July 2002 Monthly Operating Report for Perry Unit 1
ML022330055
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 08/13/2002
From: Dunn G
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, PY-CEI/NRR-2655L
Download: ML022330055 (3)


Text

FENOC FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant 10 Center Road PO. Box 97 Perry, Ohio 44081 August 13, 2002 PY-CEINRR-2655L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C.

20555 Perry Nuclear Power Plant Docket No. 50-440 License No. NPF-58 Monthly Operating Report Ladies and Gentlemen:

Attached is the July 2002 Monthly Operating Report for Perry Unit 1. Page 1 is the Operating Data Report and page 2 is the Unit Shutdowns Report. This report is submitted in accordance with Technical Specification 5.6.4 and Generic Letter 97-02, "Revised Contents of the Monthly Operating Report."

If you have questions or require additional information, please contact Ms. Toni Phelps at (440) 280-7660.

V trly ours, for Gregory A. Dunn Manager - Regulatory Affairs Attachment cc: NRC Region III Administrator NRC Project Manager NRC Resident Inspector

OPERATING DATA REPORT UNIT:

Perry_

DATE:

8/5/02 Docket: 50-440 Unit Name:

Perry Nuclear Power Plant Reporting Period: July 2002 Utility

Contact:

T. Phelps Telephone: 440-280-7660 Design Electrical Rating (Net MWe):

Maximum Dependable Capacity (Net MWe):

1260 1235 Hours Reactor was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy (MWeH)

This Month 744.0 744.0 0.0

.QO. R17 0 Yr-to-Date 4,930.0 4,846.5 0.0 5 879.723.0 Cumulative 101,515.2 98,919.5 0.0 112.480.125.0

1.
2.
3.
4.
5.
6.

7.

8.
9.
10.

11.

Page 1 909I i-

1.

0

UNIT SHUTDOWNS REPORT MONTH - JULY 2002 DOCKET NO: 50-440 NAME: Perry Nuclear Power Plant DATE: 08/05/02 CONTACT: T. Phelps TELEPHONE: (440) 280-7660 No.

Date Type Duration Reason Method Cause and Corrective Action to Prevent Recurrence 1

Hours 2

3

SUMMARY

The Perry Plant was on line the entire month of July, 2002.
1. TYPE:

F: Forced S: Scheduled

2. REASON:

A - Equipment Failure (explain)

B - Maintenance or Test C - Refueling D - Regulatory E - Operating Training &

License Examination F - Administrative G - Operational Error (explain)

H - Other (explain)

3. METHOD:

1-Manual 2 - Manual Scram 3 -Automatic Scram 4 - Continuation 5 - Other Page 2