Aug.
23, 2002 Page 1
of 1 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2002-39 USER INFORMATION:
Nb*URJ B
EMPL#:23244 CA#:
0363 Phone#: 254-3658 TRANSMITTAL INFORMATION:
PLAIMBLAUR-E-L-B 08/23/2002 LOCATION:
DOCUMENT CONTROL DESK FROM:
NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
- HE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY
"-'OR ELECTRONIC MANUAL ASSIGNED TO YOU:
134 HEALTH PHYSICS RADIOMAN:
EMERGENCY PLAN POSTION SPECIFIC INSTRUCTION REMOVE MANUAL TABLE OF CONTENTS DATE: 05/28/2002 ADD MANUAL TABLE OF CONTENTS DATE:
08/22/2002 CATEGORY:
PROCEDURES TYPE:
EP ID:
EP-PS-134 ADD:
PCAF 2002-1551 REV:
N/A UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5
DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.
PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY.
FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
A/-y Y-5
PROCEDURE OHbNGE PROCESS FORM
- 1. PCAF NO1 2.- PAGE 1 O
- 3. PROC. NO.
EP-PS-134 REV. 0
- 4.
FORMSREVISED -.
RL., -
'R R
,R -
R R
R
- 5.
PROCEDURE TITLE HEALTH PHYSICS RADIOMAN
- 6.
REQUESTED CHANGE PERIODIC REVIEW NO ElYES INCORPORATE PCAFS [
NO El YES REVISION r
PCAF Z DELETION E- (CHECK ONE ONLY)
- 7.
SUMMARY
OF REASON FOR CHANGE' TAB C now provides instructions in items 4. & 5. for re-booting the system whenWM is not operational.
Reference AR 411616411616
(Continued El "8. DETERMINE COMMITTEE REVIEW REQUIREMENTS, (Refer to Section 6.1.4)
PORC REVIEW REQ'D?
[l]'YES
- 9.
PORC MTIG#
BLOCKS 11 THRU 16 AP ON PAGE'2OF FORM
- 17.
R.C. Kessler
, 4-'2i4.1341.* '° /'07/26/2002
- 18. COMMUNICATION OF CHANGE REQUIRED?
PREPARER
"\\,TN4ý1 DATE El NO -0 YES (TYPE) HP-HI-038
.I (Print or Type)
- 1.
.SIGNATURE ATTESTS THAT RESPONSIBLE SUPERVISOR HAS CONDUCTED QADR AND TECHNICAL REVIEW UNLESS OTHERWISE i',oz DOCUMENTED IN BLOCK 16 OR ATrACHED REVIEW FORMS.
IP%
REM GROSS DISCIPLINE REVIEW (IF REQUIRED) HAS BEEN COMPLETED SE 7DAT BY SIGNATURE IN BLOCK 16 OR ATTACHED REVIEW FORMS.
F+UM APROV__fla DATE
=*
- 21.
RESPONSIBLE APPROVER ENTER N/A IF FUM HAS APPROVAL AUTHORITY
}iINITIALS DATE i0 AUG 2 0 2012 14 FORM NDAP-QA-0002-8, Rev. 8, Page 1 of 2 (Electronic Form)
SERVICES - SSES
H11.
- 12.
- 13.
- 14.
15.
F PCAF NC PROCEDURE C"NGE PROCESS FORM S12.
PAGE
- 3. PROC. NO. EP-PS-134 REV. 0 This question documents the outcome of the 50.59 and 72.48 Review required by NDAP-QA-0726. Either 1 la, b, c or d must be checked "YES" and the appropriate form attached or referenced.
- a. This change is an Administrative Correction for which 50.59 and 72.48 are not r-YES Z
N/A applicable.
- b. This change is a change to any surveillance, maintenance or administrative
[ YES
-- N/A procedure for which 50.59 and 72.48 are not applicable.
- c. This change is bounded by a 50.59/72.48 Screen/Evaluation, therefore, no new
] YES Z
N/A 50.59/72.48 Evaluation is required.
Screen/Evaluation No.
- d. 50.59 and/or 72.48 are applicable to this change and a 50.59/72.48 L] YES W
N/A Screen/Evaluation is attached.
This change is consistent with the FSAR or an FSAR change is required.
[
YES Change Request No.
Should this change be reviewed for potential effects on Training Needs or Material?
L] YES
[ NO If YES, enter an Action Item @ NIMS/Action/Gen Work Mech/PICN Is a Surveillance Procedure Review Checklist required per NDAP-QA-0722?
[I YES
[ NO Is a Special, Infrequent or Complex Test/Evolution Analysis Form required per
"- YES Z
NO NDAP-QA-0320? (SICT/E form does not need to be attached.)
- 16. Reviews may be documented below or by attaching Document Review Forms NDAP-QA-0101-1.
REVIEWED BY WITH DATE REVIEW NO COMMENTS QADR TECHNICAL REVIEW REACTOR ENGINEERING/NUCLEAR FUELS IST **
OPERATIONS NUCLEAR SYSTEMS ENGINEERING NUCLEAR MODIFICATIONS MAINTENANCE HEALTH PHYSICS NUCLEAR TECHNOLOGY CHEMISTRY OTHER Required for changes that affect, or have potential for affecting core reactivity, nuclear fuel, core power level indication or impact the thermal power heat balance. (8)
"Required for changes to Section Xl Inservice Test Acceptance Criteria.
-QA-0002-8, Rev. 8, Page 2 of 2 (Electronic Form)
OR NA
IPtAF.#,
PAGjjT MAJOR TASK:
Radiological Monitoring with RMS j
- Loss of Locational Telemetry and/or
- Loss of Radiological Telemetry "NOTE:
This TAB provides guidance for the twc operational condition. The intent is for normal monitoring strategy specified in If a different RMS deficiency occurs the operational condition, consult with the.
the EOFto determine a means of comj continued use of RMS.
SPECIFIC TASKS:
.1. Loss of Locational Telemetry It I'i TAB C EP-PS-1 34-C Revision..
/
Page 1 of 3 partially operational:
o most likely reasons RMS will be in a partdally this guidance to be used in conjunction with lte TAB B.
it also results in RMS being put in a partially "I'SC Dose Calculator, RPC, or the oncoming FTD; n
)ensating for the deficiency and enabling the HOW:
la.
In the event you are permanently unable to track OSCAR's location on the lMoNii Survey Plot Screen (MSPS):
(1)
Manually track OSCAR's location on the large area map in the TSC.
(2)
Communicate monitoring location instructions via radio using the Onsite Emergency Monitorin,*
Locations form located in TAB 'l.
(3)
Record sectors traversed by OSCAR in the Radioman's La.
lb.
With OSCAR's gamma or iodine channels selected on the MSPS, the associated radiological data (Current Rate and Peak) will still be displayed on the left side of the screen. Reports cc still be generated and printed as specified in TAB 1, Section 2.
S"
-;T A B C
-A EP-PS-134-C PAGE.::
OF Revisioný /
OF Page 2 of 3 SPECIFIC TASKS:
HOW:
- 2.
Loss of Radiological Telemetry 2a.
In this case youwill still be able to see OSCAR's location marker displayed on the MSPS, but there will not be any radiological data displayed on the left side of the screen.
j (1)
Track OSCAR's location by monitoring the MSPS.
(2)
Direct OSCAR to communicatb the radiological survey data to you via radio or cell phone.
1 (3)
Record the radiological survey data reported by OSCAR on tlha Survey Data Form (with RMS Partially Operable) located in TAB 2 and give to TSC Dose Calculator.
HELP U)
Survey Data Form - RMS Partially Operable See TAB 2
- 3.
Loss of both Locational AND 3a.
First hit the [F8] key (this will transfer the Radiological Telemetry RMS display source from the TSC to the EOF via phone line). if this results in the recovery of radiological and/or locational telemetry, then the prior telemetry loss was due to a problem with the local repeater at the TSC.
Continue management of OSCAR via the EOF display.
NOTE:
I' Since all RMS data and comma*,s are now being communicated via phone line, expect a short time delay with RMS operations i!
)
PCAF # OL5/
PAGE 2OF SPECIFIC TASKS:
TAB C EP-PS-134-C Revision IJ Page 3 of 3 HOW:
3b.
If transferal of the RMS display source does not work, simultaneously follow the guidance outlined above in steps I and 2.
- 4.
RMS System "locked-up" (i.e. system 4a.
no longer responding to commands).
- 5.
If RMS Keyboard is "locked-up" (i.e.
depressing the CONTROL-ALT DELETE fails to restart the system),
shutdown then restart RMS System.
Attempt to restart RMS system by simultaneously depressing the CONTROL-ALT-DELETE Keys.
4b.
The system restart is completely automatic and takes about 10 minutes.
When startup completed, access Mobile Survey Plot and verify RMS operability by following steps 1.2 - 1.7 of TAB 1.
NOTE: Until RMS operability restored, conduct field monitoring via TAB D.
5a.
Open the access door (located directly under keyboard) to the base station housing and locate the PC tower.
5b.
Depress the POWER button to turn the power off, wait 20 - 30 seconds, then depress the POWER button again to restart.
5c.
The system restart is completely automatic and takes about 10 minutes.
When startup completed, access Mobile Survey Plot and verify RMS operability by following steps 1.2 - 1.7 of TAB 1.
NOTE: Until RMS operability restored, conduct field monitoring via TAB D.
- 6.
If at any point the RMS equipment inside the OSCAR Van is determined to be inoperable, then continue radiological monitoring in accordance with TAB D.
C
'I