August 30, 2002Mr. Anthony PietrangeloNuclear Energy Institute 1776 I Street, N. W.
Suite 400 Washington, DC 20006-3708
Dear Mr. Pietrangelo:
The Nuclear Regulatory Commission has completed its review of the Nuclear Energy InstituteTechnical Specification Change Traveler, TSTF-411, Rev. 1" Surveillance Test Interval Extensions for Components of the Reactor Protection System" proposed changes to NUREG-1431, Rev. 2, "Standard Technical Specifications Westinghouse Plants." The staff finds the proposed changes acceptable without modification. Accordingly, the staff will instruct Westinghouse to include TSTF-411, Rev. 1 with publication of the approved version of WCAP-15376-P. The safety evaluation approving this WCAP will also contain the basis for approving the TSTF. Individual licensees may then propose to adopt the approved TS during a conversion to the STS or as a separate license amendment application for WCAP-15376-P. Please contact me at (301) 415-1161 or e-mail wdb@nrc.gov if you have any questions or needfurther information on these proposed changes.Sincerely,/RA/William D. Beckner, Program Director Operating Reactor Improvements Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulationcc:J. Arbuckle, BWROGD. Bice, CEOG N. Clarkson, BWOG S. Wideman, WOG D. Hoffman, EXCEL August 30, 2002Mr. Anthony PietrangeloNuclear Energy Institute 1776 I Street, N. W.
Suite 400 Washington, DC 20006-3708
Dear Mr. Pietrangelo:
The Nuclear Regulatory Commission has completed its review of the Nuclear Energy InstituteTechnical Specification Change Traveler, TSTF-411, Rev. 1
" Surveillance Test IntervalExtensions for Components of the Reactor Protection System
" proposed changes to NUREG-1431, Rev. 2, "Standard Technical Specifications Westinghouse Plants.
" The staff finds theproposed changes acceptable without modification. Accordingly, the staff will instruct Westinghouse to include TSTF-411, Rev. 1 with publication of the approved version of WCAP-15376-P. The safety evaluation approving this WCAP will also contain the basis for approving the TSTF. Individual licensees may then propose to adopt the approved TS during a conversion to the STS or as a separate license amendment application for WCAP-15376-P. Please contact me at (301) 415-1161 or e-mail wdb@nrc.gov if you have any questions or needfurther information on these proposed changes.Sincerely,/RA/William D. Beckner, Program Director Operating Reactor Improvements Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulationcc:J. Arbuckle, BWROGD. Bice, CEOG N. Clarkson, BWOG S. Wideman, WOG D. Hoffman, EXCELDISTRIBUTION
- ADAMS DMatthews/FGillespieWDBeckner RORP R/FRLDennigCSSchulten LHill-TSTF-411, Rev.1ADAMS ACCESSION #ML022460347DOCUMENT NAME: C:\ORPCheckout\FileNET\ML022460347.wpdOFFICETSS/DRIP:NRRTSS/DRIP:NRRSC:TSS/DRIP:NRRPD:RORP:DRIP:NRRNAMECSSchultenLHillRLDennigWDBeckner DATE08/29/0208/ /0208/30/0208/30/02OFFICIAL RECORD COPY