Letter, Interim Compensatory Measures
ML022320958
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 08/30/2002
From: Zwolinski J
NRC/NRR/DLPM
To: Terry C
TXU Energy
Jaffe D, NRR/DLPM, 415-1439
References
TAC MB4114, TAC MB4115
Download: ML022320958 (6)


Text

August 30, 2002 Mr. C. Lance Terry Senior Vice President &

Principal Nuclear Officer TXU Energy Attn: Regulatory Affairs Department P. O. Box 1002 Glen Rose, TX 76043

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION, UNITS 1 AND 2 - REPLY TO RESPONSE TO ORDER FOR INTERIM SAFEGUARDS AND SECURITY COMPENSATORY MEASURES (TAC NOS. MB4114 AND MB4115)

Dear Mr. Terry:

On February 25, 2002, the U.S. Nuclear Regulatory Commission (NRC) issued Orders modifying the facility operating licenses for the Comanche Peak Steam Electric Station, Units 1 and 2 to require compliance with the specified interim safeguards and security compensatory measures.

The NRC staffs letter of June 4, 2002, addressed your earlier response to the Orders and granted, in response to your request, an extension of time until June 20, 2002, for your submission of the required response for Interim Compensatory Measures (ICMs) B.2.a(1) and B.2.a(2).

The NRC staff has reviewed your response to ICMs B.2.a(1) and B.2.a(2), submitted by your letter of June 20, 2002, and finds that you have satisfied the current reporting requirements of the Order.

The NRC will determine the effectiveness of your implementation of the ICMs through on-site inspections. I would like to remind you that, pursuant to Section III.C.2 of the Order, you are to report to the Commission when you have achieved full compliance with the requirements described in Attachment 2 to the Order.

Please contact David Jaffe at (301) 415-1439 if you have any other questions on these issues.

Sincerely,

/RA by S. Richards for/

John A. Zwolinski, Director Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-445 and 50-446 cc: See next page

ML022320958

  • See previous concurrence OFFICE PDII-1/PM PDIV-1/PM PDIV-1/LA NSIR PDIV-1/SC PDIV/D DLPM/D NAME RMartin*

DJaffe McAllister AMadison RGramm WRuland SRichards for JZwolinski DATE 8/22/02 8/26/02 8/26/02 8/26/02 8/27/02 8/30/02 8/30/02

August 2002 Comanche Peak Steam Electric Station cc:

Senior Resident Inspector U.S. Nuclear Regulatory Commission P. O. Box 2159 Glen Rose, TX 76403-2159 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 Mr. Roger D. Walker Regulatory Affairs Manager TXU Generation Company LP P. O. Box 1002 Glen Rose, TX 76043 George L. Edgar, Esq.

Morgan, Lewis & Bockius 1800 M Street, N.W.

Washington, DC 20036-5869 County Judge P. O. Box 851 Glen Rose, TX 76043 Environmental and Natural Resources Policy Director Office of the Governor P. O. Box 12428 Austin, TX 78711 Richard A. Ratliff, Chief Bureau of Radiation Control Texas Department of Health 1100 West 49th Street Austin, TX 78756-3189 Brian Almon Public Utility Commission William B. Travis Building P. O. Box 13326 1701 North Congress Avenue Austin, TX 78701-3326 Wade Wheatley, Director Waste Permits Division Texas Natural Resource Conservation Commission P. O. Box 13087 (MS 126)

Austin, TX 78711-3087

August 2002 DISTRIBUTION FOR COMANCHE PEAK STEAM ELECTRIC STATION RE: INTERIM COMPENSATORY MEASURES Dated: August 30, 2002 PUBLIC PDIV-1 Reading File RidsOgcRp RidsNrrOd (SCollins/JJohnson)

RidsAdpt (BSheron)

RidsNrrAdip (WBorchardt)

RidsNrrDlpm (JZwolinksi/LMarsh)

RidsNrrDipm (BBoger)

RidsNrrDlpmLpdiv (WRuland)

RidsNrrDlpmLpdiv1 (RGramm)

RidsNrrLADJohnson RidsNrrPMDJaffe RidsAcrsAcnwMailCenter RidsNrrPMRMartin RidsRgn4MailCenter (KBrockman)

SECY GHill (4)

VDricks RAlbert JShea RSullivan GTracy VOrdaz RCrlenjak JBelanger RPalla