Revised Emergency Plan Implementing Procedures
ML022470220
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 08/26/2002
From: Jernigan D
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2002-161
Download: ML022470220 (3)


Text

0 FPL Florida Power & Light Company, 6501 South Ocean Drive, Jensen Beach, FL 34957 August 26, 2002 L-2002-161 10 CFR 50 Appendix E U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re:

St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Emergency Plan Implementing Procedures In accordance with 10 CFR 50 Appendix E, enclosed is a copy of each of the revised procedures that implement the St. Lucie Plant Radiological Emergency Plan.

Number Title EPIP-01 Classification Of Emergencies EPIP-02 Duties And Responsibilities Of The Emergency Coordinator EPIP-03 Emergency Response Organization Notification / Staff Augmentation EPIP-04 Activation And Operation Of The Technical Support Center EPIP-05 Activation And Operation Of The Operational Support Center EPIP-07 Conduct Of Evacuations / Assembly EPIP-08 Off-Site Notifications And Protective Action Recommendations EPIP-09 Off-Site Dose Calculations EPIP-12 Maintaining Emergency Preparedness Radiological Emergency Plan Training Revision Implementation Date 5

10 9

August 1, 2002 August 1, 2002 August 1, 2002 10 August 1,2002 8

4 5

7 11 August 1,2002 August 1, 2002 August 1, 2002 August 1, 2002 August 1, 2002 A revision summary is listed on pages 2 and 3. Please contact us if there are any questions regardi hese procedures.

Very tru yours, gonald an Vice President St. Lucie Plant DEJ/tit Enclosures 0

an FPL Group company

St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 L-2002-161 Page 2 Revision Summary EPIP-01 Revision 5

  • clarified emergency action levels (EALs) under Alert.

EPIP-02 Revision 10

"* clarified the duties of the Duty Call Supervisor (DCS) as a phonetalker.

"* clarified checklists regarding steps not necessary in the Technical Support Center (TSC).

"* made editorial/administrative changes.

EPIP-03 Revision 9

"* clarified the duties of the DCS as a phonetalker.

"* changed title revisions.

EPIP-04 Revision 10

"* referenced EPIP-08 for activation notification methods.

"* deleted duplicate information.

"* clarified instructions for using a commercial phone.

"* deleted priority requirements.

"* added Emergency Coordinator (EC) review/approvc.!-to Attachment A.

"* added Senior Reactor Operator (SRO) approval for 10 CFR 50.54(x) on 2B.

"* made editorial/administrative changes.

EPIP-05 Revision 8

"* added Operation Support Center (OSC) Manager position.

"* deleted the priority for re-entry teams.

"* added Emergency Coordinator (EC) approval.

"* added references and made editorial/administrative changes.

EPIP-07 Revision 4

"* revised OSC Supervisor title to OSC Supervisor/Manager.

"* made editorial/administrative changes.

EPIP-08 Revision 5

"* clarified duties.

"* removed local government radio (LGR).

"* made editorial/administrative changes.

St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 L-2002-161 Page 3 Revision Summary EPIP-09 Revision 7

"* corrected process and effluent monitor ranges.

"* corrected fan flow rates.

"* made numerous procedure step clarifications/improvements based on user/student feedback.

"* made editorial/administrative changes.

EPIP-12 Revision 11

"* added definitions.

"* clarified drill participation requirements.

"* eliminated notification of certain departments.

"* removed Protective Action Recommendation (PAR) training requirements for TSC Health Physics (HP) Supervisor.

"* added OSC Manager training.

"* made editorial/administrative changes.