ML022240574
ML022240574 | |
Person / Time | |
---|---|
Issue date: | 08/09/2002 |
From: | Dennig R NRC/NRR/DRIP/RORP |
To: | Pietrangelo A Nuclear Energy Institute |
Tjader T., NRC/RORP, 415-1187 | |
Shared Package | |
ML022240556 | List: |
References | |
Download: ML022240574 (9) | |
Text
August 9, 2002 Mr. Biff Bradley Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708
SUBJECT:
JULY 12, 2002:
SUMMARY
OF MEETING WITH RISK-INFORMED TECHNICAL SPECIFICATION TASK FORCE (RITSTF)
Dear Mr. Bradley:
The purpose of this letter is to transmit the summary of a meeting with the RITSTF. The meeting was held at the U.S. Nuclear Regulatory Commission offices in Rockville, Maryland, on July 12, 2002.
Sincerely,
/RA/
Robert L. Dennig, Section Chief Technical Specifications Section Operating Reactor Improvements Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation
Enclosures:
- 1. Meeting Summary
- 2. Attendance List
- 3. Agenda
- 4. RITSTF Initiative Status cc w/encl: See attached page
DOCUMENT NAME: G:\RORP\TSS\TJADER\RITSTF-MTGsum-7-12-02.wpd OFFICE SRE:TSS:RORP:DRIP SC:TSS:RORP:DRIP NAME TRTjader RLDennig DATE 08/08/2002 08/09/2002 Mr. Biff Bradley cc via e-mail:
Mr. Tony Pietrangelo Mr. Rick Hill Nuclear Energy Institute General Electric Nuclear Energy Mr. Biff Bradley Mr. Michael S. Kitlan, Jr.
Nuclear Energy Institute Duke Energy Corporation Mr. Mike Schoppman Mr. Noel Clarkson Nuclear Energy Institute Duke Energy Corporation Mr. Alan Hackerott, Chairman Mr. Donald Hoffman Omaha Public Power District EXCEL Services Corporation Mr. Jim Kenny Mr. Ted Book Pennsylvania Power & Light Company Framatech-ANP Mr. James Andrachek Mr. R. J. Schomaker Westinghouse Electric Company Framatech-ANP Mr. Jack Stringfellow Mr. J. E. Rhoads Southern Nuclear Operating Company Energy Northwest Mr. Donald McCamy Ms. Deann Raleigh Browns Ferry Nuclear Plant Scientech Mr. Ray Schneider Mr. Ken Canavan Westinghouse Electric Company DS&S Mr. Frank Rahn Mr. Sam Chien EPRI SCE Mr. Wayne Harrison Mr. Gary Chung STP SCE-SONGS Mr. Drew Richards Mr. Courtney Smyth STP PSEG Nuclear LLC Mr. Gabe Salamon Mr. Jerry Andre PSEG Nuclear Westinghouse Electric Company
DISTRIBUTION:
ADAMS PUBLIC TSS R/F TSS Staff DMatthews/FGillespie (RidsNrrDrip)
WDBeckner (RidsNrrDripRorp)
GMHolahan (RidsNrrDssa)
RJBarrett (RidsNrrSpsb)
JZwolinski (RidsNrrDlpm)
JNHannon (RidsNrrDssaSplb)
TRQuay (RidsNrrDipmlqmb)
OGC (RidsOgcRp)
ACRS/ACNW (RidsAcrsAcnwMailCenter)
MKotzalas (MXK5)
MLWohl (MLW1)
NSaltos (NTS)
JWilliams (JFW1)
WScott (WES)
GSShukla (GSS)
FMReinhart (FMR)
AWMarkley (AWM)
SLMagruder (SLM1)
RFDudley (RFD)
DFThatcher (DFT)
JEDonoghue (JED1)
MLScott EMMcKenna (EMM)
MACunningham (MAC3)
ASKuritzky (ASK1)
ASingh (AXS3)
MTMarkley (MTM)
SDAlexander (SDA)
SUMMARY
OF THE JULY 12, 2002, NRC/INDUSTRY MEETING OF THE RISK-INFORMED TECHNICAL SPECIFICATION TASK FORCE The NRC staff met with the NEI Risk-Informed Technical Specification Task Force (RITSTF) on July 12, 2002, from 8:30 a.m. to 11:45 a.m. The meeting attendees are listed in Enclosure 2.
The agenda (Enclosure 3) consisted of discussions of the seven active RITSTF initiatives. The RITSTF provided a summary of the status of the initiatives (Enclosure 4), updated to reflect the meetings progress. Following is a brief description of the status of the initiatives in the order in which they were discussed.
Initiative 3, TSTF-359, Modification of mode restraint requirements of LCO 3.0.4 & SR 3.0.4:
The content of TSTF 359, Revision 7 was discussed. The RITSTF will submit TSTF-359, Revision 7, and the staff will complete writing the SER for the first CLIIP Federal Register Notice requesting public comment. The staff will publish the first CLIIP Federal Register Notice soon after TSTF 359, Revision 7 is received.
Initiative 1, TS Actions End States Modifications: The CE topical SER was issued on July 17, 2001. The BWR topical SER has been written and is in internal NRC review. A conference call was held to resolve questions resulting from NRC SER review; the BWROG is working on the resolution of issues. After resolution of issues a draft BWR topical SER will be provided the BWROG, to allow the RITSTF to map the requirements and prepare the BWR TSTF-423. The RITSTF provided the CE TSTF-422 in June and staff review has begun.
Initiative 6, Modification of LCO 3.0.3 Actions and Completion Times: A CEOG submittal (on 6b/c) was received on January 24, 2001, and it was reviewed by the staff. RAIs were issued on May 9, 2001. A conference calls are being held as necessary to resolve questions.
The staff is preparing an SER. A comprehensive TSTF-426, for all OGs, is planned to be submitted on September 30, 2002.
Initiative 5, Relocation of non-safety SRs (5b) and relocation of all SR frequency requirements (5a) out of TS: The RITSTF will develop a Guidance Document on an Initiative 5 methodology and provide it to the NRC by September 30, 2002. The RITSTF will get a pilot plant to test the proposed program and procedures. After NRC review and acceptance of the Guidance Document, the RITSTF will prepare and submit TSTF-425.
Initiative 7, Non-TS support system impact on TS operability determinations: The RITSTF presented an enhanced white paper at the December 19, 2001 meeting. The NRC provided feedback to this enhanced white paper on January 25, 2002. The RITSTF submitted TSTF-372, Revision 1, addressing only snubbers, on January 14, 2002. The NRC staff and the RITSTF are working together to resolve the open issues. The RITSTF will submit a revision to TSTF-372 by July 31, 2002. The RITSTF will submit TSTF-427 by September 15, 2002.
Initiative 8a, Remove/Relocate non-safety and non-risk significant systems from TS that do not meet 4 criteria of 10 CFR 50.36: The NRC is currently developing guidance on plant specific application of Initiative 8a. The RITSTF will interface with the NRC in the development of the guidance. The RITSTF will develop: a position paper on Initiative 8a by July 31, 2002; guidance and a methodology for implementing Initiative 8a by September 30, 2002; and, a TSTF by November 30, 2002.
Enclosure 1
Initiative 4b, Risk Informed AOTs, use of a configuration risk management program (CRMP):
The NEI RITSTF will coordinate comprehensive and multiple pilots, including CEOG, STP and Hope creek pilots. The RITSTF will seek to obtain a pilot plant that has converted to the STS.
While each pilot may not address the proposed methodology completely, the RITSTF will ensure the various approaches will prove the entire proposed methodology. The RITSTF will ensure a single coordinated methodology will emerge from and be supported by the individual pilots. The RITSTF will provide: an integration plan with schedules by August 15, 2002; a CEOG TSTF addressing a single system by August 31, 2002; a draft guidance document by October 31, 2002; the pilot plants will submit applications by December 31, 2002; and an integrated TSTF-424 in March 2003.
The next NRC TSS/NEI RITSTF meeting is scheduled for September 24 and 25, 2002; the location is to be determined.
NRC/INDUSTRY MEETING OF THE RISK-INFORMED TECHNICAL SPECIFICATION TASK FORCE ATTENDANCE LIST JULY 12, 2002 NAME AFFILIATION TONY PIETRANGELO NUCLEAR ENERGY INSTITUTE BIFF BRADLEY NUCLEAR ENERGY INSTITUTE J. E. DUSTY RHOADS ENERGY NORTHWEST/BWROG DONALD HOFFMAN EXCEL SERVICES JIM ANDRACHEK WESTINGHOUSE/WOG MIKE KITLAN DUKE ENERGY R. J. SCHOMAKER FRAMATECH ANP DREW RICHARDS STP WAYNE HARRISON STP/WOG RAY SCHNEIDER WESTINGHOUSE/CEOG DON McAMY TVA NOEL CLARKSON DIKE ENERGY/BWOG GARY CHUNG SCE/SONGS/CEOG DEANN RALEIGH LIS, SCIENTECH BILL BECKNER NRC/NRR/DRIP/RORP BOB DENNIG NRC/NRR/DRIP/RORB/TSS BOB TJADER NRC/NRR/DRIP/RORB/TSS GIRIJA SHUKLA NRC/NRR/DLPM/LPD4 STEVE ALEXANDER NRC/NRR/DIPM/IQMB Enclosure 2
AGENDA TSB/NEI RITSTF Meeting July 12, 2002 from 8:30 AM to 12:30 PM, in O-9B4 1 Status of Initiatives Initiative 3, LCO 3.0.4 & SR 3.0.4 (Mode Restraint) Flexibility TSTF-359 R7 and SER for CLIIP Initiative 4b, RI AOTs with CRMP Industry proposed approaches, pilots Initiative 5, STI Evaluation Methodology RAI Responses Initiative 1, End States BWR SER preparation TSTF submittal Initiative 6, LCO 3.0.3 Actions and Completion Times Initiative 7, Non-TS Support System Operability Impact on TS System & TSTF-372 Initiative 8a, Remove/Relocate non-safety & non-risk significant systems from TS 1 Schedule Next Meeting 1 Closing Comments Enclosure 3