July 2002 Monthly Operating Report for Limerick Generating Station Units 1 and 2
ML022350417
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 08/15/2002
From: Braun R
Exelon Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002
Download: ML022350417 (3)


Text

-: --

-4 Exelokn Exelon Nuclear Limerick Generating Station PCO Box 2300 Sanatoga, PA 19464 www exeloncorp corn Nuclear T.S. 6.9.1.6 Aug. 15, 2002 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 Monthly Operating Reports for July 2002 Enclosed are the monthly operating reports for Limerick Units 1 and 2 for the month of July 2002 forwarded pursuant to Technical Specification 6.9.1.6 and the guidance of GL 97-02.

If you have any questions or require additional information, please do not hesitate to contact us.

Sincerely, 2,

L-----,

Robert C. Braun Plant Manager

-Attachments..

cc:

H. J. Miller, Administrator, Region I, USNRC A. L. Burritt, LGS USNRC Senior Resident Inspector

"-',1 p

I

,C,,.9/q)

I

Unit:

Docket No:

Date:

Completed by:

Telephone:

Limerick 1 50-352 8/15/02 Greg Lee (610)718-3707 A.

OPERATING DATA REPORT REPORTING PERIOD-July 2002 I Design Electrical Rating (MWe-Net) 11191 Maximum Dependable Capacity (MWe-Net) 1134 Mnnth Yenr to Date Cumulative Hours Reactor Critical (Hours) 744.0 4,640.2 126,195.4 Hours Generator On-Line (Hours) 744.0 4,572.0 124,236.1 Unit Reserve Shutdown Hours (Hours) 0.0 0.0 0.0 I 43S.666 Mo P*or-rinn Pn (M

h 8468 B.

UNIT SHUTDOWN No.

Date (yymmdd)

Type Duration Reason Method Corrective Actions/Comments (Hours)

None During July

SUMMARY

Unit 1 began the month of July 2002 at 100% of rated thermal power (RTP).

There were no power changes in July 2002 Unit 1 ended the month of July 2002 at 100% RTP Type F-Forced S-Scheduled Reason A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training/License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

Method 1 -Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation 5-Other (Explain)

C.. _

SAFETY/RELIEF VALVE OPERATION I ~

t,,t~~t I

A X I~JrA A ArII~T~fl I tlanxL.OlUILUII I L~b~.IILLI 4I O C!V IL.

I I...

II I'I LJOK7~~

Rant~

Io o

ii Descrptio oI U"

I I

i I Nit itr'trir'I Fnrrn, (MWh

I 5_n9.*,

UH I e't",0U;,0U,*"

I I

I I I%.Inn.'- l*hlrincl.llllV

Unit:

Docket No:

Date:

Completed by:

Telephone:

Limerick 2 50-353 8/15/02 Greg Lee (610)718-3707 A.

OPERATING DATA REPORT REPORTING PERIOD-July 2002 I Design Electrical Rating (MWe-Net) 11191 I

Maximum Dependable Capacity (MWe-Net) 1134 Mnnth IYear to Date Cumulative Hours Reactor Crtical (Hours) 678.5 5,021.5 102,454.5 Hours Generator On-Line (Hours) 656.1 4,999.1 100,762.0 I Unit Reserve Shutdown Hours (Hours)

"Net Electrical Energy (MWh) 0 I IMIT QLWI ITIlt1IM Ij tj n-nrfat 724.112 J

I

^

I ____,_-,___

Unit 2 endedthe month of July 2002 at 100% RTP.

Type Reason Method F-Forced A-Equipment Failure (Explain) 1-Manual S-Scheduled B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation E-Operator Training/License Examination 5-Other (Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

C. SAFETY/RELIEF VALVE OPERATION IDate Valves Actuated I No. & Type of Actuationo i

Plant Condition I Description of Event None Durnn July I,.

.. Jli Jl I

S,.1

)* I S.)%*/

VV I

  • No.

Date Type Duration Reason Method Corrective Actions/Comments (yrnmdd)

(Hours) 1 020723 F

84.9 A

2 2F31 Reactor scram due to loss of condenser vacuum.

SUMMARY

Unit 2 began the mo-nth of July 2002 at 100% of rated thermal power (RTP).

On July 23ru at 16:13 hours, reactor power was reduced due to decreasing condenser vacuum. At 16:32 hours and 74% RTP, th-emain turbine was manually tripped and the reactor was manually scrammed due to decreasing condenser vacuum.

UIJAI dJUY c-.U at ~..UI%/iia

    • -*IlVII*~

is.

On July 27' at 05:24 hours, the main generator was synchronized to the grid at 20% RTP. At 08:44 hours, the main generator was tripped for turbine overspeed testing. At 11:44 hours, the main generator was re synchronized to the grid at 18% RTP.

On July 28u' at 08:22 hours, reactor power was restored to 100% RTP. At 22:00 hours, reactor power was reduced from 97% to 78% RTP for rod pattern adjustment.

On July 29' at 03:11 hours, reactor power was restored to 100% RTP. At 23:00 hours, reactor power was reduced to 96% RTP ro perform troubleshooting of the Condenser Air Removal System.

On July 30ý at 00:09 hours, reactor power was restored to 100% RTP.

On July 3 1S', at 22:00 hours, reactor power was reduced to 98% RTP to repair the 2A recirculation pump

,.,,na.r,-.lla,r A+ O2t'S7 P,n, Irc rn=rftAr nowi~r wIl r*_tnrmd to 1 fll°/*, RTP.

n i i or-In t i nenn hn"re ront-Mr critirali was achieved U y 0

-*_e-IJlj UU I1 II 5.7651.169t I Ut I