Sampling and Analysis Contingency Plans Request for License Amendment Post Accident Sampling
ML022330288
Person / Time
Site: Salem  
(DPR-070, DPR-075)
Issue date: 08/12/2002
From: Salamon G
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LCR S01-05, LRN-02-0276
Download: ML022330288 (3)


Text

PSEG Nuclear LLC P.O. Box 236, Hancocks Bndge, New Jersey 08038-0236 0 PSEG Nuclear LLC AUG 12 2002 LRN-02-0276 LCR S01-05 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

SAMPLING AND ANALYSIS CONTINGENCY PLANS REQUEST FOR LICENSE AMENDMENT POST ACCIDENT SAMPLING SALEM GENERATING STATION, UNIT NOS. I AND 2 FACILITY OPERATING LICENSE DPR-70 AND DPR-75 DOCKET NOS. 50-272 AND 50-311 On August 17, 2001, PSEG Nuclear (PSEG) requested an amendment to the operating licenses for Salem Generating Station Unit Nos. 1 and 2, to eliminate the requirements to have and maintain a Post Accident Sampling System (PASS). The amendment request includes the following commitment:

"PSEG will develop and maintain contingency plans for obtaining and analyzing highly radioactive samples of reactor coolant, containment sump, and containment atmosphere. A description of the contingency plans will be contained in appropriate plant procedures and implemented following the license amendment approval during the next scheduled refueling outages of each Salem Unit. Establishment of contingency plans is considered a regulatory commitment."

PSEG has developed procedures to obtain and analyze highly radioactive samples of reactor coolant, containment sump and containment atmosphere.

These procedures support implementation of the above commitment.

PSEG requests that the amendment be made effective upon issuance, with an implementation period of 90 days to provide sufficient time for administrative activities, including implementation of each of the commitments described in our August 17, 2001 amendment request.

-DRE 95-2168 REV 7/99

AUG 1 2 2002 Document Control Desk

-2 LRN-02-0276 Should you have any questions regarding this response, please contact Mr.

William McTigue at (856) 339-1033.

Sincerely, G. Salamon Manager - Nuclear Safety and Licensing

AUG 1 2 2002 Document Control Desk

-3 LRN-02-0276 C

Mr. H. J. Miller, Administrator - Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. R. Fretz Licensing Project Manager - Salem U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 0882 11555 Rockville Pike Rockville, MD 20852 USNRC Senior Resident Inspector - Salem (X24)

Mr. K. Tosch, Manager IV Bureau of Nuclear Engineering P.O. Box 415 Trenton, NJ 08625