August 23, 2002 Mr. William OConnor, Jr.
Vice President Nuclear Generation Detroit Edison Company 6400 North Dixie Highway Newport, MI 48166
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN FERMI 2 NUCLEAR POWER STATION
Dear Mr. OConnor:
On July 31, 2002, the NRC staff completed its mid-cycle plant performance assessment of Fermi 2 Nuclear Power Station. The mid-cycle review for Fermi 2 involved the participation of all technical divisions in evaluating performance indicators for the most recent quarter and inspection results for the period of January 1, 2002, through June 30, 2002. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility so that you will have an opportunity to prepare for these inspections and to inform us of any planned inspections which may conflict with your plant activities.
Plant performance for the most recent quarter was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all performance indicators indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct only baseline inspections at your facility through September 30, 2003.
The enclosed inspection plan details the inspections scheduled through September 30, 2003.
The inspection plan is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.
The inspection plan for the last 6 months is tentative and may be revised at the end of cycle review.
In addition, the NRC is in the process of finalizing a Temporary Instruction that will be used to review implementation of the Interim Compensatory Measures required by the Agencys Security Order to all commercial nuclear power plants dated February 25, 2002. Schedules have not yet been finalized, but it is anticipated that these inspections will begin within the next calendar quarter. Once finalized, the details will be communicated by separate correspondence.
W. OConnor In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9703 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Mark A. Ring, Chief Branch 1 Division of Reactor Projects Docket No. 50-341 License No. NPF-43
Enclosure:
Fermi 2 Inspection/Activity Plan See Attached Distribution
DOCUMENT NAME: G:\\Branch TSS\\midcycle2002\\inspectionplnltrs-02\\Fer-inspectionplnltr.wpd To receive a copy of this document, indicate in the box "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII N RIII E
NAME PPelke:co MRing DATE 08/ /02 08/ /02 OFFICIAL RECORD COPY
W. OConnor cc w/encl:
N. Peterson, Director, Nuclear Licensing P. Marquardt, Corporate Legal Department Compliance Supervisor R. Whale, Michigan Public Service Commission Michigan Department of Environmental Quality Monroe County, Emergency Management Division Emergency Management Division MI Department of State Police R. Solomon, Chairman, Wayne County Board of Commissioners R. Ficano, Wayne County Sheriff M. Sparks, Director, Wayne County Emergency Management The Honorable Richard C. Jones The Honorable Christopher Carroll P. Lehr, City Administrator, Gibraltar D. Zorn, Monroe County Board Chairman T. Crutchfield, Monroe County Sheriff M. Yudasz, Jr., Emergency Management Director J. Heath, Director, Monroe County Health Department The Honorable C. D. Cappuccilli R. Hamilton, Monroe City Manager The Honorable Glenn Goodnight The Honorable Daniel G. Guzzi K. Laub, Rockwood City Administrator J. Spas, Frenchtown Charter Township Supervisor INPO
W. OConnor ADAMS Distribution:
CAC DFT H. Nieh, OEDO Project Director, NRR Project Mgr., NRR RidsNrrDipmlipb J. Caldwell, RIII G. Grant, RIII B. Clayton, RIII R. Lickus, RIII SRI Fermi DRPIII DRSIII PLB1 JRK1
Fermi Inspection / Activity Plan 09/01/2002 - 09/30/2003 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 1 08/26/2002 12:51:49 Report 22 3
- BIENNIAL EP EXERCISE INSPECTION Baseline Inspections 09/23/2002 09/27/2002 Exercise Evaluation IP 7111401 2
Baseline Inspections 09/23/2002 09/27/2002 Performance Indicator Verification IP 71151 2
1 MR
- MAINTENANCE RULE Baseline Inspections 09/30/2002 10/03/2002 Maintenance Effectiveness IP 7111112B 2
1 IP 71122
- REMP & UNCONDITIONAL RELEASE INSPECTION Baseline Inspections 10/21/2002 10/25/2002 Radiological Environmental Monitoring Program IP 7112203 2
Baseline Inspections 10/21/2002 10/25/2002 Performance Indicator Verification IP 71151 2
4 ICM TI
- SAFEGUARDS INTERIM COMP MEASURES - ORDER Baseline Inspections 11/04/2002 11/08/2002 Response to Contingency Events (Protective Strategy and Implementation of Protective Strategy)
4 FPI
- TRIENNIAL FIRE PROTECTION Baseline Inspections 11/18/2002 12/06/2002 Fire Protection IP 7111105T 2
1 IP 71121
- RP ACCESS CTRL & ALARA INSPECTION Baseline Inspections 12/09/2002 12/13/2002 Access Control to Radiologically Significant Areas IP 7112101 2
Baseline Inspections 12/09/2002 12/13/2002 ALARA Planning and Controls IP 7112102 2
1 IP 71122
- LIQ/GASEOUS EFFLUENTS INSPECTION Baseline Inspections 02/03/2003 02/07/2003 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201 2
3 FY 2003
- FERMI INIT PREP 02/2003 Not Applicable 02/10/2003 02/14/2003 OL - INITIAL EXAM - FERMI 2 - FEB/MAR 2003 W90077 2
3 FY 2003
- FERMI INIT EXAM 03/2003 Not Applicable 03/10/2003 03/21/2003 OL - INITIAL EXAM - FERMI 2 - FEB/MAR 2003 W90077 2
1 ISI
- ISI FOR UNIT 2 Baseline Inspections 04/07/2003 04/11/2003 Inservice Inspection Activities IP 7111108 2
1 IP 71121
- RP OUTAGE ALARA & ACCESS CONTROL Baseline Inspections 04/07/2003 04/11/2003 Access Control to Radiologically Significant Areas IP 7112101 2
Baseline Inspections 04/07/2003 04/11/2003 ALARA Planning and Controls IP 7112102 2
6 SSDI
- SAFETY SYSTEM DESIGN Baseline Inspections 05/19/2003 06/06/2003 Safety System Design and Performance Capability IP 7111121 2
1 IP 71122
- RP RAM PROC/SHIPPING INSPECTION Baseline Inspections 09/08/2003 09/12/2003 Radioactive Material Processing and Transportation IP 7112202 2
Baseline Inspections 09/08/2003 09/12/2003 Performance Indicator Verification IP 71151 2
3 PI&R
- PROBLEM IDENTIFICATION AND RESOLUTION Baseline Inspections 09/22/2003 10/10/2003 Identification and Resolution of Problems IP 71152B 2
1 HT SNK B
- HEAT SINK BIENNIAL Baseline Inspections 09/22/2003 09/26/2003 Heat Sink Performance IP 7111107B 2
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.