ML022000183

From kanterella
Jump to navigation Jump to search
June 2002 Monthly Operating Report for Wolf Creek Generating Station
ML022000183
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 07/10/2002
From: Jacobs D
Wolf Creek
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, WO 02-0038
Download: ML022000183 (3)


Text

W0LF CREEK NUCLEAR OPERATING CORPORATION Donna Jacobs Plant Manager JUL 1 0 2002 WO 02-0038 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

Subject:

Docket No. 50-482: June, 2002, Monthly Operating Report Gentlemen:

Attached to this letter is the June, 2002, Monthly Operating Report for the Wolf Creek Generating Station. This submittal is being made in accordance with the requirements of Wolf Creek Generating Station Technical Specification 5.6.4, "Monthly Operating Reports." This submittal also follows the guidance of Generic Letter 97-02, "Revised Contents of the Monthly Operating Report." If you have questions regarding this report, please contact me at (620) 364-4246, or Mr. Tony Harris at (620) 364-4038.

Very truly yours, DJ/rlr Attachment cc:

J. N. Donohew (NRC), w/a D. N. Graves (NRC), w/a E. W. Merschoff (NRC), w/a Senior Resident Inspector (NRC), w/a P.O. Box 411 / Burlington, KS 66839 / Phone: (620) 364-8831 An Equal Opportunity Employer M/F/HC/VET

Attachment to WO 02-0038 Page 1 of 2 OPERATING DATA REPORT Report Number: 208 DOCKET NO.:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-482 Wolf Creek Generating Station July 3, 2002 J. L. Yunk (620) 364-4272 REPORT MONTH: June, 2002

1.

Design Electrical Rating (MWe - Net):

I 1170

2.

Maximum Dependable Capacity (MWe - Net):

1170 This Month Year to Date Cumulative

3.

Number of Hours Reactor Critical:

720.0 3,354.1 125,718.8

4.

Number of Hours Generator On-Line:

720.0 3,278.6 124,528.8

5.

Unit Reserve Shutdown Hours:

0.0 0.0 339.8

6.

Net Electrical Energy Generated (MWH) 849,793 3,811,498 140,848,500 Wolf Creek Generating Station Monthly Operating Report June, 2002 Page 1 of 2

Attachment to WO 02-0038 Page 2 of 2 UNIT SHUTDOWN AND POWER REDUCTIONS DOCKET NO.:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-482 Wolf Creek Generating Station July 3, 2002 J. L. Yunk (620) 364-4272 The unit operated in Mode 1,100% power, from June 1, 2002, through June 30, 2002.

A: EQUIPMENT FAILURE (EXPLAIN)

B: MAINTENANCE OR TEST C: REFUELING D: REGULATORY RESTRICTION E: OPERATOR TRAINING AND LICENSE EXAMINATION F: ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN)

H: OTHER (EXPLAIN)

(2) METHOD: 1. MANUAL

2. MANUAL SCRAM
3. AUTOMATIC SCRAM
4. CONTINUATION
5. OTHER Wolf Creek Generating Station Monthly Operating Report June, 2002 Page 2 of 2

SUMMARY

Type METHOD OF SHUTTING F: FORCED DURATION REASON DOWN THE REACTOR CORRECTIVE ACTIONS/COMMENTS No.

Date

&: SCHEDULED (Hours)

(1)

(2)

(1) REASON: