August 23, 2002 Mr. William OConnor, Jr.

Vice President Nuclear Generation Detroit Edison Company 6400 North Dixie Highway Newport, MI 48166

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN FERMI 2 NUCLEAR POWER STATION

Dear Mr. OConnor:

On July 31, 2002, the NRC staff completed its mid-cycle plant performance assessment of Fermi 2 Nuclear Power Station. The mid-cycle review for Fermi 2 involved the participation of all technical divisions in evaluating performance indicators for the most recent quarter and inspection results for the period of January 1, 2002, through June 30, 2002. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility so that you will have an opportunity to prepare for these inspections and to inform us of any planned inspections which may conflict with your plant activities.

Plant performance for the most recent quarter was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all performance indicators indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct only baseline inspections at your facility through September 30, 2003.

The enclosed inspection plan details the inspections scheduled through September 30, 2003.

The inspection plan is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

The inspection plan for the last 6 months is tentative and may be revised at the end of cycle review.

In addition, the NRC is in the process of finalizing a Temporary Instruction that will be used to review implementation of the Interim Compensatory Measures required by the Agencys Security Order to all commercial nuclear power plants dated February 25, 2002. Schedules have not yet been finalized, but it is anticipated that these inspections will begin within the next calendar quarter. Once finalized, the details will be communicated by separate correspondence.

W. OConnor In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9703 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Mark A. Ring, Chief Branch 1 Division of Reactor Projects Docket No. 50-341 License No. NPF-43

Enclosure:

Fermi 2 Inspection/Activity Plan See Attached Distribution

DOCUMENT NAME: G:\Branch TSS\midcycle2002\inspectionplnltrs-02\Fer-inspectionplnltr.wpd To receive a copy of this document, indicate in the box "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII N RIII E NAME PPelke:co MRing DATE 08/ /02 08/ /02 OFFICIAL RECORD COPY

W. OConnor cc w/encl: N. Peterson, Director, Nuclear Licensing P. Marquardt, Corporate Legal Department Compliance Supervisor R. Whale, Michigan Public Service Commission Michigan Department of Environmental Quality Monroe County, Emergency Management Division Emergency Management Division MI Department of State Police R. Solomon, Chairman, Wayne County Board of Commissioners R. Ficano, Wayne County Sheriff M. Sparks, Director, Wayne County Emergency Management The Honorable Richard C. Jones The Honorable Christopher Carroll P. Lehr, City Administrator, Gibraltar D. Zorn, Monroe County Board Chairman T. Crutchfield, Monroe County Sheriff M. Yudasz, Jr., Emergency Management Director J. Heath, Director, Monroe County Health Department The Honorable C. D. Cappuccilli R. Hamilton, Monroe City Manager The Honorable Glenn Goodnight The Honorable Daniel G. Guzzi K. Laub, Rockwood City Administrator J. Spas, Frenchtown Charter Township Supervisor INPO

W. OConnor ADAMS Distribution:

CAC DFT H. Nieh, OEDO Project Director, NRR Project Mgr., NRR RidsNrrDipmlipb J. Caldwell, RIII G. Grant, RIII B. Clayton, RIII R. Lickus, RIII SRI Fermi DRPIII DRSIII PLB1 JRK1

Page 1 of 1 Fermi 08/26/2002 12:51:49 Inspection / Activity Plan Report 22 09/01/2002 - 09/30/2003 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type IP 71114 - BIENNIAL EP EXERCISE INSPECTION 3 2 IP 7111401 Exercise Evaluation 09/23/2002 09/27/2002 Baseline Inspections 2 IP 71151 Performance Indicator Verification 09/23/2002 09/27/2002 Baseline Inspections MR - MAINTENANCE RULE 1 2 IP 7111112B Maintenance Effectiveness 09/30/2002 10/03/2002 Baseline Inspections IP 71122 - REMP & UNCONDITIONAL RELEASE INSPECTION 1 2 IP 7112203 Radiological Environmental Monitoring Program 10/21/2002 10/25/2002 Baseline Inspections 2 IP 71151 Performance Indicator Verification 10/21/2002 10/25/2002 Baseline Inspections ICM TI - SAFEGUARDS INTERIM COMP MEASURES - ORDER 4 2 IP 7113003 Response to Contingency Events (Protective Strategy and Implementation of Protective Strategy) 11/04/2002 11/08/2002 Baseline Inspections FPI - TRIENNIAL FIRE PROTECTION 4 2 IP 7111105T Fire Protection 11/18/2002 12/06/2002 Baseline Inspections IP 71121 - RP ACCESS CTRL & ALARA INSPECTION 1 2 IP 7112101 Access Control to Radiologically Significant Areas 12/09/2002 12/13/2002 Baseline Inspections 2 IP 7112102 ALARA Planning and Controls 12/09/2002 12/13/2002 Baseline Inspections IP 71122 - LIQ/GASEOUS EFFLUENTS INSPECTION 1 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 02/03/2003 02/07/2003 Baseline Inspections FY 2003 - FERMI INIT PREP 02/2003 3 2 W90077 OL - INITIAL EXAM - FERMI 2 - FEB/MAR 2003 02/10/2003 02/14/2003 Not Applicable FY 2003 - FERMI INIT EXAM 03/2003 3 2 W90077 OL - INITIAL EXAM - FERMI 2 - FEB/MAR 2003 03/10/2003 03/21/2003 Not Applicable ISI - ISI FOR UNIT 2 1 2 IP 7111108 Inservice Inspection Activities 04/07/2003 04/11/2003 Baseline Inspections IP 71121 - RP OUTAGE ALARA & ACCESS CONTROL 1 2 IP 7112101 Access Control to Radiologically Significant Areas 04/07/2003 04/11/2003 Baseline Inspections 2 IP 7112102 ALARA Planning and Controls 04/07/2003 04/11/2003 Baseline Inspections SSDI - SAFETY SYSTEM DESIGN 6 2 IP 7111121 Safety System Design and Performance Capability 05/19/2003 06/06/2003 Baseline Inspections IP 71122 - RP RAM PROC/SHIPPING INSPECTION 1 2 IP 7112202 Radioactive Material Processing and Transportation 09/08/2003 09/12/2003 Baseline Inspections 2 IP 71151 Performance Indicator Verification 09/08/2003 09/12/2003 Baseline Inspections PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 3 2 IP 71152B Identification and Resolution of Problems 09/22/2003 10/10/2003 Baseline Inspections HT SNK B - HEAT SINK BIENNIAL 1 2 IP 7111107B Heat Sink Performance 09/22/2003 09/26/2003 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.