ENTERGY NUCLEAR NORTHEAST.

.,JAMES A. FITZPATRICK NUCLEAR POWER PLANT P.O.,BOX 110.

-'/LYCOMING,,NY 13093

-DOCUMENT TRANSMITTAL AND RECEIPT ACKNOWLEDGEMENT FORM THESE PROCEDURES ARE EFFECTIVE FRIDAY, AUGUST 2,2002 DATE: July 29, 2002 CONTROLLED COPY NUMBER: 34 TO: U.S.N.R.C. Document Center/Washington, DC FROM: CATHY IZYK - EMERGENCY PLANNING DEPARTMENT

SUBJECT:

EMERGENCY PLAN AND IMPLEMENTING PROCEDURES Enclosed are revisions to your assigned copy of the JAFNPP Emergency Plan and Implementing Procedures. Please remove and DISCARD the old pages. Insert the attached, initial and date this routing sheet and return the completed routing sheet to Cathy Izyk in the Emergency Planning Department within 15 days. If this transmittal is not returned within 15 days, your name will be removed from the controlled list.

-.-- VOLUMEI Update List-Dated August 2,2002 DOCUMENT PAGES REV. # INITIALS/DATE SECTION 5 REPLACE ALL 37

"-VOLUME2' Update List Dated August 2. 2002.

DOCUMENT PAGES REV. # INITIALS/DATE lAP-1 REPLACE ALL 27 IAP-2 - place each ALL currently REPLACE tabs sections behind the 23 in your binder EAP-1.1 REPLACE ALL 46 EAP-2 REPLACE ALL 25 EAP-3 REPLACE ALL 23 EAP-4 - place pull REPLACE ALL colored stickers on the attachedmaps 31 EAP-4 _____two out EAP-8 REPLACE ALL 57 EAP-9 REPLACE ALL 10 EAP-10 REPLACE ALL 16 EAP-1I REPLACE ALL 18 EAP-17 REPLACE ALL 101 VOLUME 3 :Update'List Dated August 2. 2002 DOCUMENT PAGES REV. # INITIALS/DATE EAP-42 REPLACE ALL 18 SAP-3 REPLACE ALL 72 /

SAP-20 REPLACE ALL 21

EMERGENCY PLAN IMPLEMENTING PROCEDURES/VOLUME 2 UPDATE LIST I CNRrEt flOP \T?I, I

?/-,

LLLýý yv I

"Dateof Issue: August 2, 2002 August 2, 2002 NProeeure Procedure j. Dat6 'of Us ,e'of, Las~t rocedure N/A TABLE OF CONTENTS REV. 19 02/98 N/A IAP-1 EMERGENCY PLAN IMPLEMENTATION REV. 27 08/02 Continuous CHECKLIST IAP-2 CLASSIFICATION OF EMERGENCY REV. 23 08/02 Continuous CONDITIONS EAP-I.1 OFFSITE NOTIFICATIONS REV. 46 08/02 Informational EAP-2 PERSONNEL INJURY REV. 25 08/02 Informational EAP-3 FIRE REV. 23 08/02 Informational EAP-4 DOSE ASSESSMENT CALCULATIONS REV. 31 08/02 Reference EAP-4.1 RELEASE RATE DETERMINATION REV. 14 06/02 Reference EAP-5.1 DELETED (02/94)

EAP-5.2 DELETED (04/91)

EAP-5.3 ONSITE/OFFSITE DOWNWIND SURVEYS REV. 8 06/02 Informational AND ENVIRONMENTAL MONITORING EAP-6 IN-PLANT EMERGENCY SURVEY/ENTRY REV. 16 06/02 Informational EAP-7.1 DELETED (02/94)

EAP-7.2 DELETED (02/94)

EAP-8 PERSONNEL ACCOUNTABILITY REV. 57 08/02 Reference EAP-9 SEARCH AND RESCUE OPERATIONS REV. 10 08/02 Informational EAP-10 PROTECTED AREA EVACUATION REV. 16 08/02 Informational EAP-11 SITE EVACUATION REV. 18 08/02 Informational DOSE ESTIMATED FROM AN ACCIDENTAL EAP-12 RELEASE OF RADIOACTIVE MATERIAL TO REV. 11 04/02 Reference LAKE ONTARIO EAP-13 DAMAGE CONTROL REV. 14 06/02 Informational EAP-14.1 TECHNICAL SUPPORT CENTER REV. 22 04/02 Informational ACTIVATION EAP-14.2 EMERGENCY OPERATIONS FACILITY REV. 20 04/02 Informational ACTIVATION EAP-14.5 OPERATIONAL SUPPORT CENTER REV. 14 03/00 Informational ACTIVATION AND OPERATION I Page 1 of 2

EM ERGENCY PLAN IMPLEMENTING PROCEDURES/VOLUME 2 UPDATE LIST Date of Issue: August 2, 2002 Procedure Procedure Revision Date of Use of Number Title Number Last Procedure

_______________________________Review Prede EAP-14.6 HABITABILITY OF THE EMERGENCY REV. 14 10/98 Informational FACILITIES EAP- 15 EMERGENCY RADIATION EXPOSURE REV. 11 06/02 CRITERIA AND CONTROL Informational EAP-16 PUBLIC INFORMATION PROCEDURE REV. 6 02/98 Informational EAP-16.2 JOINT NEWS CENTER OPERATION REV. 0 02/02 Informational EAP-17 EMERGENCY ORGANIZATION STAFFING REV. 101 08/02 Informational EAP- 18 DELETED (12/93)

EAP-19 EMERGENCY USE OF POTASSIUM IODINE REV 21 04/01 (KI) Informational EAP-20 POST ACCIDENT SAMPLE, OFFSITE REV 9 06/02 SHIPMENT AND ANALYSIS Reference EAP-21 DELETED (12/85)

EAP-22 DELETED (02/98)

EAP-23 EMERGENCY ACCESS CONTROL REV. 11 06/02 Informational EAP-24 EOF VEHICLE AND PERSONNEL REV 9 06/02 DECONTAMINATION Informational EAP-25 DELETED (02/94)