PROPOSED NRC-AUTHORIZED ADMINISTRATIVE JPMS FOR THE LASALLE INITIAL EXAMINATION - APRIL 2002
LASALLE COUNTY NUCLEAR STATION JOB PERFORMANCE MEASURE Conduct of Operations Questions:
Overtime Question License Reactivation Question Examination Level: RO t A Date: April 8, 2002 Developed by: Raymond Keith Walton Reviewed by:
Approved by:
Date:
Date:
Date.
'I Ig I
JOB PERFORMANCE MEASURE Facility: LaSalle Nuclear Station Task No:
A.1.a Task
Title:
Overtime Question & License Reactivation Question (Conduct of Operations)
K/A
Reference:
2.1.1 K/A Importance:
3.7/3.8 Examinee:
NRC Examiner:
Date:
Time Started:
Time Critical Task: NO Method of testing:
Performance:
Simulated X
Actual Time Finished:
Estimated Completion Time:
Location:
X Simulator Plant Task Standard:
Required Materials:
General
References:
LS-AA-1 19, Overtime Controls, Rev. 3.
OP-AA-101-701, NRC Active License Maintenance, Rev. 2.
READ TO THE EXAMINEE:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. Tell me when you have successfully complete the task. References can be used.
Q1: The plant is in Mode 1 with normal maintenance activities in progress. You are a reactor operator on Unit 1 working an 8-hour shift. You take the shift (after turnover) at 6:30 am. You take a total of 30 minutes for lunch and breaks on the 2nd shift. Your relief calls in sick and you must work a double shift.
You take another 30 minutes for dinner and breaks on the 3 rd shift. You commence turnover at midnight and leave the site shortly thereafter. Tomorrow, you must take the reactor operators position on Unit 1 (after turnover) by 6:30 am. Do you need an Overtime Guidance Deviation Authorization prior to taking the watch? Why or why not? Justify your answer.
Q2:
"n.tle last quarter you were
'a! leave for 6 weeks, thc:,
";-,:-.d to work as an operatior!7 procedure writer for the remainder of the quarter. Your requalification and respirator training is cu;,c*. You have returned to the control room 4 days ago and have performed a plant tour and shift turn)vul. 'You have completed three i2-ii
, shills, under instruction, in the U,,it NSO position. Can you stan'. vv*,*k* as the Unit NSO without inslrL..
n today? Why or why not? Justify your answer.
JOB PERFORMANCE MEASURE Simulator Setup Instructions:
- 1.
None
JOB PERFORMANCE MEASURE Operating Test Al, Conduct of Operations QI: The plant is in Mode 1 with normal maintenance activities in p-ogress. You are a reactor operator on Unit 1 working an 8-hour shift. You take the s-ift (after turnover) at 6:30 am. You take a total of 30 minutes for lunch and breaks on me 2nd shift. Your relief calls in sick and you must work a double shift. You take ano:mer 30 minutes for dinner and breaks on the 3 rd shift. You commence turnover at miclight and leave the site shortly thereafter. Tomorrow, you must take the reactor oper_:ors position on Unit 1 (after turnover) by 6:30 am. Do you need an Overtime Guidance Deviation Authorization prior to taking the watch? Why or why not? Justify. our answer.
JOB PERFORMANCE MEASURE Operating Test A.1, Conduct of Operations Q2: During the last quarter you were on medical leave for 6 weeks, then returned to work as an operations procedure writer for the remainder of the quarter. Your requalification and respirator training is current. You have returned to the control room 4 days ago and have performed a plant tour and shift turnover. You have completed three 12-hour shifts, under instruction, in the Unit NSO position. Can you stand watch as the Unit NSO without instruction today? Why or why not? Justify your answer.
JOB PERFORMANCE MEASURE 01: The plant is in Mode 1 with normal maintenance activities in progress. You are a reactor operator on Unit 1 working an 8-hour shift. You take the shift (after turnover) at 6:30 am. You take a total of 30 minutes for lunch and breaks on the 2nd shift. Your relief calls in sick and you must work a double shift. You take another 30 minutes for dinner and breaks on the 3 rd shift. You commence turnover at midnight and leave the site shortly thereafter. Tomorrow, you must take the reactor operators position on Unit 1 (after turnover) by 6:30 am. Do you need an Overtime Guidance Deviation Authorization prior to taking the watch? Why or why not? Justify your answer.
Al:
Yes you need an Overtime Guidance Deviation Authorization prior to taking the watch. You have worked a total of 17.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> but must exclude 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> of non Generic Letter 82-12 hours (breaks and meals). This totals 16.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> worked in a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period. You must have 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> of rest prior to taking the watch. Those 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> started when you commenced turnover at midnight. Therefore, you can not take the watch prior to 8:00 am the following day.
Reference LS-AA-1 19, Overtime Controls
JOB PERFORMANCE MEASURE Operating Test A.1, Conduct of Operations Q2: During the last quarter you were on medical leave for 6 weeks, then returned to work as an operations procedure writer for the remainder of the quarter. Your requalification and respirator training is current. You have returned to the control roo."
4 days ago and have performed a plant tour and shift turnover. You have completec three 12-hour shifts, under instruction, in the Unit NSO position. Can you stand watc.'
as the Unit NSO without instruction today? Why or why not? Justify your answer.
A2: No. RO and SRO licenses can be maintained by actively performing the functio-s of RO (Unit NSO or Assistant NSO) or SRO (Shift Manager or Unit Supervisor) for a minimum of seven 8-hour shifts or five 12-hour shifts per calendar quarter.
Reference:
OP-AA-1 01-701, NRC Active License Maintenance (CUE) THIS COMPLETES THIS JPM Record Stop Time:
VERIFICATION OF COMPLETION Job Performance Measure No.
Examinee's Name:
Examiner's Name:
Date performed:
Number of attempts:
Time to complete:
Question Documentation:
Question:
Response
Result: SAT or UNSAT Examiner's sicm,ýatiire and date:
LASALLE COUNTY NUCLEAR STATION JOB PERFORMANCE MEASURE Conduct of Operations Questions:
Overtime Question License Reactivation Question Examination Level: SRO /SRO(I)
Date: April 8, 2002 Developed by: Raymond Keith Walton Date:
Reviewed by:
Approved by:
Date:,
Date:__
-- I
JOB PERFORMANCE MEASURE Facility: LaSalle Nuclear Station Task No:
A.1.a Task
Title:
Overtime Question & License Reactivation Question (Conduct of Operations)
K/A
Reference:
2.1.1 K/A Importance:
3.7/3.8 Examinee:
Date:
NRC Examiner:
Time Started:
Time Finished:
Estimated Completion Time:
Time Critical Task: NO Method of testingq:
Performance:
Simulated X
Actual Location:
X Simulator Plant Task Standard:
Required Materials:
General
References:
LS-AA-1 19, Overtime Controls, Rev. 0 OP-AA-101-701, NRC Active License Maintenance, Rev. 2.
READ TO THE EXAMINEE:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. Tell me when you have successfully complete the task. References are available for use.
QI: The plant is in Mode 1 with normal maintenance activities in progress. You are a unit supervisor on Unit 1 working an 8-hour shift. You take the shift (after turnover) at 6:30 am. You take a total of 30 minutes for lunch and breaks on the 2nd shift. Your relief calls in sick and you must work a double shift.
You take another 30 minutes for dinner and breaks on the 3r' shift. You commence turnover at midnight and leave the site shortly thereafter. Tomorrow, you must take the unit supervisor position on Unit 1 (after turr-,er) by 6:30 am. Do you need an Overtime Guidance Deviation A, thorization prior to taking the watch? \\W'hy or why not? Justify your answer.
U2: I
!ast quarter you w*re &.'e for 6 weeks, tOr cv k as an operaor n"rrcedure writer for the rem'ind'ir of the quarter. Your reque-fircp
,n and respirator training is cu!;
have returned to the ceno,.ie* !oin 4 days ago and have i
.d a plant tour and shift turno iiavu completed three I, i,
,s, under instruction, i,,
, dp ivisor position.
Can
-' wach as the Unit Sup
,-,*vi..i out instruction today? '. ".'
.- - not? Justify your ans,.
JOB PERFORMANCE MEASURE Simulator Setup Instructions:
- 1.
None
JOB PERFORMANCE MEASURE Operating Test Al, Conduct of Operations Q1: The plant is in Mode 1 with normal maintenance activities in progress. You are a unit supervisor on Uni: 1 working an 8-hour shift. You take the shift (after turnover) at 6:30 am. You take a total of 30 minutes for lunch and breaks on the 2 nd shift. Your relief calls in sick and you must work a double shift. You take another 30 minutes for dinner and breaks on the 3 rd shift. You commence turnover at midnight and leave the site shortly thereafter. Tomorrow, you must take the unit supervisor position on Unit 1 (after turnover) by 6:30 am. Do you need an Overtime Guidance Deviation Authorization prior to taking the watch? Why or why not? Justify your answer.
JOB PERFORMANCE MEASURE perating Test A. 1, Conduct of Operations Q2: During the last quarter you were on medical leave for 6 weeks, then returned to work as an operations procedure writer for the remainder of the quarter. Your requalification and respirator training is current. You have returned to the control room 4 days ago and have performed a plant tour and shift turnover. You have completed three 12-hour shifts, under instruction, in the Unit Supervisor position. Can you stand watch as the Unit Supervisor without instruction today? Why or why not? Justify your answer.
JOB PERFORMANCE MEASURE Q1: The plant is in Mode 1 with normal maintenance activities in progress. You are a unit supervisor on Unit 1 working an 8-hour shift. You take the shift (after turnover) at 6:30 am. You take a total of 30 minutes for lunch and breaks on the 2 nd shift. Your relief calls in sick and you must work a double shift. You take another 30 minutes for dinner and breaks on the 3rd shift. You commence turnover at midnight and leave the site shortly thereafter. Tomorrow, you must take the unit supervisor position on Unit 1 (after turnover) by 6:30 am. Do you need an Overtime Guidance Deviation Authorization prior to taking the watch? Why or why not? Justify your answer.
Al:
Yes you need an Overtime Guidance Deviation Authorization prior to taking the watch. You have worked a total of 17.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> but must exclude 1.0 hour0 days <br />0 hours <br />0 weeks <br />0 months <br /> of non Generic Letter 82-12 hours (breaks and meals). This totals 16.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> worked in a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period. You must have 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> of rest prior to taking the watch. Those 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> started when you commenced turnover at midnight. Therefore, you can not take the watch prior to 8:00 am the following day.
Reference LS-AA-1 19, Overtime Controls
JOB PERFORMANCE MEASURE Operating Test A.1, Conduct of Operations Q2: During the last quarter you we-e on medical leave for 6 weeks, then returned to work as an operations procedu-e writer for the remainder of the quarter. Your requalification and respirator train ig is current. You have returned to the control room 4 days ago and have performed a plant tour and shift turnover. You have completed three 12-hour shifts, urder instruction, in the Unit Supervisor position.
Can you stand watch as the Unit Supervisor without instruction today? Why or why not? Justify your answer.
A2: No. RO and SRO licenses can be maintained by actively performing the functions of RO (Unit NSO or Ass stant NSO) or SRO (Shift Manager or Unit Supervisor) for a minimum of seven 8-hour or five 12-hour shifts per calendar quarter.
Reference:
OP-AA-101-701, NRC Active License Maintenance (CUE) THIS COMPLETES THIS JPM Record Stop Time:
VERIFICATION OF COMPLETION Job Performance Measure No.
Examinee's Name:
Examiner's Name:
Date performed:
Number of attempts:
Time to complete:
Question Documentation:
Question:
Response
Result: SAT or UNSAT Examiner's siinnt ire and date:
LASALLE COUNTY NUCLEAR STATION JOB PERFORMANCE MEASURE Perform Core Operating Limits Surveillance Examination Level: RO/SRO Date: April 8, 2002 Developed by: Raymond Keith Walton Reviewed by:
Date: 3/14/2002 Date:
Approved by:
i i
-S.
a---
-
a
re
JOB PERFORMANCE MEASURE Facility: LaSalle Nuclear Station Task No:
A.1.b Task
Title:
Core Operating Limits Reports Surveillance Job Performance Measure No:
K/A
Reference:
2.1.7 Examinee
NRC Examiner:
Time Started:
Estimated Completion Time:
5 min Method of testingq:
Performance:
Simulated X
Actual K/A Importance:
3.7/4.4 Date:
Time Finished:
Time Critical Task: NO Location:
X Simulator Plant Task Standard:
Required Materials:
CMSS Core Performance Log for Unit at full power - OD20 (defective).
Control Rod Position (OD 7),
Core Performance Log and Fuel Bundle Thermal Data (OD6)
General
References:
LOS-AA-S101, Unit 1 Shiftly Surveillance, Rev 7, 4/26/2001 LOP-CX-20, Core Power Distribution Calculation (OD 20), Rev 10, 3/14/2000 LOP-CX-07, Control Rod Position (OD 7), Rev 2, 1/5/1989 LOP-CX-06, Core Performance Log and Fuel Bundle Thermal Data (OD6), Rev 6, 3/6/2001 READ TO THE EXAMINEE:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. Tell me when you have successfully complete the task.
Initial Conditions:
You are the NSO on Unit 1. Unit 1 is operaling at full power on 107.2% rcd line.
Initiatinq Cue:
The,
- ->wverPlex print6ut has ju Section E.1.2.
Perform LOS-AA-S 0:
ý ififtly Surveillance, Page 2 of 7
JOB PERFORMANCE MEASURE Simulator Setup Instructions:
- 1.
Have candidate demand an OD-7printout, OD-20 printout and an OD-6 printout. The examiner will present them with the necessary printouts after each one is demanded.
- 2.
Faults on printouts:
MAPRAT reads 1.01 Control Rod out of sequence/symmetry Page 3 of 7
JOB PERFORMANCE MEASURE INITIAL CONDITIONS Initial Conditions:
You are the NSO on Unit 1. Unit 1 is operating at full power on 107.2% rod line.
Initiating Cue:
The 0700 PowerPlex printout has printed. Perform LOS-AA-.S101, "Unit 1 Shiftly Surveillance,"
Section E.1.2.
Page 4 of 7
JOB PERFORMANCE MEASURE (Denote critical steps with an asterisk)
H 2
H
(.1)
Z
':
z 5
- 0)
D 2
Expected Response
- 1.
REVIEW copy of LOS-AA S101, Unit 1 Shiftly Surveillance
- 2.
DEMANDS OD-7 program per LOP-CX-07, Option 2.
- 3.
REVIEWS printout for core symmetry and rods out of position. NOTIFIES Supervisor
- 4.
DEMANDS CMSS Core Performance Log per LOP-CX 20 (OD-20) or an OD-6 program per LOP-CX-06.
- 5.
CHECK APLHGR by verifying MAPRAT < 1.00. REPORT that MAPRAT NOT
<1.00. IDENTIFY TS 3.2.1.1.
applies.
CUE: After candidate demands printout, provide candidate a copy of OD-7 printout.
Notifies Supervisor core NOT symmetrical, rod out of position.
CUE: After candidate demands prinout, provide candidate a copy of OD-20 printout or OD-6 printout.
MAPRAT NOT < 1.00 CUE: Unit Supv. will review TS ACTION statement to ensure compliance.
Page 5 of I Element
JOB PERFORMANCE MEASURE (Denote critical steps with an asterisk)
Q)
"E U)
E F-03 E
Z o
U)
D 0
Element
- 7.
CHECK MFLPD is < 1.00 and MFDLRX is < 1.00
- 8.
CHECK MCPR by verifying MFLCPR is < 1.00
- 9.
CHECK difference between APRM channels & calculated power. VERIFY difference
<2%.
- 10.
CHECK Power to Flow Map that unit operation is in Region C (ill).
- 11.
CHECK Power to Flow Map that unit is NOT operating outside of the analyzed MELLLA region.
(CUE) THIS COMPLETES THIS JPM Record Stop Time:
Expected Response MFLPD is < 1.00 and MFDLRX is < 1.00 MFLCPR is < 1.00 Absolute difference between APRM channels and calculated power <2%.
Unit is operating in Region C (111).
Unit is NOT operating outside of analyzed MELLLA region.
Page 6 of 7
VERIFICATION OF COMPLETION Job Performance Measure No.
Exar iee's Name:
Exam ner's Name:
Date oerformed:
Number of attempts:
Time :o complete:
Quesion Documentation:
Queston:
Response
ResuT SAT or UNSAT Examiner's signaturo and date:
Page 7 7),
7
LASALLE COUNTY NUCLEAR STATION JOB PERFORMANCE MEASURE Review an Out of Service Examination Level: RO /SRO /SRO(U)
Date: April 8, 2002 Developed by: Raymond Keith Walton Reviewed by:
. [)Vi,.\\/ed by:
Date: 3/13/2002 Date:
I,
JOB PERFORMANCE MEASURE Facility: LaSalle Nuclear Station Task
Title:
Review an Out of Service Task No:
A.2 Job Performance Measure No:
K/A
Reference:
2.2.13 Examinee:
NRC Examiner:
K/A Importance:
3.6/3.8 Time Started:
Estimated Time of Completion Time Finished:
Time Critical Task: NO Method of testing:
Performance:
Simulated X
Actual Location:
X Simulator Plant Task Standard:
Required Materials:
A prepared POOS package ready for second verification with errors:
An OOS request including the EPN, fictitious WR number, isolation type (mechanical &
electrical) and total work scope.
Data pages for equipment to be tagged.
General
References:
OP-AA-101-201 available for review.
PNIDs available for review.
READ TO THE EXAMINEE:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. Tell me when you have successfully complete the task.
Initial Conditions:
Unit 1 is shutdown in Mode 5 for an outage. You are an extra NSO reviewing POOS. The EWCS system is unavailable to you.
lnitiFti~n2g Cue:
Thp \\.ir-F;,rc, 'tinn Center Stpervicrnr directs you to provide a review of a POOS for replacement of i
.j pump. lnforiti" "A cxcution Center Super\\!
your review is compiet.:
or if 2 r,,,,*ion is required.- :
Page 2 of 6 Date:
JOB PERFORMANCE MEASURE Simulator Setup Instructions:
- 1.
None Page 3 of 6
JOB PERFORMANCE MEASURE INITIAL CONDITIONS Initial Conditions:
Unit 1 is shutdown in Mode 5 for an outage.
You are an extra NSO reviewing POOS.
The EWCS system is unavailable to you.
Initiating Cue:
The Work Execution Center Supervisor directs you to provide a review of a POOS for replacement of the LPCS water leg pump. Inform the Work Execution Center Supervisor when your review is complete or if a revision is required.
Page 4 of 6
JOB PERFORMANCE MEASURE (Denote critical steps with an asterisk)
NOTE: The candidate may review OP-AA-101-201, Station Equipment Out of Service prior to and/or during the review Element E
I-c E
Z o
0I D
0 Expected Response
- 1.
Review OOS request to determine scope.
- 2.
Utilize Attachment 4, Hang Activity Preparer's Checklist.
- 3.
ENSURE an adequate zone of protection is provided for all attached work request tasks, and that Boundary Verification and sequencing are correct.
- 4.
RETURN for revision or REVISE the OOS if discrepancies are identified.
OOS reviewed Utilizes Attachment 4.
Candidate determines zone of protection is NOT adequate. Did not tag out of service valve F085A.
Candidate returns POOS to Work Execution Center Supv or Unit Supv identifying that OOS did not include valve F085A.
(CUE) THIS COMPLETES THIS JPM Record Stop Time:
Page 5 of 6
VERIFICATION OF COMPLETION Job Performance Measure No.
Examinee's Name:
Examiner's Name:
Date performed:
Number of attempts:
Time to complete:
Question Documentation:
Question:
Response
Result: SAT or UNSAT Examiner's signature and date:
Page 6 of 6
LASALLE COUNTY NUCLEAR STATION JOB PERFORMANCE MEASURE Review a Radiation Work Permit Examination Level: RO /SRO /SRO(I)
Date: April 8, 2002 Developed by: Raymond Keith Walton Date: March 14, 2002
'I
JOB PERFORMANCE MEASURE Facility: LaSalle Nuclear Station Task No:
A.3 Task
Title:
Review a Radiation Work Permit Job Performance Measure No:
K/A
Reference:
2.3.10 K/A Importance:
2.9/3.3 Examinee:
NRC Examiner:
Date:
Time Started:
Time Finished:
Estimated Time to Completion:
Time Critical Task: NO Method of testing:
Performance:
X Simulated Location:
X Simulator Actual Plant Task Standard:
Required Materials:
A completed RWP for TIP room. Ensure dose rate on the survey map is >500rad/hr in the work area.
Expected time to complete the task is 15 minutes.
General References (Available for candidate review):
RP-AA-203, Exposure Review and Authorization, Rev 0 RP-AA-460, Controls for High and Very High Radiation Areas, Rev 1.
READ TO THE EXAMINEE:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. Tell me when you have successfully complete the task.
Initial Conditions:
Unit 1 is operating in Mode 1. Your current radiation exposure history is as follows:
Annual Non LaSalle Station TEDE Dose 1490 mrem Annual LaSalle Station TEDE Dose 420 mrem Previous 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> DDE dose at LaSalle from 10 mrem RWPs other than RWP 2002-0999 You are not considered to have a High Lifetime Exposure.
Initiating Cue:
You have been assigned to the FIN maintenance team and have been tasked to support a maintenance activity inside the TIP room. To complete the task will take at least 15 minutes. Review your dose and area maps to determine how to complete this task:
Without exceeding any exposure control levels V
- ......;rols you need to gain acc "
.:e room Siiting requirements D
.o S i iri Y.
Page 2 oif /
JOB PERFORMANCE MEASURE Simulator Setup Instructions:
- 1.
Need: an RWP Rad Survey map of TIP room with radiation levels of 500 mrac hr.
Page 3 oi 7
JOB PERFORMANCE MEASURE Initial Conditions:
Unit 1 is operating in Mode 1. Your current radiation exposure history is as follows:
Annual Non LaSalle Station TEDE Dose 1490 mrem Annual LaSalle Station TEDE Dose 420 mrem Previous 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> DDE dose at LaSalle from 10 mrem RWPs other than RWP 2002-0999 You are not considered to have a High Lifetime Exposure.
Initiating Cue:
You have been assigned to the FIN maintenance team and have been tasked to support a maintenance activity inside the TIP room. To complete the task will take at least 15 minutes.
Review your dose and area maps to determine how to complete this task:
Without exceeding any exposure control levels What controls you need to gain access to the room Suiting requirements Dosimetry.
Page 4 of 7
JOB PERFORMANCE MEASURE (Denote critical steps with an asterisk)
NOTE to Examiner: The candidate may complete the elements portion of this JPM in any order.
Element E
Ci)
E z
o Co D
0 Expected Response
- 1.
REVIEWS RWP 2002-0999.
- 2.
COMPUTES maximum expected dose for job as:
500 mrad X 1 mrad/mrem (QF)
X 0.25 hrs = 125 mrem
NOTIFIES Supervisor that will need to have RPM permission to exceed 2000 mrem dose exposure limit.
- 4.
DETERMINES that DDE with job will exceed RP-AA-203 administrative exposure limits.
NOTIFIES Supervisor that will need to have RPM permission to exceed 300 mrem DDE exposure limit.
- 5.
DETERMINES that area is considered contaminated and williieed Class 2 clothing.
RWP 2002-0999 reviewed Determines that Gamma radiation has a Quality Factor of 1. Completes dose estimate calculation.
1490 mrem + 420 mrem + 10+
125mrem = 2045 mrem. This exceeds RP-AA-203 exposure limits of 2000 mrem.
CUE: I will notify RPM of need to exceed exposure limit.
DDE Calculation:
190 mrem + 125 mrem = 315 mrem.
This exceeds RP-AA-203 exposure limits of 300 mrem DDE.
CUE: I will notify RPM of need to exceed DDE exposure limit.
RWP states that Class 2 clothing is required for entry.
Page 5 of 7
JOB PERFORMANCE MEASURE (Denote critical steps with an asterisk)
I-o3 F
z c
Wl D
c.
Expected Response
- 6.
NOTIFIES supervisor that this area is a Locked High Radiation Area and needs keys for entry.
- 7.
NOTIFIES supervisor that RP must be present upon entry into room.
- 8.
(Special Dosimetry Req'ts?)
RWP states that area is locked and RP must maintain control of keys.
RWP states that RP must be present when candidates enters room.
RWP states requirements for dosimetry.
(CUE) THIS COMPLETES THIS JPM Record Stop Time:
Page 6 of 7 Element
VERIFICATION OF COMPLETION Job Performance Measure No.
Examinee's Name:
Examiner's Name:
Date performed:
Number of attempts:
Time to complete:
Question Documentation:
Question:
Response
Result: SAT or UNSAT Examincr s signature and date:
Page 7 of 7
LASALLE COUNTY NUCLEAR STATION JOB PERFORMANCE MEASURE Classify the GSEP Event, Determine PARS and Complete a NARS Form for Transmittal Examination Level: SRO / SRO(U)
Date: April 8, 2002 Developed by: Raymond Keith Walton Reviewed by:
Approved by-Date: 3/14/2002 Date:
Date:
j II
JOB PERFORMANCE MEASURE Facility: LaSalle Nuclear Station Task No:
A.4 Task
Title:
Classify GSEP Event, Determine PARS and Complete a NARS Form for Transmittal K/A
Reference:
2.4.38 K/A Importance:
2.2/4.0 Examinee:
NRC Examiner:
Date:
Time Started:
Time Finished:
Time Critical Task: YES, From time candidate classifies the event, the candidate must complete NARS form and complete data transmission within 15 minutes.
Estimated Time to Completion:
Method of testing:
Performance:
X Simulated Location:
X Simulator Actual Plant Task Standard:
Required Materials:
Blank NARS form from EP-AA-1 14, Attachment 1.
General
References:
EP-AA-114, Notifications, Rev. 0 LaSalle JPM P-EP-04, Rev 3, 7/21/1999 READ TO THE EXAMINEE:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. Tell me when you have successfully complete the task.
Initial Conditions:
You are the Shift Manager with the following plant conditions: Unit 1 has experienced a small LOCA. All rods are in, Drywell pressure is stable a 4 psig, All required PCIS isolations are complete, Reactor pressure is 800 psig and lov.'cring slowly, Reactor level is 36" with the MDRFP on line, Containment rad levels have risen to 8100 R/hr, U1 SBGT operating maintaining dP at -0.3 inch water. Stack WRGM reading 7.8E2 uCi/sec, S.CT V'RGM reading 6.5E2 uCi/sec. The A-Model is NOT available.
Lng Cue:
/ s Acting Station Director, r'i-s&fy this GSEP event, determine the Protective Action Recommnndrthions for Offsite Personnel and pie-,pare a Nuclear Accident Reporiing System form for transmittal by a GSEP communicator. This is a t,",. cr! iical JPM.
Page 2 of 6
JOB PERFORMANCE MEASURE Simulator Setup Instructions:
- 1.
None Page 3 of 6
JOB PERFORMANCE MEASURE INITIAL CONDITIONS This is a Time Critical JPM.
Initial Conditions:
You are the Shift Manager with the_ following plant conditions:
Unit 1 has experie-ced a small LOCA.
All rods are in Drywell pressure is stable a 4 psig, (no venting in progress)
All required PCIS isolations are complete Reactor pressure is 800 psig and lowering slowly Reactor level is 36' with the MDRFP on line Containment rad le,/els have risen to 8100 R/hr Ul SBGT operating maintaining dP at -0.3 inch water Stack WRGM reac ng 7.8E2 uCi/sec, SBGT WRGM reading 6.5E2 uCi/sec.
The A-Model is NOT available.
Wind Direction is 295 degrees.
Wind Speed is 10 mph.
Initiating Cue:
As the Acting Station Director, you must:
- 1.
Classify this GSEP event
- 2.
Determine the Prc:ective Action Recommendations for Offsite Personnel
- 3.
Prepare a Nuclear Accident Reporting System form for transmittal by a GSEP communicator.
Page 4 oir 6
JOB PERFORMANCE MEASURE (Denote critical steps with an asterisk)
Provide candidate with copy of EP-AP-1 14, Notifications after candidate locates procedure.
a)
E
-0 E
z o
U)
Z 0
Expected Response
"*1. Determines that GSEP event is an General Emergency FG-1.
- 2. Locates/Review EP-AP-114-100 Locates blank copy of NARs form.
- 3. FILLS out NARS form.
- 4. REFERS to EP-AA-1 11, Attach.
5, "LaSalle PAR Determination Flowchart."
- 5. Task Completed.
(CUE) THIS COMPLETES THIS JPM Record Stop Time:
CUE: Start time for 15-minute reporting requirement CUE: Provide blank NARS form to candidate.
Fills out NARS form as follows:
- 1. Status: Exercise or Drill.
- 2. Station: LaSalle
- 3. Accident Classification: General Emergency.
- 4. Accident Classification Time: actual time.
- 5. Release to Env.: Occurring.
- 6. Type of Release: Gas.
NARS Form Block 9, Recommended Actions: Candidate Circles [B]. Enters "Sub Area 1 ".
Hands form to examiner.
Page 5 or (
Element
VERIFICATION OF COMPLETION Job Performance Measure No.
Examinee's Name:
Examiner's Name:
Date performed:
Number of attempts:
Time to complete:
Question Documentation:
Question:
Response
Result: SAT or UNSAT Examiner's signature and date:
Pagc 6 of 6
LASALLE COUNTY NUCLEAR STATION JOB PERFORMANCE MEASURE NARS Form Notific-ation Examination Leve': RO Date: April 8, 2002 Developed by: Raymond Keith Waltcu Reviewed by:
Date: March 14, 2002 Date:
Dart p
JOB PERFORMANCE MEASURE Facility: LaSalle Nuclear Station Task
Title:
NARS Form Notification Task No:
A.4 K/A
Reference:
2.4.43 Examinee:
NRC Examiner:
K/A Importance:
Date:
Time Finished:
Estimated Time to Completion:
Method of testing:
Performance:
X Simulated Actual Time Critical Task: YES, 15 minutes from time candidate given NARS form until candidate establishes NARS communications.
Location:
X Simulator Plant Task Standard:
Required Materials:
EP-AA-114, Notifications, Rev. 0 General
References:
EP-AA-114, Notifications, Rev. 0 READ TO THE EXAMINEE:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. Tell me when you have successfully complete the task.
Initial Conditions:
You are an extra NSO. A General Emergency has been declared on Unit 1.
Initiating Cue:
The Shift Manager has given you a completed NARS form and has directed you to make the necessary state and loc;l notifications per EP-AA-1 14, "Notifications," Attachment 2 for [ lnit 1. This is a time critical JPM.
Page 2 of 7 2.8/3.5 Time Started:
JOB PERFORMANCE MEASURE Simulator Setup instructions:
- 1. None Page 3 of 7
JOB PERFORMANCE MEASURE Initial Conditions:
You are an extra NSO. A General Emergency has been declared on Unit 1.
Initiating Cue:
The Shift Manager has given you a completed NARS form and has directe3 you to make the necessary state and local notifications per EP-AA-1 14, "Notifications," Attachment 2 for Unit 1.
This is a time critical JPM.
Page 4 of 7
JOB PERFORMANCE MEASURE (Denote critical steps with an asterisk)
CUE: Provide candidate copy of completed NARS form.
START time clock when candidate understands task.
Element
- 1. REFERs to EP-AA-114, Attach. 2
- 2. LOCATES NARS telephone
- 3. DIALS the appropriate CODE on the NARS telephone.
- 4. Repeats 3 times maximum:
"This is the Exelon Nuclear LaSalle Control Room. Please standby for a NARS message."
- 5. Reads the following message:
"This is the Exelon Nuclear LaSalle CR. Please standby to receive a NARS message for the LaSalle Station. Please respond as the roll is called."
Expected Response Identifies EP-AA-1 14, Attachment 2 as correct procedure and section.
Locates NARS telephone.
Dials code 25 on NARS phone.
Repeats message 3 times maximum.
Repeats message.
H-E I-co E
z 0
c)
D 0
In next step, when candidate conducts roll call, examiner will answer as the responding agency. Also, when candidate calls for Illinois DNS, and EOF, examiner will remain silent (IDNS not on line, EOF not yet staffed).
- 6. Conducts a roll call for following agencies: Illinois EMA, Grundy Co. Sheriff, LaSalle Co. Sheriff, LaSalle CR, Illinois DNS, Grundy Co. EMA, LaSalle Co. ESDA,
.ai~e TSC, EOF (if sta',., i).
- 7. Repeats roll call for IDNS Conducts roll call. (Illinois DNS fails to respond to roll call)
Candidate recognizes that IDNS does not respond...
Page 5 of 7 CUE:
JOB PERFORMANCE MEASURE (Denote critical steps with an asterisk)
Element
- 8.
Note any agencies that do not respond to roll call.
- 9.
READ the NARS message, Blocks 1-10 one at a time.
- 10.
COMPLETEs sections 11, 12, &
13 on the NARS form.
CUE:
In next step, when candidate conducts roll call, examiner will answer as the responding agency. When candidate calls for Illinois DNS, and EOF, examiner will remain silent (IDNS not on line, EOF not yet staffed).
- 11.
Repeat Roll call for the agencies listed on step 6.
- 12.
ASK if there are any questions.
"*13. CONTACTs IDNS using the ERF telephone directory to find the commercial telephone numbers needed.
- 14.
Provide completed NARS form to examiner for distribution.
CUE: This completes tLiJ
.PM.
Enter Stop Time: __-_
Expected Response Notes that IDNS did not respond to roll call Identifies that IDNS still not on line.
Asks if there are any questions.
Locates ERF telephone directory and contacts IDNS CUE: Examiner receive completed NARS form -
Page 6 of 7 4:t F-E F-Cl)
E z
0 0C D
C Reads blocks 1 - 10 one at a time.
Speaks slowly and clearly.
Enters name in section 11, enters current time and date in section 12.
CUE: Illinois EMA representative name-is Jim Miller. Enters Jim Miller in section 13.
VERIFICATION OF COMPLETION Job Performance Measure No.
Examinee's Name:
Examiner's Name:
Date performed:
Number of attempts:
Time to complete:
Question Documentation:
Question:
Response
Result: SAT or UNSAT Examiner's signature and date:
Page 7 of 7
EP-AA-1 14 Revision 0 Page 13 of 27 Reference Use ATTACHMENT 1 TABLE 1 Page 1 of 2 (UTILITY FORM)
UTILITY MESSAGE NO.
STATE OF ILLINOIS NUCLEAR ACCIDENT REPORTING January, 2001 STATE MESSAGE NO.
SYSTEM FORM
- 3.
ON-SITE ACCIDENT CLASSIFICATION
[A] UNUSUAL EVENT
([Us.GENERAL EMER
[B] ALERT "iff] RECOVERY
[C] SITE AREA EMERGENCY [F] NOT APPLICABLI
- 5. RELEASE TO ENVIRONMENT
- 6. TYPE OF REL (A],NONE NOT APP
[A] NN RADIOAC
[*BPOTENTIAL (FS1 or FG1)
[6RADIQAC CD)CCURRING
[C] RADIOAC
[D] TERMINATED LIQUID
- 1. S ATUS2.
STATION A
CTUAL
,DRESDEN EXERCISE BLASALLE
[C] DRILL
[C] QUAD CITIES
[D] TERMINATION
[D] ZION
- 4. ACCIDENT CLASSIFIED GENCY TIME:
DATE:
E EAL#:
.EASE
- 7. WIND DIRECTION:
LICABLE FROM TIVE GAS (DEGREES)
- TIVE DOWNWIND SECTOR:
[E] BYRON
[F] BRAIDWOOD
[G] CLINTON ACCIDENT TERMINATED TIME:
DATE.--
- 8. WIND SPEED
[A] METERS/SEC:
[B] MILES/HR.:
1it._
9.
RECOMMENDED ACTIONS
[A] NONE B*PREPARE (STATE USE ONLY)
SIMITI'IAT DI Dll I NIMtCTIr-I,'ATI-KI plRr'Ell ID R
INSTRI IUT THF PIURLIC TO TAKE THE FOLLOWING ACTIONS:
[N] RECOMMEND POTASSIUM IODIDE (KI) IN ACCORDANCE WITH PROCEDURES (STATE USE ONLY)
[0] CONFINE MILK-PRODUCING ANIMALS ON STORED FEED AND PROTECTED WATER OUT TO MILE RADIUS (STATE USE ONLY)
[P] COMMENCE RETURN OF PUBLIC (STATE USE ONLY)
[Q] OTHER
- 10. ADDITIONAL INFORMATION
- 11.
MESSAGE TRANSMITTED BY:
- 12.
MESSAGE TRANSMITTED:
CURRENT TIME:
(NAME)
(ORGANIZATION)
(OUTSIu-rtN CURRENT DATE: __
- 13. MESSAGE RECEIVED BY:
- 14. PERFORM FINAL (NAME)
ROLL CALL ON BACK OF FORM.
DIEMA QEXELON OUTSIDE PHONE ',;! i;,,RFRS IEMA 2 17-782-7860 IDNS 217-785-0600 IOWA EMD II; 15-281-3231 (Quad Only)
UTILITY USE ONLY
!.PPROVED BY:
EMERGENCYDIRETOR
'.:)
(TIME)
SHELTER EVACUATE UTILITY ONLY
[D]
0-2 MILERADIUS
'3 0)a
[E]
[j1 0-__ MILE RADIUS
[F]2-5 MILES FOR SECTORS T
[G]
5-10 MILES FOR SECTORS
[L] SHELTER SUB-AREAS:.....................
(STATE USE ONLY)
[M] EVACUATE SUB-AREAS:
(STATE USE ONLY)
PERFORM INITIAL ROLL CALL ON BACK OF NARS FORM:
INITIAL ROLL CALL COMPLETED TIME:
DATE:
,):.:
t !
.