ML022460255

From kanterella
Jump to navigation Jump to search
Meeting Between NRC and Entergy Operations, Inc., Re Refueling Water Storage Pool Piping Analysis at Waterford Unit 3
ML022460255
Person / Time
Site: Waterford 
Issue date: 09/03/2002
From: Kalyanam N
NRC/NRR/DLPM/LPD4
To: Gramm R
NRC/NRR/DLPM/LPD4
Kalyanam N, NRR/DLPM, 415-1480
References
Download: ML022460255 (5)


Text

September 3, 2002 MEMORANDUM TO: Robert A. Gramm, Chief, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation FROM:

N. Kalyanam, Project Manager, Section 1

/RA/

Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation

SUBJECT:

FORTHCOMING MEETING WITH ENTERGY OPERATIONS, INC., RE:

REFUELING WATER STORAGE POOL PIPING ANALYSIS AT WATERFORD STEAM ELECTRIC STATION, UNIT 3 DATE & TIME:

Friday, September 6, 2002 1:00 p.m. - 4:00 p.m.

LOCATION:

U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, Room O-9B6 Rockville, Maryland PURPOSE:

Entergy Operations, Inc., will discuss the seismic qualification of the piping system contained in the refueling water storage pool purification system piping.

CATEGORY:

  • Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

PARTICIPANTS:

NRC Entergy Operations, Inc.

R. Gramm M. Brandon K. Manoly J. Reese J. Fair J. Burke N. Kalyanam Docket No.: 50-382 cc: See next page MEETING CONTACT:

N. Kalyanam, NRR 301-415-1480 nxk.gov

  • Commission's Policy Statement on Enhancing Public Participation in NRC Meetings,"

67 Federal Register 36920, May 28, 2002.

September 3, 2002 MEMORANDUM TO: Robert A. Gramm, Chief, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation FROM:

N. Kalyanam, Project Manager, Section 1

/RA/

Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation

SUBJECT:

FORTHCOMING MEETING WITH ENTERGY OPERATIONS, INC., RE:

REFUELING WATER STORAGE POOL PIPING ANALYSIS AT WATERFORD STEAM ELECTRIC STATION, UNIT 3 DATE & TIME:

Friday, September 6, 2002 1:00 p.m. - 4:00 p.m.

LOCATION:

U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, Room O-9B6 Rockville, Maryland PURPOSE:

Entergy Operations, Inc., will discuss the seismic qualification of the piping system contained in the refueling water storage pool purification system piping.

CATEGORY:

  • Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

PARTICIPANTS:

NRC Entergy Operations, Inc.

R. Gramm M. Brandon K. Manoly J. Reese J. Fair J. Burke N. Kalyanam Docket No.: 50-382 cc: See next page MEETING CONTACT:

N. Kalyanam, NRR 301-415-1480 nxk.gov

  • Commission's Policy Statement on Enhancing Public Participation in NRC Meetings,"

67 Federal Register 36920, May 28, 2002.

Accession No.: ML022460255 OFFICE PDIV-1/PM PDIV-1/LA PDIV-1/SC D:PDIV NAME NKalyanam DJohnson RGramm WRuland DATE 9/3/02 9/3/02 9/3/02 9/3/02 OFFICIAL RECORD COPY

DISTRIBUTION FOR FORTHCOMING MEETING WITH ENTERGY OPERATIONS, INC.

RE: REFUELING WATER STORAGE POOL PIPING ANALYSIS AT WATERFORD STEAM ELECTRIC STATION, UNIT 3, ON SEPTEMBER 6, 2002 Date: September 3, 2002 HARD COPY PD IV-1 Reading File Receptionist (OWFN and TWFN)

DISTRIBUTION:

PUBLIC RidsNrrAdpt (BShearon/JSebrosky)

RidsNrrDlpm (JZwolinski/TMarsh)

RidsNrrDlpmLpdiv (WRuland)

RidsNrrDlpmLpdiv1 (RGramm)

KManoly JFair RidsNrrPMNKalyanam RidsNrrLADJohnson RidsRgn4MailCenter (KBrockman)

BHenderson, OPA (BWH)

RidsOpaMail RidsOgcRp RidsAcrsAcnwMailCenter SMorris, EDO (SAM1)

PMNS NRR Communications Coordinator (MKotzalas)

May 1999 Waterford Generating Station 3 cc:

Mr. Michael E. Henry, Administrator and State Liaison Officer Department of Environmental Quality P. O. Box 82135 Baton Rouge, LA 70884-2135 Vice President, Operations Support Entergy Operations, Inc.

P. O. Box 31995 Jackson, MS 39286-1995 Director Nuclear Safety Assurance Entergy Operations, Inc.

17265 River Road Killona, LA 70066-0751 Wise, Carter, Child & Caraway P. O. Box 651 Jackson, MS 39205 General Manager Plant Operations Waterford 3 SES Entergy Operations, Inc.

17265 River Road Killona, LA 70066-0751 Licensing Manager Entergy Operations, Inc.

17265 River Road Killona, LA 70066-0751 Winston & Strawn 1400 L Street, N.W.

Washington, DC 20005-3502 Resident Inspector/Waterford NPS P. O. Box 822 Killona, LA 70066-0751 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 Parish President Council St. Charles Parish P. O. Box 302 Hahnville, LA 70057 Executive Vice President

& Chief Operating Officer Entergy Operations, Inc.

P. O. Box 31995 Jackson, MS 39286-1995 Chairman Louisiana Public Services Commission P.O. Box 91154 Baton Rouge, LA 70825-1697