ML022120017

From kanterella
Jump to navigation Jump to search
Industrial Security Plan (Revision 21/Change 1)
ML022120017
Person / Time
Site: Davis Besse 
Issue date: 07/09/2002
From: Bergendahl H
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
I-1279
Download: ML022120017 (1)


Text

FENOC FirstEnergy Nuclear Operating Company U.ia-tnorized dsclosl re may s; s; to civil and criminal sanctions.

Howard W. Bergendahl v'Ce Pr-cs~deý,- i %'oc/ear WHEN SEPARATED FROM ATTACHMENTS, HANDLE THIS DOCUMENT AS DECONTROLLED 419-321-8588 Fa.: 419-321-833 Docket Number 50-346 License Number NPF-3 Serial Number 1-1279 July 9, 2002 United States Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555-0001

Subject:

Industrial Security Plan (Revision 21/Change 1)

Ladies and Gentlemen:

In accordance with provisions of 10CFR50.54(p), the Davis-Besse Nuclear Power Station (DBNPS) hereby submits one original and three copies of the Industrial Security Plan.

Revision 2 1/Change I (Attachment 1). A report of the changes made to the document is included with each copy.

Attachment I contains Safeguards Information and pursuant to 10CFR 73.21 is to be withheld from public disclosure.

Should you have any questions or require additional information, please contact Mr. Patrick J. McCloskey, Manager - Regulatory Affairs, at (419) 321-8450.

Very truly' 'ours, AWB/s Attachments cc:

J. E. Dyer, Regional Administrator, NRC Region I1 (2 copies)

D. V. Pickett, DB-1 NRC/NRR Project Manager w/o C. S. Thomas, DB-1 NRC Senior Resident Inspector w/o Utility Radiological Safety Board w/o WHEN SEPARATED FROM ATTACHMENTS, HANDLE THIS DOCUMENT AS DECONTROLLED I t

"'. i ol. "-*.=

~\\fii/

Cav's-_RLSStO %'`IcOeagr Po.,P*e S~,',

,591J Norf-Stateo RoLte 2