ML022330140
| ML022330140 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 09/12/2002 |
| From: | Zwolinski J NRC/NRR/DLPM |
| To: | Sumner H Southern Nuclear Operating Co |
| Martin R, NRR/DLPM, 415-1493 | |
| References | |
| TAC MB4134, TAC MB4135 | |
| Download: ML022330140 (5) | |
Text
September 12, 2002 Mr. H. L. Sumner, Jr.
Vice President - Nuclear Hatch Project Southern Nuclear Operating Company, Inc.
Post Office Box 1295 Birmingham, Alabama 35201-1295
SUBJECT:
EDWIN I. HATCH NUCLEAR PLANT, UNITS 1 AND 2 - REPLY TO RESPONSE TO ORDER FOR INTERIM SAFEGUARDS AND SECURITY COMPENSATORY MEASURES (TAC NOS. MB4134 AND MB4135)
Dear Mr. Sumner:
On February 25, 2002, the U.S. Nuclear Regulatory Commission (NRC) issued Orders modifying the operating licenses for the Edwin I. Hatch Nuclear Plant, Units 1 and 2, to require compliance with the specified interim safeguards and security compensatory measures (ICMs).
The NRC staffs letter of June 14, 2002, addressed your earlier response to the Orders and granted, in response to your request, an extension of time until July 1, 2002, for your submission of the required response for ICM B.3.c. The NRC staff has reviewed your response to ICM B.3.c, submitted by your letter of June 19, 2002, and finds that you have satisfied the current reporting requirements of the Order.
The NRC will determine the effectiveness of your implementation of the ICMs through on-site inspections.
Please contact Bob Martin at (301) 415-1493 if you have any other questions on these issues.
Sincerely,
/RA/
John A. Zwolinski, Director Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-321 and 50-366 cc: See next page
- See previous concurrence OFFICE PDII-1/PM PDII-1/LA NSIR PDII-1/PM*
PDII-1/SC NAME JColaccino CHawes AMadison*
RMartin JNakoski DATE 9/10/02 9/10/02 09/6/02 09/10/02 9/10/02 OFFICE PDII-1/D*
DLPM/D NAME HBerkow JZwolinski DATE 09/10/02 9/11/02
Edwin I. Hatch Nuclear Plant Mr. Ernest L. Blake, Jr.
Shaw, Pittman, Potts and Trowbridge 2300 N Street, NW.
Washington, DC 20037 Mr. D. M. Crowe Manager, Licensing Southern Nuclear Operating Company, Inc.
P. O. Box 1295 Birmingham, Alabama 35201-1295 Resident Inspector Plant Hatch 11030 Hatch Parkway N.
Baxley, Georgia 31531 Mr. Charles H. Badger Office of Planning and Budget Room 610 270 Washington Street, SW.
Atlanta, Georgia 30334 Harold Reheis, Director Department of Natural Resources 205 Butler Street, SE., Suite 1252 Atlanta, Georgia 30334 Steven M. Jackson Senior Engineer - Power Supply Municipal Electric Authority of Georgia 1470 Riveredge Parkway, NW Atlanta, Georgia 30328-4684 Charles A. Patrizia, Esquire Paul, Hastings, Janofsky & Walker 10th Floor 1299 Pennsylvania Avenue Washington, DC 20004-9500 Chairman Appling County Commissioners County Courthouse Baxley, Georgia 31513 Mr. J. D. Woodard Executive Vice President Southern Nuclear Operating Company, Inc.
P. O. Box 1295 Birmingham, Alabama 35201-1295 Mr. P. W. Wells General Manager, Edwin I. Hatch Nuclear Plant Southern Nuclear Operating Company, Inc.
U.S. Highway 1 North P. O. Box 2010 Baxley, Georgia 31515 Mr. L. M. Bergen Resident Manager Oglethorpe Power Corporation Edwin I. Hatch Nuclear Plant P. O. Box 2010 Baxley, Georgia 31515
DISTRIBUTION FOR HATCH NUCLEAR PLANT UNITS 1 AND 2 - RESPPONSE TO ORDER FOR INTERIM SAFEGUARDS AND SECURITY COMPENSATORY MEASURES Hard Copy:
PUBLIC PDII-1 R/F JColaccino CHawes RMartin E-Mail:
SCollins/JJohnson BSheron/KJohnson JZwolinski/TMarsh HBerkow JNakoski WBorchardt VDricks RSullivan RCrlenjak RPalla LOlshan OGC ACRS BBoger RAlbert GTracy JBelanger RHaag, RII SECY JShea VOrdaz LReyes, RII