ML022210507

From kanterella
Jump to navigation Jump to search

Tech Spec Page to Amendment 268 Safety Injection Tanks
ML022210507
Person / Time
Site: Millstone Dominion icon.png
Issue date: 08/07/2002
From:
NRC/NRR/DLPM
To:
References
TAC MB2859
Download: ML022210507 (1)


Text

EMERGENCY CORE COOLING SYSTEMS SAFETY INJECTION TANKS (Continued)

SURVEILLANCE REQUIREMENTS Each SIT shall be demonstrated OPERABLE:

a.

Verify each SIT isolation valve is fully open at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />."1'

b.

Verify borated water volume in each SIT is > 1080 cubic feet and

< 1190 cubic feet at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.i2

c.

Verify nitrogen cover-pressure in each SIT is > 200 psig and

< 250 psig at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. 3)

d.

Verify boron concentration in each SIT is > 1720 ppm at least once per 6 months, and once within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> after each solution volume increase of > 1% of tank volume(4) that is not the result of addition from the refueling water storage tank.

e.

Verify that the closing coil in the valve breaker cubicle is removed at least once per 31 days.

(I)

If one SIT is inoperable, except within limits or inoperable surveillance is not applicable to as a result of boron level or pressure the affected SIT.

concentration not instrumentation, (2)

If one SIT is inoperable due solely to inoperable water level instrumentation, surveillance is not applicable to the affected SIT.

(3)

If one SIT is inoperable due solely to inoperable instrumentation, surveillance is not applicable to affected SIT.

(4)

Only required to be performed for affected SIT.

MILLSTONE -

UNIT 2 3/4 5-2 Amendment No.

0732 pressure 779, 771, 268 4.5.1