UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-4005 AU 2

6 Paul D. Hinnenkamp, Vice President - Operations River Bend Station Entergy Operations, Inc.

P.O. Box 220 St. Francisville, Louisiana 70775

SUBJECT:

MIDCYCLE PERFORMANCE REVIEW AND INSPECTION PLAN RIVER BEND STATION

Dear Mr. Hinnenkamp:

On August 1, 2002, the NRC staff completed its midcycle plant performance assessment of River Bend Station. In accordance with NRC Inspection Manual Chapter 0305, "Operating Reactor Assessment Program," the midcycle review involved the participation of all technical divisions in evaluating the performance of your River Bend Station facility for the first half of the current assessment cycle, January 1 through December 31, 2002. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility so that you will have an opportunity to prepare for these inspections and to inform us of any planned inspections which may conflict with your plant activities.

Plant performance for the most recent quarter was within the Regulatory Response column of the NRC's Action Matrix based on one finding of low to moderate risk significance in the Emergency Preparedness Cornerstone for failure to comply with the requirements of 10 CFR 50.47(b)(7). Between 1985 and January 2002, River Bend Station did not provide emergency preparedness information to members of the public utilizing facilities within the licensee's owner controlled area. A supplemental inspection utilizing Inspection Procedure 95001, "Inspection Procedure for One or Two White Inputs in a Strategic Performance Area," is scheduled to be conducted during the week of November 25, 2002, to review your actions regarding this risk significant performance issue.

The enclosed inspection plan details the inspections scheduled through September 30, 2003.

The inspection plan is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

The last 6 months of the inspection plan are tentative and may be revised at the end-of-cycle review.

In addition, the NRC is in the process of finalizing a Temporary Instruction (TI) that will be used to review implementation of the Interim Compensatory Measures required by the Agency's Security Order to all commercial nuclear power plants dated February 25, 2002. Schedules V

Entergy Operations, Inc.

have not yet been finalized, but it is anticipated that these inspections will begin within the next calendar quarter. Once finalized, the details will be communicated by separate correspondence.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 817/860-8141 with any questions you may have regarding this letter or the inspection plan.

Sincerely, i

Broc an, rector

,iision of Reactor Projects Docket: 50-458 License: NPF-47

Enclosure:

River Bend Station Inspection/Activity Plan cc:

Executive Vice President and Chief Operating Officer Entergy Operations, Inc.

P.O. Box 31995 Jackson, Mississippi 39286-1995 Vice President Operations Support Entergy Operations, Inc P.O. Box 31995 Jackson, Mississippi 39286-1995 General Manager Plant Operations River Bend Station Entergy Operations, Inc.

P.O. Box 220 St. Francisville, Louisiana 70775 Entergy Operations, Inc.

Director - Nuclear Safety River Bend Station Entergy Operations, Inc.

P.O. Box 220 St. Francisville, Louisiana 70775 Wise, Carter, Child & Caraway P.O. Box 651 Jackson, Mississippi 39205 Mark J. Wetterhahn, Esq.

Winston & Strawn 1401 L Street, N.W.

Washington, DC 20005-3502 Manager - Licensing River Bend Station Entergy Operations, Inc.

P.O. Box 220 St. Francisville, Louisiana 70775 The Honorable Richard P. leyoub Attorney General Department of Justice State of Louisiana P.O. Box 94005 Baton Rouge, Louisiana 70804-9005 H. Anne Plettinger 3456 Villa Rose Drive Baton Rouge, Louisiana 70806 President West Feliciana Parish Police Jury P.O. Box 1921 St. Francisville, Louisiana 70775 Michael E. Henry, State Liaison Officer Department of Environmental Quality P.O. Box 82135 Baton Rouge, Louisiana 70884-2135 Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 1701 North Congress Avenue Austin, Texas 78701-3326 Entergy Operations, Inc.

Jimmy Bello, President Pointe Coupe Parish Police Jury P.O. Box 290 New Roads, Louisiana 70760 James Hunt, President East Feliciana Parish Police Jury P.O. Box 427 Clinton, Louisiana 70722 Ted Denstel, Parish President West Baton Rouge Parish Counsel P.O. Box 757 Port Allen, Louisiana 70767 Burt Babers, President West Feliciana Parish Police Jury P.O. Box 1921 St. Francisville, Louisiana 70775 Bobby Simpson, Mayor-President Office of the Mayor-President P.O. Box 1471 Baton Rouge, Louisiana 70821 Federal Emergency Management Ron Castleman, Regional Director Region VI, Federal Center 800 North Loop 288 Denton, Texas 76201-3698 Jim Brewer Asst. Chief Administrative Officer P.O. Box 1471 Baton Rouge, LA 70821 Joanne Moreau, Director Dept. of Emergency Management East Baton Rouge Parish P.O. Box 1471 Baton Rouge, LA 70821 Charles LeBlanc, Director Dept. of Emergency Management West Baton Rouge Parish P.O. Box 757 Port Allen, LA 70767 Entergy Operations, Inc.

Don Ewing, Director Dept. of Emergency Management Pointe Coupee Parish P.O. Box 248 New Roads, Louisiana 70760 Col. Michael A. Brown Assistant Director Military Department Office of Emergency Preparedness 7667 Independence Blvd.

Baton Rouge, Louisiana 70806 Tara Wicker Asst. Chief Administrative Officer P.O. Box 1471 Baton Rouge, Louisiana 70821 Jesse Means, Director Dept. of Emergency Management West Feliciana Parish P.O. Box 1927 St. Francisville, Louisiana 70775 T. W. Prewitt, Director Dept. of Emergency Management East Feliciana Parish P.O. Box 640 Jackson, Louisiana 70748 Entergy Operations, Inc.

Electronic distribution by RIV:

Regional Administrator (EWM)

DRP Director (KEB)

DRS Director (EEC)

Senior Resident Inspector (PJA)

Branch Chief, DRP/B (DNG)

Senior Project Engineer, DRP/B (RAKI)

Staff Chief, DRPITSS (PHH)

RITS Coordinator (NBH)

RidsNrrDipmlipb B. Henderson, PAO (BWH)

W. A. Maier, RSLO (WAM)

C. J. Gordon (CJG)

DRS Branch Chiefs (GMG, ATG, CSM)

W. D. Travers, EDO (WDT)

C. A. Carpenter, Chief, NRRJDIPM/IIPB (CAC)

R. K. Frahm, PPR Program Manager, NRRPDIPM/IIPB (RKF)

R. W. Borchardt, Associate Dir. for Inspection and Programs (RWB1)

B. W. Sheron, Associate Dir. for Project Licensing and Technical Analysis (BWS)

J. Shea, Chief, Regional Operations Staff, OEDO (JWSI)

W. Ruland, NRR Project Director (WHR)

R. Gramm, Chief, Section 1, NRR/DLPM (RAG)

D. Wrona, NRR Project Manager (DJWI)

Hard Copy:

Records Center, INPO S:\\DRP\\DRPDIR\\Midcycle 2002\\RBS.wpd.

DNGraves;df EE s

KEBrocktnv DNGraves O/I/02 C8/LLREO02 8COY02 8/ 4i /02 OFFICIAL RECORD COPY I- =!--II i~l r--rA I =lIelepnone

River Bend Inspection / Activity Plan 08/18/2002 - 09/30/2003 Page 1 of 2 08/12/2002 Report 22 Unit Number No. of Staff Planned Dates Inspection I

on Site I

Start End Type 09/16/2002 09/20/2002 Baseline Inspections 4

1 2

09/23/2002 09/27/2002 Baseline Inspections 10/07/2002 10/11/2002 Baseline Inspections 09/16/2002 09/20/2002 Baseline Inspections 09/16/2002 09/20/2002 Baseline Inspections 11/25/2002 11/27/2002 Supplemental Program 01/21/2003 01/24/2003 Not Applicable EMB

- HEAT SINKS IP 7111107B Heat Sink Performance EMB

- SSD&PC INSPECTION IP 7111121 Safety System Design and Performance Capability IP 7111121 Safety System Design and Performance Capability ACCESSPI

- ACRSA AND PIV IP 7112101 Access Control to Radiologically Significant Areas IP 71151 Performance Indicator Verification 95001

- 95001 SUPPLEMENT EP INSPECTION IP 95001 Supplemental Inspection For One Or Two White Inputs In A Strategic Performance Area OB-IN

- INITIAL EXAM PREP X02241 RIVER BEND - INITIAL EXAM (02/03)

PSB-EP1

- EP PROGRAM BASELINE INSPECTION IP 7111402 Alert and Notification System Testing IP 7111403 Emergency Response Organization Augmentation Testing IP 7111404 Emergency Action Level and Emergency Plan Changes IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 71151 Performance Indicator Verification EMB

- PERMANENT MODS IP 7111117B Permanent Plant Modifications OB-IN

- INITIAL EXAMS X02241 RIVER BEND - INITIAL EXAM (02/03)

EMB

-11SI IP 7111108 Inservice Inspection Activities ACCESSPI

-ACRSA IP 7112101 Access Control to Radiologically Significant Areas IP 71151 Performance Indicator Verification ALARA2

- ALARA PLANNING AND CONTROLS IP 7112102 ALARA Planning and Controls ALARA3

- ALARA PLANNING AND CONTROLS IP 7112102 ALARA Planning and Controls RP-TM

- RAD SAFETY TEAM IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112202.

Radioactive Material Processing and Transportation 2

6 I

1 1

1 4

01/31/2003 01/31/2003 01/31/2003 01/31/2003 01/31/2003 Baseline Inspections Baseline Inspections Baseline Inspections Baseline Inspections Baseline Inspections 02/10/2003 02/14/2003 Baseline Inspections 02/10/2003 02/14/2003 Not Applicable 03/17/2003 03/21/2003 Baseline Inspections 03/24/2003 03/28/2003 Baseline Inspections 03/24/2003 03/28/2003 Baseline Inspections 03/24/2003 03/28/2003 Baseline Inspections 05/12/2003 05/16/2003 Baseline Inspections 08/18/2003 08/18/2003 08/18/2003 08/22/2003 08/22/2003 08/22/2003 Baseline Inspections Baseline Inspections Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

15:32:21 Title lnsoection Activitv I [

I 4

1 01/27/2003 01/27/2003 01/27/2003 01/27/2003 01/27/2003 1

1 1

1 1

1 I

1 1

1 1

Page 2 of 2 08/12/2002 15:32:21 Report 22 Unit Number River Bend Inspection / Activity Plan 08/18/2002 - 09/30/2003 lInspection Activity *1 Title No. of Staffi Planned Dates Inspection Son Site l

Start End Type

- RAD SAFETY TEAM Radiological Environmental Monitoring Program 08/18/2003 08/22/2003 Baseline Inspections I nis report coes not Include INPU and Ou TAGE activities.

This report shows only on-site and announced inspection procedures.

RP-TM IP 7112203 4

I Title 1