August 29, 2002 South Carolina Electric & Gas Company ATTN: Mr. Stephen A. Byrne Vice President, Nuclear Operations Virgil C. Summer Nuclear Station P. O. Box 88 Jenkinsville, SC 29065

SUBJECT:

PUBLIC MEETING

SUMMARY

- POST-REFUELING OUTAGE MEETING, VIRGIL C. SUMMER NUCLEAR STATION - DOCKET NO. 50-395

Dear Mr. Byrne:

This refers to the meeting conducted at your request at our office in Atlanta, Georgia on August 27, 2002. The purpose of the meeting was to discuss the recent Virgil C. Summer refueling outage and other items of interest. A list of attendees and presentation handouts are enclosed.

At the meeting, your staff presented an informational overview of activities performed during Refueling Outage 13 and discussed the upcoming spent fuel pool re-rack project and the status of your corrective action program. Outage activities discussed included outage goals, major projects and an update on the reactor vessel leg cracking issue.

In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Kerry D. Landis, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket No. 50-395 License No. NPF-12

Enclosures:

1. List of Meeting Attendees
2. Licensee Presentation Handouts cc w/encls: See page 2

SCE&G 2 cc w/encls:

R. J. White Nuclear Coordinator Mail Code 802 S.C. Public Service Authority Virgil C. Summer Nuclear Station Electronic Mail Distribution Kathryn M. Sutton, Esq.

Winston and Strawn Electronic Mail Distribution Henry J. Porter, Director Div. of Radioactive Waste Mgmt.

Dept. of Health and Environmental Control Electronic Mail Distribution R. Mike Gandy Division of Radioactive Waste Mgmt.

S. C. Department of Health and Environmental Control Electronic Mail Distribution Gregory H. Halnon, General Manager Nuclear Plant Operations (Mail Code 303)

South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station Electronic Mail Distribution Melvin N. Browne, Manager Nuclear Licensing & Operating Experience (Mail Code 830)

Virgil C. Summer Nuclear Station Electronic Mail Distribution

SCE&G 3 Distribution w/encls:

K. Cotton, NRR M. Widmann, RII RIDSNRRDIPMLIPB PUBLIC OFFICE RII:DRP SIGNATURE lxg1 NAME LGarner DATE 8/29/2002 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO PUBLIC DOCUMENT YES NO OFFICIAL RECORD COPY DOCUMENT NAME: C:\ORPCheckout\FileNET\ML022460191.wpd

LIST OF MEETING ATTENDEES Topic: VIRGIL C. SUMMER NUCLEAR STATION POST-REFUELING OUTAGE MEETING Location: US Nuclear Regulatory Commission, Region II Office, Atlanta, Georgia Date: August 27, 2002 NRC Region II Luis Reyes Regional Administrator Bruce Mallett Deputy Regional Administrator Region Charles Casto Director, Division of Reactor Safety (DRS)

Victor McCree Deputy Director, Division of Reactor Projects (DRP)

Mike Scott Senior Project Engineer, DRS Larry Garner Senior Project Engineer, Reactor Projects Branch 5, DRP Katherine Green-Bates Project Engineer, Reactor Projects Branch 5, DRP South Carolina Electric & Gas Company Steve Byrne Senior Vice President, Nuclear Operations Division Greg Halnon General Manager, Nuclear Plant Operations Alan Torres Manager, Planning/Outage Wayne Stuart Acting Manager, Plant Support Engineering Bill Herwig Supervisor, Reactor Engineering Enclosure 1