ML022210533
From kanterella
Jump to navigation
Jump to search
ML022210533 | |
Person / Time | |
---|---|
Site: | Ginna |
Issue date: | 03/01/2002 |
From: | Rochester Gas & Electric Corp |
To: | Office of Nuclear Reactor Regulation |
References | |
33013-1274-LR Rev. 17 | |
Download: ML022210533 (1) | |
Similar Documents at Ginna | |
---|---|
Category:Drawing
MONTHYEARML20339A0472020-11-20020 November 2020
[Table view]9 to Updated Final Safety Analysis Report, Chapter 11, Figures ML20339A0412020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis, Figures ML20339A0432020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems, Figures ML20339A0352020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems, Figures ML20339A0372020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2A, Probable Maximum Flood and Low Water Conditions, Figures ML20339A0152020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 3, Appendix B, Figures ML20339A0522020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B, Drift and Dispersion Characteristics of Lake Ontario Near Shore Waters, Figures ML20339A0162020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System, Figures ML20339A0342020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Figures ML20339A0632020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations, Figures ML19150A4392019-05-10010 May 2019 Revision 28 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B, Figures ML19150A4762019-05-10010 May 2019 Revision 28 to Updated Final Safety Analysis Report, Chapter 08, Figures ML19150A4662019-05-10010 May 2019 Revision 28 to Updated Final Safety Analysis Report, Chapter 5, Figures ML19150A4542019-05-10010 May 2019 Revision 28 to Updated Final Safety Analysis Report, Chapter 3, Appendix B, Figures - Design of Large Opening Reinforcements for Containment Vessel ML19150A4422019-05-10010 May 2019 Revision 28 to Updated Final Safety Analysis Report, Chapter 2, Figures ML19150A4412019-05-10010 May 2019 Revision 28 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2C, Figures ML19150A4372019-05-10010 May 2019 Revision 28 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2A, Figures ML19150A4932019-05-10010 May 2019 Revision 28 to Updated Final Safety Analysis Report, Chapter 13, Figures ML19150A4992019-05-10010 May 2019 Revision 28 to Updated Final Safety Analysis Report, Chapter 15, Figures ML18186A2052018-07-0505 July 2018 R. E. Ginna - Drawing 0521-066, Reactor Containment Vessel Steam Gen. Coolant Pump & Pressurizer Bracket & Support-Locations & Orientation. ML18143B0222018-05-23023 May 2018 R. E. Ginna - Plate G-I, Seismic Refraction Profile I ML18143B1932018-05-23023 May 2018 R. E. Ginna - Plate 5.2-7, Surficial Geologic Map Showing Areas of Active Erosion. ML18143B1912018-05-23023 May 2018 R. E. Ginna - Chart 2, Brookwood Site Environs, Numbers in Squares Refer to Water Well Locations ML18143B1902018-05-23023 May 2018 R. E. Ginna - Chart 4, Layout and Topography ML18143B1872018-05-23023 May 2018 R. E. Ginna - Chart 11, Genesee River Turbidity ML18143B1832018-05-23023 May 2018 R. E. Ginna - Sketch of the East Side of the Pit Excavation, Showing Stratigraphy of Surficial Deposits, Till Stacking, Bedrock Faults, and Glacial Shears ML18143B0372018-05-23023 May 2018 R. E. Ginna - Plate D-1A, Cross Section Showing Contact Surface Between Grey Clay and Red Till in Postulated Vicinity of Intersection of Faulting with Shoreline. ML18143B1242018-03-14014 March 2018 R. E. Ginna - Drawing E, Correlation and Geologic Interpretation from West to East in Central Portion of the Site. ML18143B1222018-03-14014 March 2018 R. E. Ginna - Plate A-78, Correlation and Geologic Interpretation from North to South in the Central Portion of the Site. ML18143B1302018-03-14014 March 2018 R. E. Ginna - Plate 85, North-South Profile Showing Fresh Bedrock Surface in the Fault Area Between Borings 113 and 210. ML18025A9852018-01-23023 January 2018 Attachment 3 - Ginna Flooding Focused Evaluation Audit Documentation ML18025A9872018-01-23023 January 2018 Attachment 1 - Ginna Flooding Focused Evaluation Audit Documentation ML16180A1362016-05-0505 May 2016 Revision 26 to the Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Appendix 2A, Probable Maximum Flood and Low Water Conditions ML16180A1312016-05-0505 May 2016 Revision 26 to the Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant, Figure 1.2-1 ML16180A1482016-05-0505 May 2016 Revision 26 to the Updated Final Safety Analysis Report, Chapter 03, Design of Structures, Components, Equipment, and Systems, Figures 3.7-1 Through 3.11-1 ML16180A1392016-05-0505 May 2016 Revision 26 to the Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Figures 2.1-1 Through 2.5-3 ML0515304512004-06-0202 June 2004 Drawing 1 of 4, Ginna Site Boundary Survey, Rev. 1 ML0515304532004-06-0202 June 2004 Drawing 2 of 4, Building Details, Rev 1 ML0515304542004-06-0202 June 2004 Drawing 3 of 4, Site Detail, Rev. 1 ML0515304572004-06-0202 June 2004 Drawing 4 of 4, Station 13A Site Survey Map, Rev. 2 ML0412110062004-02-16016 February 2004 Drawing 33013-3102, Rev. 0, Control Room East Wall Penetrations for Creats Ducts. Sheet 1 ML0412110042004-02-11011 February 2004 Drawing 33013-3100, Rev. 0, Relay Room Annex Roof Penetrations and Creats Ducts. ML0405502742004-02-11011 February 2004 Drawing No. 33013-3000, Revision 2, Control Room HVAC Control Room Emergency Air Treatment System (Creats) and Emergency Cooling System, Modification P & Id. ML0222105382002-03-15015 March 2002 Drawing 33013-1275, Rev 4, Waste Disposal -- Gas Hydrogen Recombiner (Wd) P & Id Sheet 2 of 2-LR ML0222101972002-03-11011 March 2002 Drawing 33013-1248-LR, Rev 27, Auixilary Cooling Spent Fuel Pool Cooling (AC) P & Id ML0222105282002-03-0101 March 2002 Drawing 33013-1272, Rev 11, Waste Disposal -- Liquid Rc Drain Tank (Wd) P & Id Sheet 2 of 2 ML0222105332002-03-0101 March 2002 Drawing 33013-1274-LR, Rev 17, Waste Disposal -- Gas Hydrogen & Nitrogen (Wd) P & Id ML0222102962002-02-27027 February 2002 Drawing 33013-1258-LR, Rev. 23, Reactor Coolant Pressurizer (Rc) P & Id ML0222402702002-02-23023 February 2002 Drawing 33013-1885, Rev 30, Circulating Water P & Id Sheet 2 of 2-LR ML0222103092002-02-22022 February 2002 Drawing 33013-1260-LR, Rev 21, Reactor Coolant (Rc) P & Id 2020-11-20 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML022210533&oldid=2696562"