ML022000071

From kanterella
Jump to navigation Jump to search
Physical Security Plan, Revision 17 and Plant Security Personnel Training and Qualification Plan, Revision 7
ML022000071
Person / Time
Site: Limerick  
Issue date: 07/02/2002
From: Gallagher M
Exelon Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML022000071 (2)


Text

SIExelon,.

Exelon Nuclear www.exeloncorp.com Nuclear 2oo Exelon Way Kennett Square, PA 19348 10 CFR 50.54(p)(2) 10 CFR 50.4(b)(4)

July 2, 2002 United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353

Subject:

Limerick Generating Station Physical Security Plan, Revision 17 and Plant Security Personnel Training and Qualification Plan, Revision 7 In accordance with 10 CFR 50.54(p)(2), "Conditions of licenses," we are submitting changes to the Exelon Generation Company, LLC, Limerick Generating Station Physical Security Plan and Plant Security Personnel Training and Qualification Plan. In accordance with 10 CFR 50.4(b)(4),

"Security plan and related submittals," attached are the original and three (3) copies of revision 17 to the Station Physical Security Plan and revision 7 to the Plant Security Personnel Training and Qualification Plan.

Revision 17 to the Station Physical Security Plan includes the following change.

The Security Plan has been revised to allow the use of alternate, NRC approved, methods for obtaining information pertaining to military records.

Revision 7 to the Plant Security Personnel Training and Qualification Plan includes the following change.

The removal of specific language regarding employment suitability and background investigations. This change was necessary to eliminate any and all conflicts with revision 17 of the Station Physical Security Plan. Because Section 1.6. of the Station Physical Security Plan already establishes the requirements for employment suitability and background investigations, a reference was added to the Plant Security Personnel Training and Qualification Plan.

As required by 10 CFR 50.54(p)(2), we have concluded that these changes do not decrease the safeguards effectiveness of the Limerick Generating Station Physical Security Plan or the Plant Security Personnel Training and Qualification Plan.

ATTACHMENTS 3 AND 4 CONTAIN SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED N

LGS Physical Security Plan, Revision 17 and Plant Security Personnel Training and Qualification Plan, Revision 7.

July 3, 2002 Page 2 The changes to the Limerick Generating Station Physical Security Plan and the Plant Security Personnel Training and Qualification Plan were implemented on May 21, 2002. In accordance with 10 CFR 50.54(p)(2), these changes shall be reported within 60 days of implementation i.e.,

July 20, 2002.

Attachments 3 and 4 contain Safeguards Information that must be protected from public disclosure as required by 10 CFR 73.21, " Requirements for the protection of safeguards information."

Should you have any questions concerning this letter, please contact Mr. Dave Helker at (610) 765-5525.

Respectfully, Michael P. Gallagher Director, Licensing & Regulatory Affairs Mid-Atlantic Regional Operating Group Attachments: Change Matrix for Limerick Generating Station Physical Security Plan, Revision 17. Change Matrix for Limerick Generating Station Plant Security Personnel Training and Qualification Plan, Revision 7. Limerick Station Physical Security Plan, Revision 17, (contains safeguards information). Limerick Generating Station Plant Security Personnel Training and Qualification Plan, Revision 7, (contains safeguards information).

cc:

H. J. Miller, Administrator, Region I, USNRC (2 copies)

A. L. Burritt, USNRC Senior Resident Inspector, LGS (Attach. 1&2 Only)

ATTACHMENTS 3 AND 4 CONTAIN SAFEGUARDS INFORMATION UPON SEPARATION, THIS PAGE IS DECONTROLLED