Sequoyah Inspection / Activity Plan 09/01/2002 - 09/30/2003 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/26/2002 13:04:10 Report 22 2
OL-EP
- EMERGENCY EXERCISE Baseline Inspections 09/30/2002 10/04/2002 Exercise Evaluation IP 7111401 1, 2 Baseline Inspections 09/30/2002 10/04/2002 Emergency Action Level and Emergency Plan Changes IP 7111404 1, 2 Baseline Inspections 09/30/2002 10/04/2002 Performance Indicator Verification IP 71151 1, 2 1
- ISFSI CONSTRUCTION Other Routine 10/28/2002 10/30/2002 On-Site Fabrication Of Components And Construction On An ISFSI IP 60853 1, 2 2
PS-SEC
- SECURITY Baseline Inspections 10/28/2002 11/01/2002 Response to Contingency Events (Protective Strategy and Implementation of Protective Strategy)
IP 7113003 1, 2 2
EB2-MR
- MAINTENANCE RULE Baseline Inspections 11/11/2002 11/15/2002 Maintenance Effectiveness IP 7111112B 1, 2 3
OL-PREP
- INITIAL EXAM PREP Not Applicable 11/12/2002 11/15/2002 SEQUOYAH/EXAMS AT POWER FACILITIES V23203 1
1 PS-RP
- RADIATION PROTECTION Baseline Inspections 11/12/2002 11/15/2002 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 11/12/2002 11/15/2002 Performance Indicator Verification IP 71151 1, 2 3
OL-EXAM
- INITIAL EXAM Not Applicable 12/02/2002 12/06/2002 SEQUOYAH/EXAMS AT POWER FACILITIES V23203 1
1 PS-RP
- RADIATION PROTECTION Baseline Inspections 12/09/2002 12/10/2002 Access Control to Radiologically Significant Areas IP 7112101 1, 2 1
EB1SSDPC - SSDPC PRE-INSPECTION VISIT Baseline Inspections 01/13/2003 01/17/2003 Safety System Design and Performance Capability IP 7111121 1, 2 1
PB6-FP
- FLOOD PROTECTION Baseline Inspections 01/13/2003 01/17/2003 Flood Protection Measures IP 7111106 1, 2 6
EB1SSDPC - SAFETY SYS DESIGN & PERFORMANCE CAPABILI Baseline Inspections 02/10/2003 02/14/2003 Safety System Design and Performance Capability IP 7111121 1, 2 Baseline Inspections 02/24/2003 02/28/2003 Safety System Design and Performance Capability IP 7111121 1, 2 1
EB2-SGRP
- SGRP-U1 Other Routine 03/16/2003 05/30/2003 Steam Generator Replacement Inspection IP 50001 1
1 EB2-ISI
- INSERVICE INSPECTION-U1 Baseline Inspections 03/24/2003 03/28/2003 Inservice Inspection Activities IP 7111108 1
3 PS-RP
- RADIATION PROTECTION Baseline Inspections 04/14/2003 04/18/2003 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 04/14/2003 04/18/2003 ALARA Planning and Controls IP 7112102 1, 2 Baseline Inspections 04/14/2003 04/18/2003 Radioactive Material Processing and Transportation IP 7112202 1, 2 Baseline Inspections 04/14/2003 04/18/2003 Performance Indicator Verification IP 71151 1, 2 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Sequoyah Inspection / Activity Plan 09/01/2002 - 09/30/2003 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/26/2002 13:04:10 Report 22 2
PS-RP
- RADIATION PROTECTION Baseline Inspections 05/12/2003 05/16/2003 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 05/12/2003 05/16/2003 ALARA Planning and Controls IP 7112102 1, 2 Baseline Inspections 05/12/2003 05/16/2003 Radioactive Material Processing and Transportation IP 7112202 1, 2 Baseline Inspections 05/12/2003 05/16/2003 Performance Indicator Verification IP 71151 1, 2 1
- EP INSPECTION Baseline Inspections 06/23/2003 06/27/2003 Alert and Notification System Testing IP 7111402 1, 2 Baseline Inspections 06/23/2003 06/27/2003 Emergency Response Organization Augmentation Testing IP 7111403 1, 2 Baseline Inspections 06/23/2003 06/27/2003 Emergency Action Level and Emergency Plan Changes IP 7111404 1, 2 Baseline Inspections 06/23/2003 06/27/2003 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 1, 2 Baseline Inspections 06/23/2003 06/27/2003 Performance Indicator Verification IP 71151 1, 2 1
EB2-HS
- HEAT SINK Baseline Inspections 07/07/2003 07/11/2003 Heat Sink Performance IP 7111107B 1, 2 3
- IDENTIFICATION AND RESOLUTION OF PROBLEM Baseline Inspections 07/14/2003 07/18/2003 Identification and Resolution of Problems IP 71152 1, 2 3
- IDENTIFICATION AND RESOLUTION OF PROBLEM Baseline Inspections 07/28/2003 08/01/2003 Identification and Resolution of Problems IP 71152 1, 2 3
EB2-MODS - MODIFICATIONS/10CFR50.59 Baseline Inspections 08/25/2003 08/29/2003 Evaluation of Changes, Tests, or Experiments IP 7111102 1, 2 Baseline Inspections 08/25/2003 08/29/2003 Permanent Plant Modifications IP 7111117B 1, 2 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.