slides ML21034A5972021-02-10010 February 2021 External Presentation Am Atkinson_Nrc ISG-06 Meeting Dominion Digital IC Project 02102021 ML20307A1772020-11-0404 November 2020 NRC Presentation North Anna Power Station, Units 1 and 2 Subsequent License Renewal Review ML20309A5912020-10-14014 October 2020 Pre-Submittal Meeting for License Amendment Requests to Implement Batch Framatome 15 X 15 AGORA-5A-I (Agora) Fuel at Surry Power Station Units 1 and 2 (SPS) - Slides ML20288A3472020-10-14014 October 2020 (COVID-19) Emergency Preparedness Exemption Pre-Application Meeting ML20099F2992020-04-0909 April 2020 NRC Slides for North Anna pre-app April 9 ML20099F2412020-04-0909 April 2020 Co., NRC Safety Pre& 8208;Application Meeting North Anna Power Station (NAPS) ML20098B7292020-04-0707 April 2020 Sur 2019 Annual Assessment Meeting Presentation ML20098B6022020-04-0707 April 2020 Annual Assessment Meeting Presentation ML19297D1872019-11-18018 November 2019 Pre-Application Meeting - Dominion Slides ML19311C5292019-11-0707 November 2019 Dsies Slides for Nov. 7, 2019 Public Meeting ML19007A2162019-01-0808 January 2019 Subsequent License Renewal Environmental Scoping Meeting, Surry Power Station, Unit Nos. 1 and 2, January 8, 2018 ML18320A2502018-11-20020 November 2018 50.90 License Amendment Request - Dominion Fleet EAL Scheme Changes, November 20, 2018 Public Meeting ML18141A3072018-05-21021 May 2018 18 - SLR Status ML18032A5842018-02-0707 February 2018 SLR Pre-Application 02/07/2018 Meeting - Dominion Energy Slides ML17320A2012017-11-15015 November 2017 Modeling FLEX in Surry Power Station Internal Events and Flooding PRA ML17123A2092017-05-0303 May 2017 Summary of Meeting to Discuss Annual Assessment of the North Anna Power Station, Units 1 and 2 with the Public for the Period of January 1, 2016 Through December 31, 2016 ML16320A5232016-09-0707 September 2016 Pre-Submittal Meeting with Surry Power Station Regarding Carbon Fiber Reinforced Polymer Alternative Request ML16124A7592016-05-0303 May 2016 April 12, 2016 Summary of Public Meeting - Surry, Units 1 and 2 ML16124A7582016-05-0303 May 2016 April 14, 2016, Summer of Public Meeting - North Anna, Units 1 and 2 ML16124A7632016-05-0303 May 2016 April 14, 2016, Summary of Public Meeting - North Anna Power Station, Units 1 and 2 ML16104A3822016-04-26026 April 2016 New Fuel Storage Rack & SFP Criticality Analysis for April 26th 2016 Scheduled Category 1, Pre-Submittal Public Teleconference ML16104A3872016-04-13013 April 2016 Criticality Analysis Checklist for North Anna ML15273A4292015-09-29029 September 2015 Revised Slides for September 29, 2015 Meeting with Dominion Re North Anna ISFSI License Renewal ML15153A0452015-05-13013 May 2015 Revised North Anna ISFSI Presentation Slides - TN-32 High Burnup Dry Storage Research Project, May 13, 2015 (Tom Brookmire) ML15133A0822015-05-13013 May 2015 ISFSI Presentation Slides - TN-32 High Burnup Dry Storage Research Project, May 13, 2015 (Tom Brookmire) ML15128A5462015-05-0808 May 2015 Summary of Public Meeting with North Anna, Units 1 and 2 to Discuss the Annual Assessment with the Public ML14176A0922014-06-25025 June 2014 6/25/2014, Dominion Public Meeting Presentation for Surry GMRS Profile ML14101A1132014-04-11011 April 2014 Summary of Meeting with Public to Discuss Annual Assessment of Surry Power Station with the Public for the Period of January 1, 2013 - December 31, 2013 ML14101A1202014-04-11011 April 2014 Public Meeting Summary - North Anna Power Station, Docket Nos. 50-338, 50-339 ML14058B1762014-03-0606 March 2014 Presentation Slides - North Anna ISFSI - High Burnup Dry Storage Confirmatory Data Project, TN-32 Storage Cask, Tom Brookmire, March 6, 2014, Docket No. 72-16, TAC No: L24886 ML14071A1672014-01-28028 January 2014 Enclosure 2: Presentation Slides - North Anna ISFSI TN-32 Cask and Pad 1 Assessments Following August 23, 2011, Central Virginia Earthquake ML13159A0092013-06-0404 June 2013 Notable Failures in Nondustructive Testing - June 4, 2013 Public Meeting ML13151A1022013-05-31031 May 2013 Summary of Public Meeting with Virginia Electric and Power Company, to Discuss Annual Assessment of Surry Power Stationfor the Period of January 1, 2012 December 31, 2012 2024-09-03
[Table view] |
Text
Flow Accelerated Corrosion Predictive Analysis Methoddlogy CHECWORKS Allowable Actual Values Parameter Input Steam rate Velosity Steam quality Op. Temperature CONCLUSION: All values within parameters Enclosure I
Flow Accelerated Corrosion Predictive Analysis Methodology FAC affects carbon steel components in steam cycle where process temperature exceeds 2000 F North Anna and Surry use standardized programs to predict, detect, and monitor for FAC based on EPRI Guidlines EPRI CHECWORKS code is used to evaluate changes
- Conditions are bounded by CHECWORKS parameter ranges
Flow Accelerated Corrosion Programatic Controls
- FAC wear rates based on predictive analysis and actual inspection results:
- Largest wear rate is ??? mils/year
- Largest wear rate found in ??????? system Inspection of susceptible lines will continue and compare predictions with inspection results
Flow Accelerated Corrosion Conclusion
- North Anna and Surry have effective FAC program which monitors susceptible piping for degradation caused by FAC
- Inspection data is incorporated into the FAC program and thus the program is continuously fine tuned
- The FAC program will ensure that components susceptible to FAC will be managed during the period of extended operation
Surry and North Anna
- Dominion License Renewal Applications Secondary Piping & Component Inspection AMA Chart Title 1200
"-u-Tot4 planned 800 Replacrtlrlts 600 Linear (Total Planned Replacements) 200 0# N 3/4 N 1/4~
7 07-Aug-02 Enclosure 2
Surry and North Anna ODominion License Renewal Applications Secondary Piping & Component Inspection AMA Chart Title 250 200
-Tota Inspection 150 Replace-m
- 100 Linear (Total Ins pection Replacem ents-)-
6 07-Aug-02