Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity, 15-day Response
ML022340675
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 08/30/2002
From: John Lamb
NRC/NRR/DLPM/LPD3
To: Coutu T
Nuclear Management Co
References
BL-02-001, TAC MB4552
Download: ML022340675 (4)


Text

August 30, 2002 Mr. Thomas Coutu Site Vice President and Interim Plant Manager Kewaunee Nuclear Power Plant Nuclear Management Company, LLC N490 State Highway 42 Kewaunee, WI 54216

SUBJECT:

KEWAUNEE NUCLEAR POWER PLANT - BULLETIN 2002-01, REACTOR PRESSURE VESSEL HEAD DEGRADATION AND REACTOR COOLANT PRESSURE BOUNDARY INTEGRITY, 15-DAY RESPONSE (TAC NO. MB4552)

On March 18, 2002, the staff issued Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity, to the industry requesting that addressees provide information related to the structural integrity of the reactor coolant pressure boundary, including the reactor pressure vessel head, and the extent to which inspections have been undertaken to satisfy applicable regulatory requirements.Bulletin 2002-01 also required licensees to provide the basis for concluding that plans for future inspections of the reactor coolant pressure boundary will satisfy applicable regulatory requirements at their respective pressurized water reactor plants. All addressees were requested to respond to Items 1.A.

through E. within 15 days of the Bulletins issuance, or to provide a written response to the Nuclear Regulatory Commission in accordance with the provisions of Title 10, Section 50.54(f),

of the Code of Federal Regulations (10 CFR 50.54(f)) if they are unable to provide the information or they can not meet the requested completion dates.

You provided your 15-day Bulletin response by letter dated April 2, 2002. The staff finds that you have provided the requested information, and has concluded that your plant does not appear to have conditions similar to those which lead to the degradation at Davis-Besse.

However, the staff may issue questions to confirm or verify the information that was provided in your 15-day response to Bulletin 2002-01.

We will complete a full review of your response to Bulletin 2002-01 after we review your response to Items 2 and 3 of the Bulletin.

Sincerely,

/RA/

John G. Lamb, Project Manager, Section 1 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-305 cc: See next page

ML022340675 OFFICE PDIII-1/PM PDIII-1/LA EMCB PDIII-1/SC NAME JLamb THarris SBloom LRaghavan /RA/ by DHood DATE 08/29/02 08/29/02 08/29/02 08/30/02

Kewaunee Nuclear Power Plant cc:

John H. ONeill, Jr.

Shaw Pittman, Potts & Trowbridge 2300 N. Street, NW Washington, DC 20037-1128 David Zellner Town Chairman - Town of Carlton N2164 County B Kewaunee, WI 54216 Larry L. Weyers Chairman, President, and CEO Wisconsin Public Service Corporation 600 North Adams Street Green Bay, WI 54307-9002 Resident Inspectors Office U.S. Nuclear Regulatory Commission N490 Hwy 42 Kewaunee, WI 54216-9510 Regional Administrator Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351 Ave M. Bie, Chairperson Public Service Commission of Wisconsin PO Box 7854 Madison, WI 53707-7854 Roy Anderson Chief Nuclear Officer Nuclear Management Company, LLC 700 First Street Hudson, WI 54016 David Molzahn Nuclear Asset Manager 600 North Adams Street Green Bay, WI 54307-9002 Sarah Jenkins Electric Division Public Service Commission of Wisconsin PO Box 7854 Madison, WI 53707-7854 NRC NRR Project Manager Mail Stop O-8-H-4A U. S. Nuclear Regulatory Commission Washington, DC 20555 Mr. Mark Warner, Site Vice President Kewaunee Nuclear Power Plant Nuclear Management Company, LLC 6610 Nuclear Road Two Rivers, WI 54241 Nuclear Asset Manager Wisconsion Public Service Corporation 600 N. Adams Street Green Bay, WI 54307-9002 Kewaunee Nuclear Power Plant Nuclear Managment Company, LLC North 490, Highway 42 Kewaunee, WI 54216-9511