Browns Ferry Inspection / Activity Plan 09/01/2002 - 09/30/2003 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/26/2002 13:02:12 Report 22 2
PS-SEC
- SECURITY Baseline Inspections 09/09/2002 09/13/2002 Access Authorization Program (Behavior Observation Only)
IP 7113001 1, 2, 3 Baseline Inspections 09/09/2002 09/13/2002 Access Control (Search of Personnel, Packages, and Vehicles: Identification and Authorization)
IP 7113002 1, 2, 3 Baseline Inspections 09/09/2002 09/13/2002 Performance Indicator Verification IP 71151 1, 2, 3 1
PB6LAYUP
- UNIT 1 SYSTEM LAYUP Other Routine 10/07/2002 10/11/2002 Review Of Quality Assurance For Extended Construction Delays IP 92050 1
1 EB1SSDPC - SSDPC PRE-INSPECTION VISIT Baseline Inspections 11/04/2002 11/09/2002 Safety System Design and Performance Capability IP 7111121 1, 2 1
PS-RP
- RADIATION PROTECTION Baseline Inspections 11/12/2002 11/15/2002 Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity IP 71111 1, 2, 3 Baseline Inspections 11/12/2002 11/15/2002 Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity IP 71111 1, 2, 3 Baseline Inspections 11/12/2002 11/15/2002 Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity IP 71111 1, 2, 3 3
OL PREP
- INITIAL EXAM PREP Not Applicable 11/18/2002 11/23/2002 BROWNS FERRY/EXAMS AT POWER FACILITIES V23202 1
6 EB1SSDPC - SAFETY SYS DESIGN & PERFORMANCE CAPABILI Baseline Inspections 12/09/2002 12/13/2002 Safety System Design and Performance Capability IP 7111121 1, 2, 3 1
PS-RP
- RADIATION PROTECTION Baseline Inspections 12/09/2002 12/10/2002 Access Control to Radiologically Significant Areas IP 7112101 1, 2, 3 3
OL-EXAM
- INITIAL EXAM Not Applicable 12/16/2002 12/20/2002 BROWNS FERRY/EXAMS AT POWER FACILITIES V23202 1
5 EB1SSDPC - SAFETY SYS DESIGN & PERFORMANCE CAPABILI Baseline Inspections 01/13/2003 01/17/2003 Safety System Design and Performance Capability IP 7111121 1, 2, 3 3
PS-RP
- RADIATION PROTECTION Baseline Inspections 02/24/2003 02/28/2003 Access Control to Radiologically Significant Areas IP 7112101 1, 2, 3 Baseline Inspections 02/24/2003 02/28/2003 ALARA Planning and Controls IP 7112102 1, 2, 3 Baseline Inspections 02/24/2003 02/28/2003 Radioactive Material Processing and Transportation IP 7112202 1, 2, 3 Baseline Inspections 02/24/2003 02/28/2003 Performance Indicator Verification IP 71151 1, 2, 3 1
EB2-ISI
- INSERVICE INSPECTION-U2 Baseline Inspections 03/03/2003 03/07/2003 Inservice Inspection Activities IP 7111108 2
2 PS-RP
- RADIATION PROTECTION Baseline Inspections 03/10/2003 03/14/2003 Access Control to Radiologically Significant Areas IP 7112101 1, 2, 3 Baseline Inspections 03/10/2003 03/14/2003 ALARA Planning and Controls IP 7112102 1, 2, 3 Baseline Inspections 03/10/2003 03/14/2003 Radioactive Material Processing and Transportation IP 7112202 1, 2, 3 Baseline Inspections 03/10/2003 03/14/2003 Performance Indicator Verification IP 71151 1, 2, 3 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Browns Ferry Inspection / Activity Plan 09/01/2002 - 09/30/2003 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/26/2002 13:02:12 Report 22 1
PB6-FP
- FLOOD PROTECTION Baseline Inspections 03/24/2003 03/28/2003 Flood Protection Measures IP 7111106 1, 2, 3 2
OL-EP
- EMERGENCY EXERCISE Baseline Inspections 06/02/2003 06/06/2003 Exercise Evaluation IP 7111401 1, 2, 3 Baseline Inspections 06/02/2003 06/06/2003 Emergency Action Level and Emergency Plan Changes IP 7111404 1, 2, 3 Baseline Inspections 06/02/2003 06/06/2003 Performance Indicator Verification IP 71151 1, 2, 3 1
EB2-MR
- MAINTENANCE RULE Baseline Inspections 07/07/2003 07/11/2003 Maintenance Effectiveness IP 7111112B 2, 3 6
EB1-TFP
- TFP - PRE-INSPECTION VISIT Baseline Inspections 08/18/2003 08/22/2003 Fire Protection IP 7111105T 1, 2 5
EB1-TFP
- TRIENNIAL FIRE PROTECTION INSP Baseline Inspections 09/08/2003 09/12/2003 Fire Protection IP 7111105T 1, 2, 3 Baseline Inspections 09/22/2003 09/24/2003 Fire Protection IP 7111105T 1, 2, 3 2
- REQUAL INSPECTION Baseline Inspections 09/15/2003 09/19/2003 Licensed Operator Requalification IP 7111111B 1, 2, 3 This report does not include INPO and OUTAGE activities.