MONTHYEARML24298A0552024-10-30030 October 2024 Response to Alternative RR-10, Auxiliary Feedwater Valve Testing IR 05000282/20244032024-10-25025 October 2024 – Security Baseline Inspection Report 05000282/2024403 and 05000306/2024403 05000282/LER-2024-001-01, Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies2024-10-22022 October 2024 Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies L-PI-24-044, Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-10-21021 October 2024 Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program ML24277A1012024-10-0303 October 2024 Closure of Interim Report of a Potential Deviation or Failure to Comply Associated with Bentley Systems Incorporated Autopipe Software ML24221A3622024-09-27027 September 2024 Issuance of Amendment Nos. 245 and 233 Revise Technical Specification 3.8.1, AC Sources-Operating, Surveillance Requirement 3.8.1.2, Note 3 ML24241A1682024-09-23023 September 2024 Transmittal Letter Amendment No. 13 to Materials License No. Special Nuclear Material-2506 for the Prairie Island Independent Spent Fuel Storage Installation 05000282/LER-2024-001, Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies2024-09-16016 September 2024 Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies IR 05000282/20243012024-09-13013 September 2024 NRC Initial License Examination Report 05000282/2024301 and 05000306/2024301 IR 05000282/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Prairie Island Nuclear Generating Plant, Units 1 and 2 (Report 05000282/2024005 and 05000306/2024005) L-PI-24-040, Post-Submittal Package Letter2024-08-23023 August 2024 Post-Submittal Package Letter IR 05000282/20245012024-08-0505 August 2024 Emergency Preparedness Inspection Report 05000282/2024501 and 05000306/2024501 ML24213A1592024-07-31031 July 2024 Operator Licensing Examination Approval - Prairie Island Nuclear Generating Plant IR 05000282/20240022024-07-30030 July 2024 Integrated Inspection Report 05000282/2024002 and 05000306/2024002 ML24208A1502024-07-26026 July 2024 Independent Spent Fuel Storage Installation - Submittal of Quality Assurance Topical Report (NSPM-1) ML24197A2012024-07-15015 July 2024 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000282/2024004 IR 05000282/20240102024-06-28028 June 2024 Comprehensive Engineering Team Inspection Report 05000282/2024010 and 05000306/2024010 L-PI-24-036, – Preparation and Scheduling of Operator Licensing Examinations2024-06-28028 June 2024 – Preparation and Scheduling of Operator Licensing Examinations ML24158A5912024-06-0606 June 2024 CFR 50.46 LOCA Annual Report L-PI-24-031, Independent Spent Fuel Storage Installation, Supplement to License Amendment Request to Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2)2024-06-0505 June 2024 Independent Spent Fuel Storage Installation, Supplement to License Amendment Request to Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2) L-PI-24-014, License Amendment Request to Revise the Technical Specification Definition of Reactor Trip System (RTS) Response Time and Apply Response Time Testing to RTS Trip Functions with Time Delay Assumption2024-06-0303 June 2024 License Amendment Request to Revise the Technical Specification Definition of Reactor Trip System (RTS) Response Time and Apply Response Time Testing to RTS Trip Functions with Time Delay Assumption 05000306/LER-2024-001-01, Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump2024-05-31031 May 2024 Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump ML24155A1922024-05-31031 May 2024 Refueling Outage Unit 2 R33 Owners Activity Report for Class 1, 2, 3 and Mc Inservice Inspections ML24149A3712024-05-29029 May 2024 (Ping) - Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection ML24262A1992024-05-29029 May 2024 L-PI-24-018 PINGP 75 Day Letter L-PI-24-030, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.12024-05-22022 May 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.1 ML24141A1292024-05-22022 May 2024 Northern States Power Company - Use of Encryption Software for Electronic Transmission of Safeguards Information ML24141A0452024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML24128A2572024-05-16016 May 2024 ISFSI A13 Acceptance Letter IR 05000282/20240012024-05-15015 May 2024 Integrated Inspection Report 05000282/2024001 and 05000306/2024001 ML24130A2362024-05-0909 May 2024 Independent Spent Fuel Storage Installation - 2023 Annual Radiological Environmental Monitoring Program Report ML24130A2392024-05-0909 May 2024 2023 Annual Radioactive Effluent Report ML24071A1162024-05-0101 May 2024 Issuance of Amendment Nos. 244 and 232 Revise TS 3.7.8, Cooling Water (Cl) System ML24128A0882024-04-30030 April 2024 Submittal of Updated Safety Analysis Report (Usar), Revision 38 05000306/LER-2024-001, Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump2024-04-29029 April 2024 Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump ML24089A2382024-04-29029 April 2024 Summary of Nuclear Property Insurance IR 05000282/20244012024-04-25025 April 2024 – Security Baseline Inspection Report 05000282/2024401 and 05000306/2024401 ML24100A8042024-04-24024 April 2024 – Alternative Request RR-09 for Safety Injection and Volume Control System Category C Check Valve Inservice Testing ML24114A0882024-04-23023 April 2024 Annual Report of Individual Monitoring for the Prairie Island Nuclear Generating Plant (PINGP) ML24113A1182024-04-12012 April 2024 NRC Letter Re NRC Office of Investigations Report No. 3-2023-004 ML24100A1212024-04-0909 April 2024 Submittal of Revised Pressure and Temperature Limits Report ML24093A2832024-04-0202 April 2024 Nuclear Material Transaction Report L-PI-24-012, Independent Spent Fuel Storage Installation - License Amendment Request: Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2)2024-04-0202 April 2024 Independent Spent Fuel Storage Installation - License Amendment Request: Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2) ML24089A2402024-03-29029 March 2024 Guarantee of Payment of Deferred Premiums ML24060A1232024-03-27027 March 2024 To Request 1-RR-5-10 and 2-RR-5-10 Regarding Reactor Pressure Vessel Welds and Nozzle Welds 05000282/LER-2023-001-01, Reactor Trip, Auxiliary Feedwater and Emergency Service Water System Actuation Due to Electrical Transient in DC Control Power Cables2024-03-21021 March 2024 Reactor Trip, Auxiliary Feedwater and Emergency Service Water System Actuation Due to Electrical Transient in DC Control Power Cables ML24262A1512024-03-15015 March 2024 L-PI-24-011 150 Day Letter 2024 PINGP ILT NRC Exam ML24010A0582024-03-0505 March 2024 Amendment No. 12 to Materials License No. Special Nuclear Material-2506 for the Prairie Island Independent Spent Fuel Storage Installation L-PI-24-004, Independent Spent Fuel Storage Installation - Annual Effluent Report, January Through December 20232024-02-29029 February 2024 Independent Spent Fuel Storage Installation - Annual Effluent Report, January Through December 2023 IR 05000282/20230062024-02-28028 February 2024 Annual Assessment Letter for Prairie Island Nuclear Generating Plant, Units 1 and 2 (Report 05000282/2023006 and 05000306/2023006) 2024-09-27
[Table view] Category:Meeting Summary
MONTHYEARML24149A1632024-05-29029 May 2024 Summary of the May 8, 2024 Public Outreach to Discuss the NRC 2023 End-of-Cycle Plant Performance Assessment of Prairie Island Nuclear Generating Plant, Units 1 and 2 ML24088A1012024-03-29029 March 2024 Summary of March 6, 2024, Public Meeting with NSPM Regarding Planned LAR to Modify Technical Specifications Definitions and Incorporate Plant-Specific Methods for Response Time Testing for Prairie Island Nuclear Plant, Units 1 & 2 ML24043A0952024-02-21021 February 2024 Summary of January 31, 2024, Public Meeting with Xcel Energy to Discuss Amendment Application for Prairie Island Independent Spent Fuel Storage Installation ML23184A0862023-07-11011 July 2023 6/23/2023 Summary of Pre Application Public Meeting with Xcel Energy on Prairie Island ISFSI Amendment Application ML23179A2102023-06-28028 June 2023 Summary of June 5, 2023, Public Meeting with Northern States Power Company Regarding Neutron Fluence Values for Reactor Pressure Vessel Welds ML23157A0232023-06-0606 June 2023 Summary of the May 24, 2023, Public Outreach to Discuss the NRC 2022 End-of-Cycle Plant Performance Assessment of Prairie Island Nuclear Generating Plant, Units 1 and 2 ML23123A3942023-05-15015 May 2023 Summary of Public Meeting with Northern States Power Company Regarding Planned License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water System ML22130A7172022-05-10010 May 2022 Summary of the May 3, 2022, Public Outreach to Discuss the NRC 2021 End-Of-Cycle Plant Performance Assessment of Monticello and Prairie Island Nuclear Generating Plant, Units 1 and 2 ML21294A0442021-11-0808 November 2021 Summary of Meeting with Northern States Power Company, Doing Business as Xcel Energy, Related to a License Amendment to Extended the Allowed Outage Time for the Vertical Motor Driven Cooling Water System Pump ML21229A1692021-08-23023 August 2021 Summary of August 11, 2021, Meeting with Northern States Power Company, Doing Business as Xcel Energy, Related to a Planned License Amendment Allow Bypass Testing of the Power Range Nuclear Instrumentation System Channels ML21167A1842021-06-16016 June 2021 Summary of the June 9, 2021, Public Outreach to Discuss the NRC 2020 End-Of-Cycle Plant Performance Assessment of Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant, Units 1 and 2 ML21137A1042021-05-20020 May 2021 Summary of May 6, 2021, Meeting with Northern States Power Company, Doing Business as Xcel Energy, Related to a Planned License Amendment to Transition to a 24 Month Operating Cycle ML21040A4612021-02-11011 February 2021 Summary of February 3, 2021, Meeting with Northern States Power Company, Doing Business as Xcel Energy, Related to a Planned License Amendment to Combine the Emergency Plans and Create a Common Emergency Operations Facility ML20296A2382020-11-0303 November 2020 Summary of Meeting with Northern States Power Company, Doing Business as Xcel Energy, Related to the License Amendment to Adopt TSTF-505 Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML20274A2442020-10-16016 October 2020 Summary of 9/23/2020 Meeting with Northern States Power Co., Doing Business as Xcel Energy, on Potential License Exemption Request Related to Biennal Emergency Preparedness Exercise for Prairie Island Nuclear Generating Plant, Units 1 & 2 ML20216A6452020-08-0303 August 2020 Summary of the July 16, 2020, Public Webinar to Discuss the NRC 2019 End-of-Cycle Plant Performance Assessment of the Prairie Island Generating Plant ML20114E2302020-04-23023 April 2020 Meeting Summary from Call with S. Beimers Mnshpo and NRC January 2020 Prairie Island ISFSI EA ML20111A1322020-04-21021 April 2020 April 9, 2020, Summary of Meeting with Northern States Power Company, Doing Business as Xcel Energy, on Potential License Amendment Request Related to Adopt TSTF-569 at Prairie Island Nuclear Generating Plant, Unit 1 and 2 ML20057D3912020-03-0909 March 2020 Summary of February 18, 2020, Meeting with Northern States Power Company, Doing Business as Xcel Energy, on Potential License Ament Request Related to Low Temperature Overpressurization Protection ML19347D1592020-01-0707 January 2020 Summary of December 12, 2019, Meeting with Northern States Power Co., Doing Business as Xcel Energy, and Tennessee Valley Authority Planned License Amendment Requests for Prairie Island, Units 2 and 2, and Watts Bar, Units 1 and 2 ML19289A5322019-10-28028 October 2019 Summary of September 26, 2019, Teleconference with Northern States Power Company on Potential License Amendment Request to Adopt TSTF-505, Revision 2 ML19210D5432019-08-20020 August 2019 Summary of Teleconference with Northern States Power Company on Potential License Amendment Request to Adopt Probabilistic Risk Assessment Model ML19136A0272019-05-15015 May 2019 Memorandum to C. Regan Summary of March 28, 2019, Public Meeting with Xcel Energy to Discuss Seismic Consideration for a Proposed License Amendment Increasing the Amount of Special Nuclear Material Authorized for Storage at Prairie Island I ML19058A4672019-03-11011 March 2019 Summary of Meeting with Northern States Power Company, Doing Business as Xcel Energy, Related to the Amendment Request to Modify Renewed Facility Operating License Paragraph 2.C(4)(c) ML18065A5582018-03-12012 March 2018 Summary of February 20, 2018, Teleconference with Northern States Power Company, Doing Business as Xcel Energy, on Potential License Amendment Request to Adopt TSTF-425 ML17341A1292017-12-11011 December 2017 Summary of Meeting with Northern States Power Company, Doing Business as Xcel Energy, on Changes to the Security Plans at the Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant, Units 1 and 2 ML17261B0362017-09-25025 September 2017 Meeting with Northern States Power Company, Doing Business as Xcel Energy, on Potential Digital Feedwater Modifications at Prairie Island Nuclear Generating Plant, Units 1 and 2 ML17235B1802017-08-23023 August 2017 Summary of Open House to Discuss the 2016 End-Of-Cycle Plant Performance Assessment of Prairie Island ML17209A1192017-07-17017 July 2017 Summary of July 17, 2017, Meeting with Northern States Power Company, Doing Business as Xcel Energy, on Potential License Amendment Request Related to Heavy Lifting Devices L-PI-17-014, Summary of Public Meeting and Plan for NRC Request for Additional Information Regarding License Amendment Request for Spent Fuel Pool Criticality Technical Specification Changes (CAC Nos. MF7121...2017-04-19019 April 2017 Summary of Public Meeting and Plan for NRC Request for Additional Information Regarding License Amendment Request for Spent Fuel Pool Criticality Technical Specification Changes (CAC Nos. MF7121... ML17093A6012017-04-0606 April 2017 March 9, 2017, Summary of Meeting with Northern States Power Company, Doing Business as Xcel Energy, Related to the Spent Fuel Pool Criticality License Amendment Request ML17034A1202017-02-0909 February 2017 Summary of January 24, 2017, Meeting with Northern States Power Company, Doing Business as Xcel Energy, on Potential Revision to the Emergency Action Level ML16111B1912016-04-28028 April 2016 Summary of Meeting with Northern States Power Company, a Minnesota Corporation, Doing Business as Xcel Energy, on National Fire Protection Association (NFPA) 805 License Amendment Request ML15271A2072015-10-0202 October 2015 July 9, 2015 Summary of Closed Meeting Between Representatives of the U.S. Army Corps of Engineers, U.S, Nuclear Regulatory Commission and Northern States Power Company- Minnesota to Discuss Flood Analysis Associated with Monticello Nuclear ML15141A5092015-05-21021 May 2015 Meeting Summary with Public to Discuss the Results of the 2014 Problem Identification and Resolution Inspection for Prairie Island Nuclear Generating Plant ML15107A0592015-05-15015 May 2015 Summary of the April 14, 2015, Public Meeting with Xcel Energy and Westinghouse to Discuss a Future License Amendment Request Regarding the Use of Ifba Rods in Nuclear Fuel at the Prairie Island Nuclear Generating Plant ML15131A4482015-05-0707 May 2015 Reactor Oversight Process Task Force FAQ Log - April 16, 2015 ML14220A2832014-09-0808 September 2014 Summary of August 5, 2014, Closed Meeting Between Representatives of the U.S. Army Corps of Engineers, NRC, and Northern States Power Company - Minnesota to Discuss Flooding Analysis Associated with Monticello and Prairie Island Nuclear Gen ML14223A8012014-08-11011 August 2014 Public Meeting Summary to Discuss the 2013 Performance of Prairie Island Nuclear Generating Plant Units 1 and 2 ML14227A8852014-07-0202 July 2014 E-mail P Longmire, NRC, Re e-mail Fr Samuel Chesnutt, Xcel Energy, Re Meeting Summary for the June 16, 2014 Prairie Island ISFSI License Renewal Application RAI Discussion ML14153A0252014-06-20020 June 2014 Meeting Summary - Public Meeting on May 16, 2014, to Discuss Xcel Energy'S Flood Hazard Reevaluation Extension Request for the Monticello and Prairie Island Nuclear Generating Plants ML14168A0182014-05-16016 May 2014 Xcel Energy Responses to NRC Questions Regarding Flood Hazard Reevaluation Report Extension Requests ML14056A4942014-03-10010 March 2014 Summary of the February 19, 2014, Pre-Application Meeting to Discuss the Diesel Generator Voltage and Frequency Limits License Request ML13210A3022013-07-29029 July 2013 Summary of Public Meeting with Northern States Power Company to Discuss the 2012 Prairie Island Nuclear Generating Plant End-of-Cycle Performance Assessment ML13171A2472013-06-20020 June 2013 7/11/2013 - Notice of Public Meeting to Discuss 2012 End-Of-Cycle Performance Assessment for Prairie Island Nuclear Generating Plant, Units 1 and 2 ML13004A3722013-01-11011 January 2013 December 6, 2012, Summary of Meeting to Discuss the Licensee'S Proposed FLEX Strategy in Response to NRC Order EA-12-049 ML12326A9702012-11-21021 November 2012 Summary of October 24, 2012, Meeting with the Northern States Power Company, D/B/A Excel Energy Regarding Security Requirements and Changes Pertaining to Prairie Island TAC L24689 W/ Encl 1 (Attendees) and Encl 2 (Agenda) ML12292A4202012-11-0707 November 2012 September 27, 2012 - Summary of Pre-Application Meeting to Discuss the Diesel Generator Voltage and Frequency Limits License Amendment Request ML12214A2332012-07-31031 July 2012 July 17, 2012 Summary of Public Meeting to Discuss the Prairie Island Nuclear Generating Plant, Units 1 and 2, End-of-Cycle Plant Performance Assessment ML12121A5842012-05-17017 May 2012 Meeting Summary with Northern States Power Co, to Discuss the National Fire Protection Association Standard 805 (NFPA 805) License Amendment Request 2024-05-29
[Table view] |
Text
August 23, 2002 Mr. Mano Nazar Site General Manager Prairie Island Nuclear Generating Plant Nuclear Management Company, LLC 1717 Wakonade Drive East Welch, MN 55089
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
PRAIRIE ISLAND NUCLEAR GENERATING PLANT
Dear Mr. Nazar:
On July 31, 2002, the NRC staff completed its mid-cycle plant performance assessment of the Prairie Island Nuclear Generating Plant. In accordance with NRC Inspection Manual Chapter 0305, Operating Reactor Assessment Program, the mid-cycle review involved the participation of all technical divisions in evaluating the performance of your Prairie Island facility for the first half of the current assessment cycle, January 1 - December 31, 2002. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility so that you will have an opportunity to prepare for these inspections and to inform us of any planned inspections which may conflict with your plant activities.
Plant performance for the most recent quarter for Unit 1 and Unit 2 was within the Regulatory Response Column of the NRCs Action Matrix, based on all PIs indicating performance at a level requiring no additional NRC oversight (Green) and one inspection finding regarding the lubrication water source for the safety-related cooling (service) water pumps that was an issue with increased importance to safety, which may require additional NRC inspections (White).
A Supplemental Inspection using procedure 95001 was conducted in April 2002 to review this finding and the results of that inspection were transmitted to you in Inspection Report 50-282/02-03(DRS); 50-306/02-03(DRS), dated May 9, 2002. No additional inspections will be conducted pertaining to this finding. Therefore, we plan to conduct only baseline inspections at your facility through September 30th, 2003.
The enclosed inspection plan details the inspections scheduled through September 30, 2003.
The inspection plan is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.
The inspections scheduled in the last 6 months of the inspection plan are tentative and may be revised at the end-of-cycle review.
In addition, the NRC is in the process of finalizing a Temporary Instruction that will be used to review implementation of the Interim Compensatory Measures required by the Agencys
M. Nazar Security Order to all commercial nuclear power plants dated February 25, 2002. Schedules have not yet been finalized, but it is anticipated that these inspections will begin within the next calendar quarter. Once finalized, the details will be communicated by separate correspondence.
In accordance with 10 CFR 2.790 of the NRCs Rule of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Roger Lanksbury of my staff at (630) 829-9631 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA by Steve Reynolds acting for/
Geoffrey E. Grant, Director Division of Reactor Projects Docket Nos. 50-282; 50-306 License Nos. DPR-42; DPR-60
Enclosure:
Prairie Island Inspection/Activity Plan See Attached Distribution
M. Nazar Security Order to all commercial nuclear power plants dated February 25, 2002. Schedules have not yet been finalized, but it is anticipated that these inspections will begin within the next calendar quarter. Once finalized, the details will be communicated by separate correspondence.
In accordance with 10 CFR 2.790 of the NRCs Rule of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Roger Lanksbury of my staff at (630) 829-9631 with any questions you may have regarding this letter or the inspection plan.
Sincerely, Geoffrey E. Grant, Director Division of Reactor Projects Docket Nos. 50-282; 50-306 License Nos. DPR-42; DPR-60
Enclosure:
Prairie Island Inspection/Activity Plan See Attached Distribution DOCUMENT NAME: G:\Branch TSS\midcycle2002\inspectionplnltrs-02\pra-inspectionplnltr.wpd To receive a copy of this document, indicate in the box "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII RIII NAME MKunowski:co RLanksbury GGrant DATE 08/ /02 08/ /02 08/ /02 OFFICIAL RECORD COPY
M. Nazar cc w/encl: Plant Manager, Prairie Island R. Anderson, Executive Vice President and Chief Nuclear Officer Site Licensing Manager Nuclear Asset Manager J. Malcolm, Commissioner, Minnesota Department of Health State Liaison Officer, State of Wisconsin Tribal Council, Prairie Island Dakota Community J. Silberg, Esquire Shawn, Pittman, Potts, and Trowbridge A. Neblett, Assistant Attorney General Office of Attorney General S. Bloom, Administrator Goodhue County Courthouse Commissioner, Minnesota Department of Commerce K. Kuhlmann, Council Administrator A. Kohnen, President, Prairie Island Community Center F. Wipperling, Goodhue County Sheriff G. Brown, Emergency Management Director R. Wilhelm, Chair, Pierce County Board of Directors D. Maher, Chair, Dakota County Board of Commissioners The Honorable V. Steffenhagen G. Fried, Emergency Management Director R. Mallon, Chair, Goodhue County Board of Commissioners J. Hines, Pierce County Sheriff D. Gudmundson, Dakota County Sheriff INPO
M. Nazar ADAMS Distribution:
WDR DFT H. Nieh, OEDO THB Project Director, NRR Project Manager, NRR RidsNrrDipmlipb J. Caldwell, RIII G. Grant, RIII B. Clayton, RIII R. Lickus, RIII SRI Prairie Island DRP III DRSIII PLB1 JRK1
Page 1 of 2 Prairie Island 08/26/2002 12:54:16 Inspection / Activity Plan Report 22 09/01/2002 - 09/30/2003 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type CONTA&B - SAFEGUARDS INSPECTION-CONTNGCY-TEST&ADMN 1 1, 2 IP 7113003 Response to Contingency Events (Protective Strategy and Implementation of Protective Strategy) 09/23/2002 11/22/2002 Baseline Inspections IP 71122 - LIQ/GASEOUS RAD EFFLUENTS INSPECTION 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 09/30/2002 10/11/2002 Baseline Inspections 1, 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 09/30/2002 10/11/2002 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 09/30/2002 10/11/2002 Baseline Inspections IP 71121 - OUTAGE ALARA INSPECTION 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 11/04/2002 11/08/2002 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 11/04/2002 11/08/2002 Baseline Inspections ISI - ISI FOR UNIT 1 1 1 IP 7111108 Inservice Inspection Activities 11/18/2002 12/06/2002 Baseline Inspections ISI - TI-145 FOR UNIT 1 1 1 IP 2515/145 Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles (NRC Bulletin 2001-01) 11/18/2002 12/06/2002 Safety Issues MR - MAINTENANCE RULE (DRS) 1 1, 2 IP 7111112B Maintenance Effectiveness 02/10/2003 02/14/2003 Baseline Inspections IP 71122 - RAD ENVIRONMENTAL MONITORING INSPECTION 1 1 IP 7112101 Access Control to Radiologically Significant Areas 02/10/2003 02/14/2003 Baseline Inspections 1, 2 IP 7112203 Radiological Environmental Monitoring Program 02/10/2003 02/14/2003 Baseline Inspections 1 IP 71151 Performance Indicator Verification 02/10/2003 02/14/2003 Baseline Inspections SSDI - SAFETY SYSTEM DESIGN 6 1, 2 IP 7111121 Safety System Design and Performance Capability 03/24/2003 04/11/2003 Baseline Inspections INSP - EP NON-EXERCISE INSPECTION 1 1, 2 IP 7111402 Alert and Notification System Testing 03/17/2003 03/21/2003 Baseline Inspections 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 03/17/2003 03/21/2003 Baseline Inspections 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 03/17/2003 03/21/2003 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 03/17/2003 03/21/2003 Baseline Inspections INSP - NUCLEAR INSTRUMENTATION INSPECTION 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 05/19/2003 05/23/2003 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 05/19/2003 05/23/2003 Baseline Inspections 71111.11 - LIC OPERATOR REQUAL PROGRAM EVALUATION 2 1, 2 IP 7111111B Licensed Operator Requalification 07/28/2003 08/01/2003 Baseline Inspections FY 2003 - PRAIRIE ISLAND INIT PREP 08/2003 3 1 W90083 OL - INITIAL EXAM - PRAIRIE ISLAND - AUG/SEP 2003 08/11/2003 08/15/2003 Not Applicable This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 2 Prairie Island 08/26/2002 12:54:16 Inspection / Activity Plan Report 22 09/01/2002 - 09/30/2003 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type DRPBR5 - PI&R INSPECTION 3 1, 2 IP 71152B Identification and Resolution of Problems 08/18/2003 09/05/2003 Baseline Inspections FY 2003 - PRAIRIE ISLAND INIT EXAM 09/2003 3 1 W90083 OL - INITIAL EXAM - PRAIRIE ISLAND - AUG/SEP 2003 09/08/2003 09/19/2003 Not Applicable ISI - ISI FOR UNIT 2 1 2 IP 7111108 Inservice Inspection Activities 09/15/2003 09/26/2003 Baseline Inspections ISI - TI-145 FOR UNIT 2 1 2 IP 2515/145 Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles (NRC Bulletin 2001-01) 09/15/2003 09/26/2003 Safety Issues INSP - ALARA INSPECTION 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 09/29/2003 10/03/2003 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 09/29/2003 10/03/2003 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 09/29/2003 10/03/2003 Baseline Inspections This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.