Tech Spec for Amendment No. 207, Regarding Limiting Conditions for Operation and Surveillance Requirements
ML022130459
Person / Time
Site: Millstone Dominion icon.png
Issue date: 07/30/2002
From:
NRC/NRR/DLPM
To:
References
TAC MB3019
Download: ML022130459 (8)


Text

INDEX LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS SECTION PAGE DELETED Rod Drop Time............................................

3/4 1-25 Shutdown Rod Insertion Limit.............................

3/4 1-26 Control Rod Insertion Limits.............................

3/4 1-27 3/4.2 POWER DISTRIBUTION LIMITS 3/4.2.1 AXIAL FLUX DIFFERENCE....................................

3/4 2-1 Four Loops Operating.....................................

3/4 2-1 Three Loops Operating....................................

3/4 2-3 3/4.2.2 HEAT FLUX HOT CHANNEL FACTOR -

FQ(Z).....................

3/4 2-5 Four Loops Operating.....................................

3/4 2-5 Three Loops Operating....................................

3/4 2-12 3/4.2.3 RCS FLOW RATE AND NUCLEAR ENTHALPY RISE HOT CHANNEL FACTOR...................................................

3/4 2-19 Four Loops Operating.....................................

3/4 2-19 Three Loops Operating....................................

3/4 2-22 3/4.2.4 QUADRANT POWER TILT RATIO................................

3/4 2-24 3/4.2.5 DNB PARAMETERS...........................................

3/4 2-27 TABLE 3.2-1 DNB PARAMETERS........................................

3/4 2-28 3/4.3 INSTRUMENTATION 3/4.3.1 REACTOR TRIP SYSTEM INSTRUMENTATION......................

3/4 3-1 TABLE 3.3-1 REACTOR TRIP SYSTEM INSTRUMENTATION...................

3/4 3-2 TABLE 3.3-2 DELETED TABLE 4.3-1 REACTOR TRIP SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS.............................................

3/4 3-10 3/4.3.2 ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION..........................................

3/4 3-15 TABLE 3.3-3 ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION..........................................

3/4 3-17 TABLE 3.3-4 ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION TRIP SETPOINTS...........................

3/4 3-26 MILLSTONE - UNIT 3 v

Amendment No.

go, go, O, 97, 207 0803

INDEX LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS SECTION 3/4.9.6 3/4.9.7 3/4.9.8 3/4.9.9 3/4.9.10 3/4.9.11 3/4.9.12 3/4.9.13 3/4.9.14 FIGURE 3.9 FIGURE 3.9 FIGURE 3.9 FIGURE 3.9-REFUELING MACHINE CRANE TRAVEL -

SPENT FUEL STORAGE AREAS RESIDUAL HEAT REMOVAL AND COOLANT CIRCULATION High Water Level Low Water Level CONTAINMENT PURGE AND EXHAUST ISOLATION SYSTEM WATER LEVEL - REACTOR VESSEL WATER LEVEL - STORAGE POOL FUEL BUILDING EXHAUST FILTER SYSTEM.........

SPENT FUEL POOL - REACTIVITY SPENT FUEL POOL - STORAGE PATTERN I

MINIMUM FUEL ASSEMBLY BURNUP VERSUS NOMINAL INITIAL ENRICHMENT FOR REGION 1 4-OUT-OF-4 STORAGE CONFIGURATION............................

2 REGION 1 3-OUT-OF-4 STORAGE FUEL ASSEMBLY LOADING SCHEMATIC.........

3 MINIMUM FUEL ASSEMBLY BURNUP VERSUS NOMINAL INITIAL ENRICHMENT FOR REGION 2 STORAGE CONFIGURATION...

4 MINIMUM FUEL ASSEMBLY BURNUP AND DECAY TIME VERSUS NOMINAL INITIAL ENRICHMENT FOR REGION 3 STORAGE CONFIGURATION............................

3/4 9-6 3/4 9-7 3/4 3/4 3/4 3/4 3/4 3/4 3/4 3/4 9-8 9-9 9-10 9-11 9-12 9-13 9-16 9-17

. 3/4 9-18 3/4 9-19

. 3/4 9-20 3/4 9-21 3/4.10 SPECIAL TEST EXCEPTIONS 3/4.10.1 SHUTDOWN MARGIN 3/4.10.2 GROUP HEIGHT, INSERTION, Four Loops Operating Three Loops Operating 3/4.10.3 PHYSICS TESTS 3/4.10.4 REACTOR COOLANT LOOPS 3/4.10.5 DELETED AND POWER DISTRIBUTION LIMITS 3/4 10-1 3/4 10-2 3/4 10-3 3/4 10-4 3/4 10-5 3/4.11 DELETED 3/4.11.1 DELETED 3/4.11.2 DELETED 3/4.11.3 DELETED xii MILLSTONE - UNIT 3 0804 Amendment ;, p, lo, lo, 207 PAGE

INDEX RASES SECTION 3/4.7.11 SEALED SOURCE CONTAMINATION 3/4.7.12 DELETED 3/4.7.13 DELETED 3/4.7.14 AREA TEMPERATURE MONITORING 3/4.8 ELECTRICAL POWER SYSTEMS PAGE B 3/4 7-25 S..,B 3/4 7-25 3/4.8.1, 3/4.8.2, and 3/4.8.3 A.C.

SOURCES, D.C. SOURCES, AND ONSITE POWER DISTRIBUTION 3/4.8.4 DELETED........

3/4.9 REFUELING OPERATIONS 3/4.9.1 BORON CONCENTRATION........

3/4.9.2 INSTRUMENTATION........

3/4.9.3 DECAY TIME 3/4.9.4 CONTAINMENT BUILDING PENETRATIONS................

3/4.9.5 COMMUNICATIONS 3/4.9.6 REFUELING MACHINE........

3/4.9.7 CRANE TRAVEL - SPENT FUEL STORAGE AREAS............

3/4.9.8 RESIDUAL HEAT REMOVAL AND COOLANT CIRCULATION.......

3/4.9.9 CONTAINMENT PURGE AND EXHAUST ISOLATION SYSTEM 3/4.9.10 and 3/4.9.11 WATER LEVEL - REACTOR VESSEL AND STORAGE POOL 3/4.9.12 FUEL BUILDING EXHAUST FILTER SYSTEM..............

3/4.9.13 SPENT FUEL POOL -

REACTIVITY 3/4.9.14 SPENT FUEL POOL - STORAGE PATTERN................

3/4.10 SPECIAL TEST EXCEPTIONS 3/4.10.1 SHUTDOWN MARGIN........

3/4.10.2 GROUP HEIGHT, INSERTION, AND POWER DISTRIBUTION LIMITS 3/4.10.3 PHYSICS TESTS..........

3/4.10.4 REACTOR COOLANT LOOPS......

3/4.10.5 DELETED MILLSTONE - UNIT 3 0805 B 3/4 8-1 B 3/4 8-3 B 3/4 B 3/4 B3/4 B 3/4 B 3/4 B 3/4 B 3/4 B3/4 B 3/4 9-1 9-1 9-1 9-1 9-1 9-2 9-2 9-2 9-7 B 3/4 9-8 B 3/4 9-8 B 3/4 9-8 B 3/4 9-9 B 3/4 10-1 B 3/4 10-1 B 3/4 10-1 B 3/4 10-1 xv Amendment No. F, $9, J9, 197, 119, 7l;,

0, Jfl, 207 BASES I

REACTIVITY CONTROL SYSTEMS POSITION INDICATION SYSTEMS - OPERATING ITMTTTNA CCNDTTTQN FOR QPFRATTON 3.1.3.2 The Digital Rod Position Indication System and the Demand Position Indication System shall be OPERABLE and capable of determining the control rod positions within +/-12 steps.

APPLICABILITY:

MODES 1 and 2.

ACTION:

a.

With a maximum of one digital rod position indicator per bank inoperable:

1.

Determine the position of the nonindicating rod(s) indirectly by the movable incore detectors at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> and immediately after any motion of the nonindicating rod which exceeds 24 steps in one direction since the last determination of the rod's position, or

2.

With four loops operating, reduce THERMAL POWER to less than 50% of RATED THERMAL POWER within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, or

3.

With three loops operating, reduce THERMAL POWER to less than 32% of RATED THERMAL POWER within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

b.

With a maximum of one demand position indicator per bank inoperable:

1.

Verify that all digital rod position indicators for the affected bank are OPERABLE and that the most withdrawn rod and the least withdrawn rod of the bank are within a maximum of 12 steps of each other at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, or

2.

With four loops operating, reduce THERMAL POWER to less than 50% of RATED THERMAL POWER within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, or

3.

With three loops operating, reduce THERMAL POWER to less than 32% of RATED THERMAL POWER within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

SIIRVFII I ANrF RFQIIIRFMFNTS 4.1.3.2.1 Each digital rod position indicator shall be determined to be OPERABLE by verifying that the Demand Position Indication System and the Digital Rod Position Indication System agree within 12 steps at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> except during time intervals when the rod position deviation monitor is inoperable, then compare the Demand Position Indication System and the Digital Rod Position Indication System at least once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

4.1.3.2.2 Each of the above required digital rod position indicator(s) shall be determined to be OPERABLE by verifying that the digital rod position indicators agree with the demand position indicators within 12 steps when exercised over the full-range of rod travel at least once per 24 months.

Amendment No.

go, g, jg 207 MILLSTONE - UNIT 3 0806 3/4 1-23

THIS PAGE INTENTIONALLY LEFT BLANK MILLSTONE - UNIT 3 0806 3/4 1-24 Amendment No. g, ;11,100, 207

THIS PAGE INTENTIONALLY LEFT BLANK MILLSTONE - UNIT 3 0807 3/4 10-6 Amendment No. 777,207

3/4.10 SPECIAL TEST EXCEPTIONS BASES 3/4.10.1 SHUTDOWN MARGIN This special test exception provides that a minimum amount of control rod worth is immediately available for reactivity control when tests are performed for control rod worth measurement.

This special test exception is required to permit the periodic verification of the actual versus predicted core reactivity condition occurring as a result of fuel burnup or fuel cycling operations.

3/4.10.2 GROUP HEIGHT, INSERTION, AND POWER DISTRIBUTION LIMITS This special test exception permits individual control rods to be positioned outside of their normal group heights and insertion limits during the performance of such PHYSICS TESTS as those required to:

(1) measure control rod worth, and (2) determine the reactor stability index and damping factor under xenon oscillation conditions.

3/4.10.3 PHYSICS TESTS This special test exception permits PHYSICS TESTS to be performed at less than or equal to 5% of RATED THERMAL POWER with the RCS Tvg slightly lower than normally allowed so that the fundamental nuclear characteristics of the core and related instrumentation can be verified.

In order for various charac teristics to be accurately measured, it is at times necessary to operate outside the normal restrictions of these Technical Specifications.

For instance, to measure the moderator temperature coefficient at BOL, it is necessary to position the various control rods at heights which may not normally be allowed by Specification 3.1.3.6 which in turn may cause the RCS T.,, to fall slightly below the minimum temperature of Specification 3.1.1.4.

3/4.10.4 REACTOR COOLANT LOOPS This special test exception permits reactor criticality under no flow conditions and is required to perform certain STARTUP and PHYSICS TESTS while at low THERMAL POWER levels.

3/4.10.5 DELETED MILLSTONE -

UNIT 3 B 3/4 10-1 Amendment No. 717, 0808 207

THIS PAGE INTENTIONALLY LEFT BLANK MILLSTONE - UNIT 3 0808 B 3/4 10-2 Amendment No. 777, 207