MONTHYEARML24023A3242024-01-23023 January 2024 Inservice Inspection Request for Information ML23348A3712023-12-14014 December 2023 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report (05000416/2024011) and Request for Information IR 05000416/20230052023-08-21021 August 2023 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2023005) IR 05000416/20220062023-03-0101 March 2023 Annual Assessment Letter for Grand Gulf Nuclear Station Report 05000416/2022006 ML22312A5832022-11-0808 November 2022 Notification of Cyber Security Baseline Inspection and Request for Information 05000416/2023401 IR 05000416/20220052022-08-18018 August 2022 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2022005) ML22110A1172022-04-19019 April 2022 (GG) 2022 Emergency Preparedness (EP) Program Inspection RFI Sdh 041922 IR 05000416/20210062022-03-0202 March 2022 Annual Assessment Letter for Grand Gulf Nuclear Station (Report 05000416/2021006) ML22075A3682022-02-14014 February 2022 2022 PIR Request for Information.Pdf ML21327A0842021-11-22022 November 2021 ISI RFI IR 05000416/20210052021-09-0101 September 2021 Mid-Cycle Inspection Plan Transmittal Letter for Grand Gulf Nuclear Station (Report 05000416/2021005) ML21179A1202021-06-28028 June 2021 Notification of NRC Supplemental Inspection of Action Matrix Column 3 (Degraded Performance) Inputs and Request for Information ML21158A0822021-06-0707 June 2021 Notification of Inspection (NRC Inspection Report 05000416/2021003) and Request for Information ML21106A2232021-04-16016 April 2021 IR 2021402 Document Request List ML21074A0822021-03-15015 March 2021 Notification of Evaluations of Changes, Tests, and Experiments Inspection (Inspection Report 05000416/2021002) and Request for Information ML21061A3352021-02-25025 February 2021 Request for Information: Grand Gulf Nuclear Station, Dated December 4, 2020; Inspection Report 05000416-2021001, Occupational Radiation Safety Inspection-2, 4 ML20363A1462020-12-22022 December 2020 Request for Information: Grand Gulf EP Exercise Inspection - March 2021 ML20258A0202020-09-0909 September 2020 EP Program Inspection RFI, Request for Information to Support and Prepare for Emergency Preparedness (EP) Program Inspection Scheduled to Occur the Week of November 16, 2020 ML20199M2352020-07-17017 July 2020 Notification of NRC Design Bases Assurance Inspection (Teams) (Inspection Report 05000416/2020012) and Initial Request for Information ML20155K7172020-06-0303 June 2020 Notification of NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000416/2020013) and Request for Information ML20125A3802020-05-0404 May 2020 Request for Information, Inspection Date: July 20-24, 2020 ML20055E1562020-03-0303 March 2020 GG2019006 Annual Assessment Letter ML19346E2892019-12-11011 December 2019 ISI Request for Information ML19302E1102019-10-29029 October 2019 Document Request - GG 95001 - July 15 2019 ML19302E1082019-10-29029 October 2019 Document Request - GG 95001 - August 2 2019 IR 05000416/20190052019-08-30030 August 2019 Updated Inspection Plan for Grand Gulf Nuclear Station, Report 05000416/2019005 ML19148A5252019-05-28028 May 2019 Notification of Nrc Design Bases Assurance Inspection (Programs) ((05000416/2019010) and Initial Request for Information IR 05000416/20180062019-03-0404 March 2019 Annual Assessment Letter for Grand Gulf Nuclear Station (Report 05000416/2018006) ML19063B4882019-03-0404 March 2019 Notification of NRC Triennial Heat Sink Performance Inspection (05000416/2019002) and Request for Information ML19003A3812018-12-31031 December 2018 Notification of Cyber Security Inspection Report 05000416/2019410, and Request for Information ML18283A0622018-10-10010 October 2018 Notification of Evaluations of Changes, Tests, and Experiments Inspection (05000416/2018004) and Request for Information IR 05000416/20180052018-08-31031 August 2018 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2018005) IR 05000416/20170062018-03-0101 March 2018 Annual Assessment Letter for Grand Gulf Nuclear Station (Report 05000416/2017006) ML17243A3062017-08-28028 August 2017 Updated Non-Public Security Inspection Plan for Grand Gulf Nuclear Station, Unit 1 IR 05000416/20170052017-08-28028 August 2017 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2017005) IR 05000416/20160062017-03-0101 March 2017 Annual Assessment Letter for Grand Gulf Nuclear Station (Report 05000416/2016006) ML16320A2082016-11-14014 November 2016 Notification of an NRC Triennial Fire Protection Baseline Inspection (NRC Inspection Report 05000416/2017008) and Request for Information IR 05000416/20160052016-09-12012 September 2016 Errata for Mid-Cycle Assessment Letter for Grand Gulf Nuclear Station (Report 05000416/2016005) IR 05000416/20164012016-08-31031 August 2016 Non-Public Security Inspection Plan for Grand Gulf Nuclear Station (NRC Physical Security Inspection Report Number 05000416/2016401) ML16242A3352016-08-31031 August 2016 Mid-Cycle Assessment Letter for Grand Gulf Nuclear Station (Report 05000416/2016005) IR 05000416/20150062016-03-0202 March 2016 Annual Assessment Letter for Grand Gulf Nuclear Station (Report 05000416/2015006) IR 05000416/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Grand Gulf Nuclear Station (Report 05000416/2015005) ML15132A7112015-05-11011 May 2015 Notification of NRC Component Design Bases Inspection (05000416/2015007) and Initial Request for Information IR 05000416/20144022014-09-0202 September 2014 Non-Public Security Inspection Plan for Grand Gulf Nuclear Station (NRC Physical Security Inspection Report Number 05000416/2014402) IR 05000416/20140062014-09-0202 September 2014 Mid-Cycle Assessment Letter for Grand Gulf Nuclear Station (Report 05000416/2014006) IR 05000416/20130012014-03-0404 March 2014 IR 05000416-13-001, 02/11/2014, Grand Gulf, Annual Assessment Letter ML13350A0362013-12-11011 December 2013 Notification of NRC Triennial Fire Protection Baseline Inspection (NRC Inspection Report 05000416-14-007) and Request for Information IR 05000416/20130062013-09-0303 September 2013 Mid-Cycle Assessment Letter for Grand Gulf Nuclear Station (Report 05000416/2013006) IR 05000416/20128012013-03-0404 March 2013 Annual Assessment Letter for Grand Gulf Nuclear Station (Report 05000416/2012801) IR 05000416/20120062012-09-0404 September 2012 Letter Mid-Cycle Assessment Letter for Grand Gulf Nuclear Station (Report 05000416-12-006) 2024-01-23
[Table view] Category:Letter
MONTHYEARML24012A1422024-01-31031 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0051 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000416/20230042024-01-25025 January 2024 Integrated Inspection Report 5000416/2023004 ML24018A0222024-01-18018 January 2024 Core Operating Limits Report (COLR) Cycle 24, Revision 2 IR 05000416/20243012024-01-16016 January 2024 NRC Initial Operator Licensing Examination Approval 05000416/2024301 ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML23348A3712023-12-14014 December 2023 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report (05000416/2024011) and Request for Information ML23340A2222023-12-13013 December 2023 Project Manager Assignment ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1422023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000416/20234032023-11-13013 November 2023 Security Baseline Inspection Report 05000416/2023403 Cover Letter ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000416/20230032023-11-0808 November 2023 Integrated Inspection Report 05000416/2023003 ML23270B9932023-09-29029 September 2023 Request to Update ASME Boiler & Pressure Vessel Code Relief Request SE with NRC-Approved Revision of Bwrip Guidelines (GG-ISI-020 & RBS-ISI-019) (EPID L-2022-LLR-0090) - Non-Proprietary ML23270B1892023-09-27027 September 2023 Evacuation Time Estimate Study ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure ML23240A3952023-08-28028 August 2023 Reply to a Notice of Violation; EA-23-019 IR 05000416/20230052023-08-21021 August 2023 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2023005) ML23226A1002023-08-18018 August 2023 Regulatory Audit in Support of License Amendment Requests to Adopt TSTF-505, Revision 2, and 10 CFR 50.69 IR 05000416/20230022023-08-0808 August 2023 Integrated Inspection Report 05000416/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200050/2023001 IR 05000416/20234042023-08-0707 August 2023 Material Control and Accounting Program Inspection Report 05000416/2023404 IR 05000416/20230912023-07-28028 July 2023 Final Significance Determination of a Green Finding and Notice of Violation; NRC Inspection Report 05000416/2023091 ML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions ML23166B0712023-06-15015 June 2023 Reply to Notice of Violation EA-22-104 and EA-22-115 ML23166B0662023-06-15015 June 2023 Response to NRC Integrated Inspection Report 05000416/2023001 ML23159A2302023-06-0808 June 2023 Response to Request for Additional Information Concerning Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019) GNRO-2023/00014, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-06-0606 June 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b GNRO-2023/00015, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-06-0606 June 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML23122A1632023-05-18018 May 2023 NRC Inspection Report 05000416/2023090 and Preliminary White Finding IR 05000416/20234022023-05-17017 May 2023 Security Baseline Inspection Report 05000416/2023402 ML23110A8002023-05-10010 May 2023 Notice of Violation; Integrated Inspection Report 05000416/2023001 and NRC Investigation Report 4-2022-004 ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000416/20230012023-05-10010 May 2023 Notice of Violation; Integrated Inspection Report 05000416/2023001 and NRC Investigation Report 4-2022-004 ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML23117A0422023-04-27027 April 2023 Annual Radioactive Effluent Release Report (ARERR) ML23111A2132023-04-21021 April 2023 Responses to RAI Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities ML23110A1122023-04-20020 April 2023 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G ML23110A0552023-04-20020 April 2023 Annual Radiological Environmental Operating Report (AREOR) ML23103A1022023-04-13013 April 2023 Annual Report of Individual Monitoring - NRC Form 5 for 2022 Per 10 CFR 20.2206 ML23102A1482023-04-12012 April 2023 Notification of NRC Initial Operator Licensing Examination 05000416/2024301 ML23089A0602023-03-30030 March 2023 Entergy Operations, Inc. - Fleet Project Manager Assignment ML23088A3922023-03-29029 March 2023 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML23079A2772023-03-21021 March 2023 U.S. Nuclear Regulatory Commission Presentation at the May 1, 2023, Port Gibson City Council Meeting ML23080A2882023-03-21021 March 2023 Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) Entergy Operations, Inc IR 05000416/20230112023-03-0808 March 2023 Design Basis Assurance Inspection Report 05000416/2023011 2024-01-31
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-4005 William A. Eaton, Vice President Operations - Grand Gulf Nuclear Station Entergy Operations, Inc.
P.O. Box 756 Port Gibson, Mississippi 39150
SUBJECT:
MIDCYCLE PERFORMANCE REVIEW AND INSPECTION PLAN GRAND GULF NUCLEAR STATION
Dear Mr. Eaton:
On July 31, 2002, the NRC staff completed its midcycle plant performance assessment of Grand Gulf Nuclear Station. In accordance with NRC Inspection Manual Chapter 0305, "Operating Reactor Assessment Program," the midcycle review involved the participation of all technical divisions in evaluating the performance of your Grand Gulf Nuclear Station facility for the first half of the current assessment cycle, January 1 through December 31, 2002. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility so that you will have an opportunity to prepare for these inspections and to inform us of any planned inspections which may conflict with your plant activities.
Plant performance for the most recent quarter was within the Licensee Response column of the NRC's Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all performance indicators indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct only baseline inspections at your facility through September 30, 2003.
The enclosed inspection plan details the inspections scheduled through September 30, 2003.
The inspection plan is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.
The last 6 months of the inspection plan are tentative and may be revised at the end-of-cycle review.
In addition, the NRC is in the process of finalizing a Temporary Instruction (TI) that will be used to review implementation of the Interim Compensatory Measures required by the Agency's Security Order to all commercial nuclear power plants dated February 25, 2002. Schedules have not yet been finalized, but it is anticipated that these inspections will begin within the next calendar quarter. Once finalized, the details will be communicated by separate correspondence.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public
Entergy Operations, Inc. Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 817/860-8148 with any questions you may have regarding this letter or the inspection plan.
Sincerely, W. D. Johnson, Chief Project Branch A Division of Reactor Projects Docket: 50-416 License: NPF-29
Enclosure:
Grand Gulf Nuclear Station Inspection/Activity Plan cc w/enclosure:
Executive Vice President and Chief Operating Officer Entergy Operations, Inc.
P.O. Box 31995 Jackson, Mississippi 39286-1995 Wise, Carter, Child & Caraway P.O. Box 651 Jackson, Mississippi 39205 Winston & Strawn 1400 L Street, N.W. - 12th Floor Washington, DC 20005-3502 Director Division of Solid Waste Management Mississippi Department of Natural Resources P.O. Box 10385 Jackson, Mississippi 39209
Entergy Operations, Inc. President, District 1 Claiborne County Board of Supervisors P.O. Box 339 Port Gibson, Mississippi 39150 General Manager Grand Gulf Nuclear Station Entergy Operations, Inc.
P.O. Box 756 Port Gibson, Mississippi 39150 The Honorable Richard leyoub Attorney General Department of Justice State of Louisiana P.O. Box 94005 Baton Rouge, Louisiana 70804-9005 Office of the Governor State of Mississippi Jackson, Mississippi 39201 Mike Moore, Attorney General Frank Spencer, Asst. Attorney General State of Mississippi P.O. Box 22947 Jackson, Mississippi 39225 Dr. F. E. Thompson, Jr.
State Health Officer State Board of Health P.O. Box 1700 Jackson, Mississippi 39215 Robert W. Goff, Program Director Division of Radiological Health Mississippi Dept. of Health P.O. Box 1700 Jackson, Mississippi 39215-1700 Vice President Operations Support Entergy Operations, Inc.
P.O. Box 31995 Jackson, Mississippi 39286-1995
Entergy Operations, Inc. Director, Nuclear Safety and Regulatory Affairs Entergy Operations, Inc.
P.O. Box 756 Port Gibson, Mississippi 39150 Charlie Norrell Supervisor, District 2 Claibome County 1045 Magnolia Lane Port Gibson, Mississippi 39150 Charles Shorts, Vice President Supervisor, District 5 Claiborne County 4007 Pine Grove Road Port Gibson, Mississippi 39150 Martha Loft, District 4 Claiborne County Board of Supervisors P.O. Box 279 Port Gibson, Mississippi 39150 Mary Jones Claiborne County Tax Assessor/Collector P.O. Box 469 Port Gibson, Mississippi 39150 Amelda Arnold, Mayor Town of Port Gibson P.O. Box 607 Port Gibson, Mississippi 39150 Robert R. Latham, Jr., Director Mississippi Emergency Management Agency P.O. Box 4501, Fondren Station Jackson, Mississippi 39296-4501 Edward Brown, Mayor City of St. Joseph P.O. Box 217 St. Joseph, Louisiana 71366
Entergy Operations, Inc. Alex Davis, Mayor City of Newellton P.O. Box 477 Newellton, Louisiana 71357 Rick Foster, Director Tensas Office of Emergency Preparedness P.O. Box 768 St. Joseph, Louisiana 71366 Mike Henry State Liaison Officer Department of Environmental Quality P.O. Box 82135 Baton Rouge, Louisiana 70884-2135 Federal Emergency Management Agency, Region IV ATTN: Kenneth 0. Burris, Jr.
Regional Director 3003 Chamblee Tucker Road Atlanta, Georgia 30341 Col. Michael Brown Assistant Director Military Department Office of Emergency Preparedness P.O. Box 44217 Baton Rouge, Louisiana 70804 Federal Emergency Management Agency, Region VI ATTN: Ron Castleman, Regional Director 800 North Loop 288 Denton, Texas 76201-3698 Albert Butler, President SupervisoF, District 1 Claiborne County P.O. Box 614 Port Gibson, Mississippi 39150 William Moore Supervisor, District 3 P.O. Box 645 Port Gibson, Mississippi 39150
Entergy Operations, Inc. Electronic distribution by RIV:
Regional Administrator (EWM)
DRP Director (KEB)
DRS Director (EEC)
Senior Resident Inspector (TLH4)
Branch Chief, DRP/A (WDJ)
Senior Project Engineer, DRP/A (CJP)
Staff Chief, DRP/TSS (PHH)
RITS Coordinator (NBH)
Scott Morris (SAMI)
GG Site Secretary (MJS)
Dale Thatcher (DFT) [if it includes Maintenance]
RidsNrrDipmlipb B. Henderson, PAO (BWH)
W. A. Maier, RSLO (WAM)
C. J. Gordon (CJG)
DRS Branch Chiefs (GMG, ATG, CSM)
W. D. Travers, EDO (WDT)
C. A. Carpenter, Chief, NRR/DIPM/IIPB (CAC)
R. K. Frahm, PPR Program Manager, NRRIDIPM/IIPB (RKF)
R. W. Borchardt, Associate Dir. for Inspection and Programs (RWB1)
B. W. Sheron, Associate Dir. for Project Licensing and Technical Analysis (BWS)
J. Shea, Chief, Regional Operations Staff, OEDO (JWS1)
W. Ruland, NRR Project Director (WHR)
R. Gramm, Chief, Section 1, NRR/DLPM (RAG)
S. Sekerak, NRR Project Manager (PXSI)
Hard Copy:
Records Center, INPO S:\DRP\DRPDIR\Midcycle 2002\GG.wpd WDJohnson;t KBro Johnso 118/q/02 8/
1_ 02 18t o2 8_d8 2 OFFICIAL RECORD COPY I=lelepnone E:=E_-mall -=F-ax
Page 1 of 2 Grand Gulf 08/12/2002 15:16:54 Inspection / Activity Plan Report 22 08/18/2002 - 09/30/2003 UnitF No. of Staff Planned Dates Il Inspection Number I ]lnsoection Activitv *[F_ Title ) on Site I[ Start End jTpe I linsnection Activitv OB-IN - INITIAL EXAM 3 X02231 GRAND GULF INITIAL EXAM (08/02) 08/26/2002 08/30/2002 Not Applicable EMB -ISI I 1 IP 7111108 Inservice Inspection Activities 09/23/2002 09/27/2002 Baseline Inspections ACCESSPI - ACRSA AND PIV I 1 IP 7112101 Access Control to Radlologlca Ily Significant Areas 09/30/2002 10/04/2002 Baseline Inspections 1
IP 71151 Performance Indicator Verification 09/30/2002 10/04/2002 Baseline Inspections ALARA2 - ALARA PLANNING AND CONTROLS I IP 7112102 ALARA Planning and Controls 09/30/2002 10/04/2002 Baseline Inspections PSB-EP1 - EP PROGRAM BASELINE INSPECTION I IP 7111402 Alert and Notification System Testing 12/09/2002 12/13/2002 Baseline Inspections IP 7111403 Emergency Response Organization Augmentation Testing 12/09/2002 12/13/2002 Baseline Inspections IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 12/09/2002 12/13/2002 Baseline Inspections EMB - HEAT SINKS 1 IP 7111107B Heat Sink Performance 02/10/2003 02/14/2003 Baseline Inspections EMB - BIENNIAL MR INSPECTION 1 IP 7111112B Maintenance Effectiveness 02/10/2003 02/14/2003 Baseline Inspections OB-PIR - GG PIR INSPECTION IP 71152 Identification and Resolution of Problems 1 03/03/2003 03/21/2003 Baseline Inspections PSB-S1 - ACCESS AUTH/CONTROL, SECURITY PLAN, PIV IP 7113001 Access Authorization Program (Behavior Observation Only) 03/10/2003 03/14/2003 Baseline Inspections IP 7113002 Access Control (Search of Personnel, Packages, and Vehicles: Identification and Authorization) 03/10/2003 03/14/2003 Baseline Inspections IP 7113004 Security Plan Changes 03/10/2003 03/14/2003 Baseline Inspections IP 71151 Performance Indicator Verification 03/10/2003 03/14/2003 Baseline Inspections ACCESSPI - ACRSA/PI I IP 7112101 Access Control to Radiologically Significant Areas 06/23/2003 06/27/2003 Baseline Inspections IP 71151 Performance Indicator Verification 06/23/2003 06/27/2003 Baseline Inspections EMB - PERMANENT MODS 2 IP 7111117B Permanent Plant Modifications 08/11/2003 08/15/2003 Baseline Inspections ALARA3 - ALARA PLANNING AND CONTROLS 1 IP 7112102 ALARA Planning and Controls 08/25/2003 08/29/2003 Baseline Inspections OB-IN - INITIAL EXAM PREP 1 X02237 GRAND GUILF - INITIAL EXAM (09/03) 09/08/2003 09/12/2003 Not Applicable PSB-EP1 - EP EXERCISE BASELINE INSPECTION 2 IP 7111401 Exercise Evaluation 09/17/2003 09/18/2003 Baseline Inspections This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures. I I
Page 2 of 2 Grand Gulf 08/12/2002 15:16:54 Inspection / Activity Plan Report 22 08/18/2002 - 09/30/2003 INo. of Staff Planned Dates Inspection Unit *1 on Slte { Start End ...t ye Number {Inspection ýc~tlvlt _ _ - ..... . ...... Title .....
PSB-EP1 - EP EXERCISE BASELINE INSPECTION 2 Emergency Action Level and Emergency Plan Changes 09/17/2003 09/18/2003 Baseline Inspections 1 IP 7111404 1 09/17/2003 09/18/2003 Baseline Inspections IP 71151 Performance Indicator Verification
- INITIAL EXAMS 4 OB-IN 1 09/29/2003 10/03/2003 Not Applicable X02237 GRAND GULF - INITIAL EXAM (09/03)
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures. I