ML022200158

From kanterella
Jump to navigation Jump to search
Yankee Implementing Procedures to the Emergency Plan, Rev. 11 to AP-3400 and Rev. 17 to AP-3426
ML022200158
Person / Time
Site: Yankee Rowe
Issue date: 08/01/2002
From:
Yankee Atomic Electric Co
To:
Document Control Desk, NRC/FSME
References
-RFPFR
Download: ML022200158 (25)


Text

I TO: Document Control Center -

CONTROLLED COPY NO: 19 NRC File Room DOCUMENT CHANGE NOTICE NO. 149 I

Date: August 1, 2002 From: YNPS Site Services Department Document: Implementing Procedures to the Emergency Plan

1. Enter the attached documents in your manuals and/or files, discard all obsolete copies, and return this form to the Site Services Department at Yankee-Rowe within 30 Calendar days.
2. SAFEGUARDS INFORMATION DOCUMENTS ALL OBSOLETE copies shall be returned to the Security Shift Supervisor for SHREDDING. SAFEGUARDS INFORMATION documents shall be hand-to-hand delivered or enclosed in two properly sealed and addressed envelopes. Return this form to the Site Services Department.

DESCRIPTION OF CHANGE: ISSUANCE: Implementing Proc. to the E-Plan List of Effective Pages Table of Contents DCN No. 149 8/1/02 PROCEDURE NO. REV. NO.

AP-3400 11 AP-3426 17 DOCKET NO. 50-29 LICENSE NO. DPR-3 Please sign and return to: Renee Prilipp Yankee Atomic Electric Co.

49 Yankee Rd.

Rowe, MA 01367 Departmental Working Copies have been Reviewed and Working Copy Files Updated.

N/A Departmental Signature (N/A if not applicable)

The above documents have been entered in the applicable Department Manuals and/or files and all Obsolete copies have been discarded or identified as obsolete. [3, 5.2.15, Paragraph 9, Item 4] SAFEGUARDS INFORMATION documents will be handled per

  1. 2 above.

Date Signature

ý0-APF-0223.1 RT: 09.N01.301 Rev. 15 IMS: A15.03.01

08/01/02 Rev. 149 YANKEE NUCLEAR POWER STATION IMPLEMENTING PROCEDURES TO THE EMERGENCY PLAN TABLE OF CONTENTS TABLE OF CONTENTS Rev. 149 IMPLEMENTING PROCEDURES Classification of Emergencies OP-3300 Rev. 21 Emergency Medical/Confined Space Response OP-3305 Rev. 26 Actions Control Room Actions During an Emergency OP-3315 Rev. 20 Technical Support Center (TSC) Activation OP-3324 Rev. 16 and Operations Release of Public Information Under OP-3343 Rev. 14 Emergency Conditions Security Force Actions Under Emergency OP-3344 Rev. 26 Conditions Emergency Preparedness Drills and AP-3400 Rev. 11 Exercises Emergency Equipment Readiness Check AP-3425 Rev. 8 Technical Support Center (TSC) Readiness AP-3426 Rev. 17 Check Emergency Preparedness Training AP-3450 Rev. 9 Responsibilities for Maintaining and AP-3451 Rev. 1 Implementing the Emergency Preparedness Program for YNPS Revision Process for the YNPS Defueled AP-3452 Rev. 3 Emergency Plan

Proc. No. AP-3400 Rev. No. 11 Issue Date 08/2002 Review Date 07/2004 EMERGENCY PREPAREDNESS DRILLS AND EXERCISES SCOPE This procedure outlines the process in which Emergency Preparedness drills and exercises are developed, performed, evaluated and documented.

ENCLOSURES AP-3400 - Pgs. 1-6 APF-3400.1 - Pg. 1 - Rev. 11 APF-3400.2 - Pg. 1 - Rev. 11 APF-3400.3 - Pgs. 1 Rev. 11 APF-3400.4 - Pg. 1 - Rev. 11 APF-3400.5 - Pgs. 1 Rev. 11 REFERENCES

1. Yankee Nuclear Power Station Defueled Emergency Plan
2. AP-0227, "Condition Reporting and Investigation" DISCUSSION Emergency drills and exercises shall be conducted to assure the capability of the Emergency Response Organization (ERO) to execute the Defueled Emergency Plan (DEP) and the Defueled Emergency Plan Implementing Procedures (DEPIPs).

Drills are supervised instruction periods aimed at testing, developing and maintaining the skills necessary to perform a particular emergency response function. Drills may be performed independently, in combination with, or as a component of the required annual exercise.

Exercises are events which test the integrated capability and a major portion of the basic elements within the emergency plan.

The four categories of Emergency Preparedness Drills are briefly described below:

Emergency A drill conducted at least annually to test and Response: evaluate the augmentation capabilities of the Emergency Response Organization (ERO). It will evaluate the time required for designated personnel to respond to the plant. These drills are typically simulated.

AP-3400 Rev. 11 Fire: A drill to test and evaluate the response and training of the plant's Fire Brigade. Drills may be performed in conjunction with off-site fire support. Routine fire drills are conducted in accordance with AP-0503, "Fire Protection Training", and are not addressed by this procedure.

Medical A drill conducted at least annually to train as Response: well as test and evaluate the response of the plant's Medical Response Team. Drills will involve simulated contaminated victims and the participation of off-site medical support service agencies.

Radiation An annual drill to test and evaluate the Protection: response to emergency radiation protection situations.

Each type of drill should test a specific range of emergency response actions. Drill performance will be supervised and evaluated by individuals qualified in the designated area(s) of response. Qualified individuals may assist the Emergency Plan Coordinator (EPC) in preparing and/or conducting drills; However, drill preparation and conduct is the responsibility of the EPC.

PRECAUTIONS Participants in drills and/or exercises may need to utilize plant equipment outside of the industrial areas (radiation detection instruments, medical equipment, etc.). If an individual is a drill participant, removal of equipment for drill purposes shall be allowed without an approved property pass. All equipment shall be restored to its pre-drill status/location following drill/exercise termination.

PREREQUISITES None PROCEDURE A. PLANNING AND NOTIFICATIONS

1. PLANNING
a. The EPC will be responsible for completing the following actions:
1) Schedule a drill or exercise at least six weeks in advance. Coordinate the selection of the date with plant management and coordinate the

AP-3400 Rev. 11 involvement of off-site agencies with the DE&S Contingency Management Services (CMS) Group, if applicable.

2) Appoint a Drill or Exercise Coordinator.
3) Forward a copy of the Drill/Exercise Scenario at least six weeks before the Exercise to the Off Site Agencies designated below for pre-planning review.
  • Vermont Emergency Management Agency (VEMA) 0 Shelburne Dispatch
4) Ensure that a current Letter of Agreement between Yankee and each of the off-site agencies involved exists, if applicable.
5) Review the Drill or Exercise Scenario Package at least two weeks prior to the drill.
b. The Drill or Exercise Coordinator will be responsible for completing the following actions:
1) Determine the type of drill or exercise and establish appropriate objectives.
2) Select or develop a drill or exercise scenario.

The scenario should simulate as much as practicable an actual emergency situation.

3) In cooperation with the EPC develop a list of events to be simulated during the drill or exercise.
4) Develop simulated instrument responses and information for use during the drill or exercise.
5) Assign drill or exercise Controllers and Observers.
6) Prepare a Drill or Exercise Scenario Package using APF-3400.1, "Drill/Exercise Scenario Package Format" as an outline.

AP-3400 Rev. 11

7) Submit the Drill or Exercise Scenario Package to the EPC for review at least three weeks prior to the scheduled drill.
8) Resolve review comments and prepare final drill or exercise package.
2. NOTIFICATIONS
a. The EPC will coordinate with the appropriate off-site agencies to determine their degree of participation.

Refer to APF-3400.5 for the list of pre-drill or exercise notifications.

b. The Drill Coordinator will notify the Drill Controllers and Observers of the planned drill or exercise date as well as the date of any pre-drill or exercise briefings.
c. The EPC will notify the affected on-site personnel at least one week before the drill or exercise, as appropriate. Refer to APF-3400.5.

B. PERFORMANCE

1. The Drill or Exercise Coordinator will conduct pre-drill or exercise briefings for Controllers and Observers as necessary.
2. The Drill or Exercise Coordinator will issue copies of the scenario "Drill/Exercise Observations Log (APF-3400.2)" and "Drill/Exercise Performance Evaluation Form" (APF-3400.3) to the Controllers and Observers prior to conducting the drill or exercise.
3. The Drill or Exercise Coordinator will conduct a briefing or issue any necessary instructions to players prior to the drill or exercise.
4. The Drill or Exercise Coordinator will coordinate the pre staging of players and the use of props as necessary.
5. The drill or exercise will be conducted as outlined in the scenario and/or discussed in the pre-drill or exercise briefings. Changes in the scenario during the drill or exercise should not be made without the approval of the Drill or Exercise Coordinator and EPC.

NOTE: A drill or exercise may be terminated at any time at the discretion of the Operations Shift Supervisor or plant management.

AP-3400 Rev. 11

6. The initiating announcement, as well as subsequent communications associated with the drill or exercise, shall include the words "THIS IS A DRILL."
7. The EPC will ensure that the necessary portions of AP-3425, "Emergency Equipment Readiness Check" and AP-3426, "Emergency Response Facilities Readiness Check" are performed following the scheduled drill or exercise.

C. CRITIQUE AND EVALUATION

1. The Drill or Exercise Coordinator will conduct a critique with Controllers/Observers and Players as soon as practicable following the drill or exercise.

NOTE: The critique should include representatives from the off-site agencies that participated in the drill or exercise. If necessary, a separate critique may be conducted.

2. The Drill or Exercise Coordinator will collect the completed evaluation forms along with any additional drill and/or critique documentation and forward it to the EPC.
3. The EPC will consolidate and review critique documentation and drill/exercise evaluation forms as soon as practicable following the critique.
4. The EPC will evaluate all comments and evaluation forms.

Drill/Exercise evaluation criteria for rating comments is outlined on APF-3400.4.

5. Initiate AP-0227, "Condition Reporting and Investigation" for any drill/exercise weakness or area of improvement.

D. FACILITY

1. Following the drill/exercise, the CR/TSC shall be returned to a ready condition by the participants. The Drill or Exercise coordinator and EPC shall ensure the facility has been returned to a ready state following the critique.

E. REPORTING AND TRACKING

1. The EPC and appropriate department managers should determine the corrective actions necessary to resolve drill or exercise weaknesses or areas for improvement.
2. The EPC will develop a drill or exercise summary/action plan following the scheduled drill or exercise. The drill or exercise summary/action plan will address all drill or

AP-3400 Rev. 11 exercise weaknesses and areas for improvement and shall include, but not be limited to:

  • a description of action items
  • a proposed resolution for the items
3. Within 60 days, the EPC will forward copies of the drill or exercise summary/action plan to the Decommissioning Manager, Plant Superintendent and Safety Oversight Manager.

F. DOCUMENTATION

1. The EPC will prepare a drill or exercise package which should include, but not be limited to:
a. Drill or Exercise Scenario Package
b. Controller/Observer Evaluation Forms (APF-3400.3)
c. Appropriate critique documentation
d. A copy of the drill or exercise summary/action plan
e. Any additional tracking documentation FINAL CONDITIONS
1. Drill or exercise documentation has been collected and evaluated.
2. The TSC has been returned to a ready state.
3. Items requiring corrective action have been documented and an action plan has been established.
4. YNPS management has been notified of drill or exercise results.

DRILL/EXERCISE SCENARIO PACKAGE FORMAT The following is an outline of information required for a Drill/Exercise Scenario Package. The actual format and production of the package will be determined by the Drill or Exercise Coordinator and should include (if appropriate), but not be limited to:

A. Drill/Exercise Specifics

  • Type of drill or exercise 0 Date, time and location of drill or exercise
  • Drill or Exercise Coordinator's name B. Drill/Exercise Scenario
  • Drill or Exercise objectives
  • Brief description of drill or exercise
  • Detailed sequence of events
  • Expected player actions
  • Simulated actions C. Drill/Exercise Scenario Data
  • Instrument responses
  • Event conditions 0 Vital signs (Medical drill)

D. Drill/Exercise Assignments

  • List of Players
  • List of Controllers/Observers E. Special Instructions/Actions 0 Precautions/hazard warnings for Players and Controller/Observers
  • Instructions for the pre-staging of Players
  • Instructions for the use of props APF-3400.1 Rev. 11 Page 1

DRILL/EXERCISE OBSERVATIONS LOG Time Observations/Comments 4

4 4

4

.4 4.

4.

4.

1.

4 4

4.

4

.4

.4 Name: Area Evaluated:

Date: Page of APF-3400.2 Rev. 11 Page 1

DRILL/EXERCISE PERFORMANCE EVALUATION FORM Name: Drill or Exercise Date:

Location:

Type of Drill or Exercise:

Information to Provide:

(Controller/Observers Only)

Time Commenced: Time Terminated:

OBSERVATIONS, COMMENTS AND RECOMMENDATIONS Note: Observations should include the proper and effective use of procedures, equipment, and personnel.

Note: Use additional pages as necessary.

Signature: Page _ of APF-3400.3 Rev. 11 Page 1 of 2

DRILL/EXERCISE PERFORMANCE EVALUATION FORM OBSERVATIONS, COMMENTS AND RECOMMENDATIONS (Continued)

Signature: Page _ of APF-3400.3 Rev. 11 Page 2 of 2

EMERGENCY PREPAREDNESS DRILL/EXERCISE EVALUATION CRITERIA Directions Complete the evaluation of the drill or exercise using the rating scale below.

Evaluations should be based on the drill or exercise objectives. Consider all comments or suggestions for improvement included on the Drill/Exercise Evaluation Forms.

RatinQ Symbol Comments and Suggested Improvements Strength S No comment necessary.

Weakness W Must be followed by comments, together with suggestions for improvement.

Areas for Improvement A May be followed by comments and suggestions for improvements.

Not Observed or N No comments or suggestions are Not Applicable required.

DEFINITIONS Strengths Strengths are actions taken by the ERO which provide strong positive indication of their ability to cope with abnormal conditions and effectively implement the Defueled Emergency Plan.

Weaknesses Weaknesses are findings that the ERO's demonstrated level of performance could have precluded effective implementation of the Defueled Emergency Plan in the event of an actual emergency in the area being observed. The existence of a weakness does not, of itself, indicate that overall response was inadequate to provide the required emergency response function or to protect the health and safety of the public.

Areas for Improvement Areas for improvement are findings which do not have a significant negative impact on the ability of the ERO to implement the Defueled Emergency Plan.

Although the emergency response related to a noted area for improvement is adequate, the finding should still be evaluated to determine if corrective action could be taken to improve performance.

APF-3400.4 Rev. 11 Page 1

PRE-DRILL/EXERCISE NOTIFICATIONS Appropriate notifications from Section A will be made by the EPC prior to any drill or exercise which involves offsite agencies.

A. Off-Site Agencies

1. North Adams Regional Hospital Person contacted: Date:

Degree of Participation:

2. Charlemont Fire Department - Ambulance Service:

Person contacted: Date:

Degree of Participation:

3. Williamstown Medical Associates:

Person contacted: Date:

Degree of Participation:

4. Massachusetts Emergency Management Agency Person contacted: Date:

Degree of Participation:

5. Rowe Fire Department Person contacted: Date:

Degree of Participation:

APF-3400.5 Rev. 11 Page 1 of 3

6. Shelburne Dispatch:

Person contacted: Date:

Degree of Participation:

7. Vermont Emergency Management Agency Person contacted: Date:

Degree of Participation:

8. Nuclear Regulatory Commission (NRC)

Person contacted: Date:

Degree of Participation:

9. Massachusetts Department of Public Health Person contacted: Date:

Degree of Participation:

10. Vermont Department of Public Health Person contacted: Date:

Degree of Participation:

APF-3400.5 Rev. 11 Page 2 of 3

11. Other (specify):

Person contacted: Date:

Degree of Participation:

B. On-Site Personnel Date Contacted

1. Decommissioning Manager
2. Plant Superintendent
3. Operations Supervisor
4. Maintenance/Construction Supervisor
5. Administrative Manager
6. Safety Oversight Manager
7. Fuel Storage Oversight Manager
8. Security Supervisor
9. Training Coordinator
10. FTOC Project Manager C. DE&S
1. Contingency Management Services Group Manager APF-3400.5 Rev. 11 Page 3 of 3

Proc. No. AP-3426 Rev. No. 17 Issue Date 08/2002 Review Date 11/2002 TECHNICAL SUPPORT CENTER (TSC) READINESS CHECK SCOPE To ensure the Technical Support Center (TSC) is periodically checked to verify that the facility is in an operable condition and to test its communications equipment and systems.

ENCLOSURES AP-3426 - Pg. 1 Attachment A - Pgs. 1-4 Attachment B - Pgs. 1-2 APF-3426.1 - Pg. 1 - Rev. 17 APF-3426.2 - Pg. 1 - Rev. 17 REFERENCES

1. Yankee Plant Defueled Emergency Plan
2. AP-0711, "Communications Systems"
3. DP-2005, "Operations Department Surveillance Schedule" DISCUSSION The Technical Support Center's (TSC) communication equipment shall be tested monthly utilizing the appropriate attachment. An inspection and inventory of the TSC shall be performed quarterly. These activities shall be performed as scheduled by Reference 3.

PRECAUTIONS None.

PREREQUISITES See individual attachments.

PROCEDURE See individual attachments.

FINAL CONDITIONS See individual attachments.

AP-3426 Rev. 17 Att. A ATTACHMENT A MONTHLY COMMUNICATION TESTS AT THE TSC PREREQUISITE

1. Notify the Operations Shift Supervisor prior to conducting communication tests.

PROCEDURE A. TELEPHONE SYSTEMS

1. Plant (AT&T Definity)

NOTE: Operability of plant extensions routinely used in the TSC may be verified by the office residents.

a. Ring the following TSC extensions from Ext. 2233:
  • 2252 o OP O INOP
  • 2232 [ OP 0 INOP
2. Verizon
a. Check for the presence of the following power fail telephones:
  • (SAS) 424-5261 (Ext. 2295)
  • (TSC) 424-5262 (Ext. 2232)
  • (CR) 424-5263 (Ext. 2302)

AP-3426 Rev. 17 Att. A

b. Check the operation of the following direct outside lines: (listen for dial tone, dial 424-5261 to talk to the plant phone operator).

0 424-5395 (Ops Station) D OP 0l INOP

  • 424-5473 (SS Desk) 0 OP 0 INOP
  • 424-5455 (Gatehouse location) 0 OP 0 INOP
3. Federal Telecommunication System (FTS)
a. Notify the Control Room that the FTS telephone will be tested from the TSC.
b. From a FTS telephone call the NRC by dialing 1-301-816-5100. State the following:

(1) Name (2) Location (3) Fact that telephone is being tested (4) Request a call back to the telephone being tested (answer from the FTS phone)

Control Room

  • FTS (700-661-5251) 0 OP [ INOP TSC 0 FTS (700-661-5251) 0l OP 0 INOP
4. Satellite Phones - Base Units NOTE: The base units are located in the TSC and CR/SAS areas.

These two phones are on the same line (i.e., both will ring at the same time).

AP-3426 Rev. 17 Att. A NOTE: The following guidelines should be utilized for the purpose of periodic testing the satellite phones so as to not incur unnecessary usage costs ($1.50 per min).

a. For outbound testing: 0 OP 0 INOP
1) Pick up the handset of one of the satellite (base unit) phones.
2) Dial: #8378 (must dial # key)
3) You should hear a recorded message confirming that your satellite phone is working.
4) Hang up the phone.
5) Repeat steps 1) through 4) for the other satellite (base unit) phone.
b. For inbound testing: 0 OP 0 INOP
1) From any regular landline phone, dial the satellite (base unit) phone number:

9-1-254-377-4745

2) Verify that both satellite phones ring - do not answer them!
3) Hang up the regular landline phone.

B. FACSIMILE MACHINE NOTE: Fax machine may be set up in Control Room at extension 2358 or in the Technical Support Center at extension 2252.

1. Send a test sheet from one machine to another (Refer to transmitting instructions at the machine)
2. Check the reproduction quality of the receiving machine:

0 OP 0 INOP C. Document results of this attachment on APF-3426.1, "TSC Discrepancies and Corrective Actions."

AP-3426 Rev. 17 Att. A D. If a communications discrepancy is found, then complete APF-0711.1, "Communications Problem Report," and forward it to the Plant Communications Coordinator.

E. Forward the completed procedure to Operations Management.

FINAL CONDITIONS

1. The completed procedure has been returned to Operations Management.
2. If applicable, the discrepancies found in the completion of this attachment have been corrected or forwarded to the Plant Communications Coordinator for corrective action.
3. The TSC is adequately equipped and functional to meet emergency contingencies.

Remarks:

Completed by:

Date/Time Reviewed by:

Shift Supervisor Date/Time Reviewed by:

Operations Management Date Reviewed by:

E-Plan Coordinator Date

AP-3426 Rev. 17 Att. B ATTACHMENT B QUARTERLY INVENTORY AND INSPECTION OF THE TSC PREREQUISITE

1. Notify the Operations Shift Supervisor prior to conducting communication tests.

PROCEDURE A. EQUIPMENT INVENTORY

1. Clock
  • Conventional (1)
2. Map
  • Site Plot Plan (Drawing No. 9699-FY-6A)
3. Blank White Status Board B. DOCUMENTS INVENTORY NOTE: The Site Services Department should be able to assist in determining the latest versions of necessary documents.
1. Complete APF-3426.2, "TSC Documents Reference List." Use this form to verify that the latest versions of required procedures, forms, and lists are available in the TSC. Also verify that the working copy files are of the latest versions.
2. Books
  • Defueled Implementing Procedures
  • DE&S Emergency Support Plan (CC No. 42)
  • Off-Site Dose Calculation Manual (ODCM)

(CC No. 15)

  • Procedures for Admission and Management of Radioactively Contaminated Patients at North Adams Regional Hospital
  • Op-Memos
  • Plant Procedures (CC No. 4)
  • Defueled Technical Specifications
  • Defueled Systems Training Manual (CC No. 3) 0 State of Vermont Notification Manual
  • YNPS SFP/ISFSI Recovery & Restoration Plan

AP-3426 Rev. 17 Att. B C. Document results of this attachment on APF-3426.1, "TSC Discrepancies and Corrective Actions."

D. Forward the completed procedure to Operations Management.

FINAL CONDITIONS

1. The latest versions of procedures, forms, and lists are in place.
2. The completed procedure has been returned to Operations Management.
3. If applicable, the discrepancies found in the completion of this attachment have been corrected.
4. The TSC is adequately equipped and functional to meet emergency contingencies.

Remarks:

Completed by:

Date/Time Reviewed by:

Shift Supervisor Date Reviewed by:

Operations Management Date Reviewed by:

E-Plan Coordinator Date

TSC DISCREPANCIES AND CORRECTIVE ACTIONS Date:

Check One: D Monthly Communications Tests Only (Att A)

El Quarterly TSC Checks Only (Att B)

Communications Problem(s)? 0 Yes 0 No If Yes, then document below, complete APF-0711.1 and forward to Plant Communications Coordinator.

DISCREPANCIES NOTED CORRECTIVE ACTIONS DATE I I I I I 4.

I t I 1 I t

4. 9
4. 9
1. 4
4. t
4. 4.

Completed by:

Date APF-3426.1 Rev. 17 Page 1

TSC DOCUMENTS REFERENCE LIST DOCUMENT WORKING FILES REVISION OR DATE OP-3300*

OP-3305*

OP-3315*

OP-3324*

OP-3343*

OP-3344*

AP-0711*

AP-0806*

AP-0809*

OP-4952*

OP-8041*

OP-8415*

OP-8421*

OP-Memo 2E-4*

OP-Memo 2E-5*

OP-Memo 2E-6*

YNPS In-Plant Telephone Listing*

DE&S (Marlboro) Telephone Listing*

Off-Site Dose Calculation Manual DE&S Emergency Support Plan Defueled Emergency Plan Defueled E-Plan Implementing Procedures Procedures for Admission and Management of Radioactively Contaminated Patients at North Adams Regional Hospital Plant Procedures Manual Defueled Technical Specification FSAR Defueled Training Manual State of Vermont Notification Manual APF-3426.2

  • Working Copies in Filing Cabinet Drawer Rev. 17 Page 1