Richard L Anderson Vice President - Nuclear Operations PPL Susquehanna, LLC 769 Salem /Boulevard Berwick, PA 18603 Tel 570 542.3883 Fax 570.542.1504 RLAnderson @ pplweb corn
%. I J I
j EE
- a:.-
pp'4 TM August 15, 2002 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station OP1-17 Washington, D.C. 20555 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 and 50-388/NPF-22 PLA-005515 R41-2A The attached report is a complete re-submittal of Susquehanna SES Unit 1 and 2 report for June 2002. This report supercedes the previous report PLA-05499 dated July 12, 2002.
The action corrects an administrative error whereby the monthly net generation was transposed between the respective Units on the Operating Data Report (Item #9).
Very truly yours, Richard L. Anderson JJH/cmm cc: NRC Region 1 NRC Sr. Resident Inspector, Mr. S. Hansell NRC Sr. Project Manager, Mr. T. G. Colbum NRC Project Manager, Mr. E. M. Thomas (6'
OPERATING DATA REPORT DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-387 One 8-14-02 J. J. Hennings (570) 542-3747 OPERATING STATUS
- 1. Unit Name:
Susquehanna Steam Electric Station (UI)
- 2. Reporting Period:
June 2002
- 3. Design Electrical Rating (Net MWe):
1115
- 4. Maximum Dependable Capacity (Net MWe):
1105 Hours in Reporting Period Number of Hours Reactor Was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)
This Month 720 720 720 0
792,065*
Yr.-to-Date 4,343 3,145.3 3,076.8 0
3,163,556*
Cumulative 167,112 137,447.5 135,236.8 0
138,390,465*
Corrected Page:
- Item 9, Net Electrical Energy Generated (MWH) was previously reported incorrectly in PLA 05499 dated July 12, 2002. This correction for the month of June 2002 does not impact the Monthly Operating Reports for July, 2002 (PLA-005513).
Page 1 of I
- 5.
- 6.
- 7.
- 8.
9 NOTES:
UNIT SHUTDOWNS DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-387 One 7/8/02 J. J. Hennings (570) 542-3747 REPORT MONTH June 2002 I.
F. Forced S. Scheduled
- 2.
Reason:
A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)
- 3.
Method:
I - Manual 2 - Manual Scram 3 - Automatic Scram 4-Continuation from previous month 5-Other Page 1 of I No.
Date Type Duration Reason Method of Cause & Corrective Action S(Hours) 2 Shutting To Prevent Recurrence Down Reactor 3 No Shutdowns this month.
Summary:
The only significant power reduction was for a planned control rod sequence exchange on 6/15/2002. Operational testing of Unit 1 was performed on May 30, to allow operation at the new uprated Reactor power of 3489 MWth. All reporting numbers are now based on 3489 MWTH as 100% core thermal power.
SUSQUEHANNA STEAM ELECTRIC STATION Docket Number:
50-387 Completed by:
J. J. Hennings Date: 7-8-02 Telephone:
(570) 542-3747 Challenges to Main Steam Safety Relief Valves None.
OPERATING DATA REPORT NDOCKET NO.
50-388 UNIT Two DATE 7-8-02 COMPLETED BY J. J. Hennings TELEPHONE (570) 542-3747 OPERATING STATUS
- 1. Unit Name:
Susquehanna Steam Electric Station (U2)
- 2. Reporting Period:
June 2002
- 3. Design Electrical Rating (Net MWe):
1117
- 4. Maximum Dependable Capacity (Net MWe):
1111 Hours in Reporting Period Number of Hours Reactor Was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)
This Month 720 720 720 0
789,837*
Yr.-to-Date 4,343.0 4,343.0 4,343.0 0
4,804,749*
Cumulative 152,352 132,000.0 130,109.7 0
135,609,579*
Corrected Page:
Item 9, Net Electrical Energy Generated (MWH) was previously reported incorrectly in PLA-05499 dated July 12, 2002. This correction for the month of June 2002 does not impact the Monthly Operating Report for July 2002 (PLA-005513).
Page 1 of 1
- 5.
- 6.
- 7.
- 8.
9.
NOTES:
UNIT SHUTDOWNS DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 7-8-02 J. J. Hennings (570) 542-3747 REPORT MONTH June 2002
- 1.
- 2.
3.
Reason:
A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)
Method:
1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5-Other Page 1 of 1 No.
Date Type Duration Reason Method Cause & Corrective Action (Hours) 2 of to Prevent Recurrence Shutting Down Reactor 3
No Shutdowns this month.
F. Forced S. Scheduled
SUSQUEHANNA STEAM ELECTRIC STATION Docket Number:
50-388 Completed by:
J. J. Hennings Date: 7-8-02 Telephone:
(570) 542-3747 Challenges to Main Steam Safety Relief Valves None.