June 2002 Monthly Operating Report for Indian Point 3
ML022000056
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 07/09/2002
From: Barrett R
Entergy Nuclear Northeast, Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
IPN-02-057
Download: ML022000056 (6)


Text

a -'Entergy--

Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.

Indian Point Energy Center P.O. Box 308 Buchanan, NY 10511 Tel 9147368001 Fax 914 736 8012 Robert J. Barrett Vice President, Operations Indian Point 3 July 9, 2002 IPN-02-057 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop O-Pl-17 Washington, D.C. 20555-0001

Subject:

Indian Point 3 Nuclear Power Plant Docket No. 50-286 License No. DPR-64 Monthly Operating Report for June 2002

Dear Sir:

The attached monthly operating report, for the month of June 2002, is hereby submitted in accordance with Indian Point 3 Nuclear Power Plant Technical Specification 5.6.4.

Indian Point 3 is making no commitments in this letter.

Very truly yours, Rober J6:arr Vice President, Operations Indian Point 3 Nuclear Power Plant cc: See next page

ý ý- -c-

-:), 4

Docket No. 50-286 IPN-02-057 Page 2 of 2 Attachment cc:

Mr. Hubert J. Miller Regional Administrator Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406-1415 Resident Inspector's Office U.S. Nuclear Regulatory Commission Indian Point 3 Nuclear Power Plant P.O. Box 337 Buchanan, NY 10511-0337 U.S. Nuclear Regulatory Commission ATTN: Director, Office of Information Resource Management Washington, D.C. 20555 INPO Records Center 700 Galleria Parkway Atlanta, Georgia 30339-5957

OPERATING DATA REPORT DOCKET NO.

UNIT:

DATE:

COMPLETED BY:

TELEPHONE NO:

LETTER NO:

50-286 Indian Point 3 7-02-02 T. Orlando (914) 736-8340 IPN-02-057 ATTACHMENT PAGE 1 of 4 OPERATING STATUS Unit Name:

Indian Point No. 3 Nuclear Power Plant Reporting Period:

June 2002 Licensed Thermal Power (MWt):

3025 Nameplate Rating (Gross MWe):

1013 Design Electrical Rating (Net MWe):

965 Maximum Dependable Capacity (Gross MWe):

1000 Maximum Dependable Capacity (Net MWe):

965 If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report Give Reasons:

9.

Power Level to Which Restricted, If Any (Net MWe):

10.

Reasons for Restrictions, If Any:

Hours In Reporting Period Number Of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Gross Electrical Energy Generated (MWH)

Net Electrical Energy Generated (MWH)

Unit Service Factor Unit Availability Factor Unit Capacity factor (Using MDC Net)

Unit Capacity Factor (Using DER Net)

Unit Forced Outage Rate This Month 720 720 0

720 0

2,175,818 734,271 709,299 100 100 102.1 102.1 0

Yr-to-Date 4,343 4,343 0

4,343 0

13,132,576 4,431,638 4,293,480 100 100 102.5 102.5 0

Cumulative 226,864 141,950.73 0

139,140 0

399,963,516 128,315,101 123,897,705 61.3 61.3 57.3*

56.6 23.4

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

25.

If Shut Down At End Of Report Period. Estimated Date of Startup:

26.

Units In Test Status (Prior to Commercial Operation):

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Weighted Average Forecast

1.
2.
3.
4.
5.
6.
7.

8.

11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.

23.

Achieved

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

UNIT:

DATE:

COMPLETED BY:

TELEPHONE NO:

LETTER NO:

50-286 Indian Point 3 7-02-02 T. Orlando (914) 736-8340 IPN-02-057 ATTACHMENT PAGE 2 of 4 MONTH June 2001 AVERAGE DAILY POWER 988 988 988 988 988 988 987 988 987 987 986 987 986 971 986 987 DAY 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 AVERAGE DAILY POWER LEVEL (MWe-Net) 985 985 985 985 986 985 985 984 984 981 982 982 983 982 INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

DAY 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16

DOCKET NO.

UNIT:

DATE:

COMPLETED BY:

TELEPHONE NO.

LETTER NO:

50-286 Indian Point 3 7-02-02 T. Orlando (914) 736-8340 IPN-02-057 ATTACHMENT PAGE 3 of 4 UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH June 2002 1

F: Forced S: Scheduled 2

3 Reason:

Method:

A-Equipment 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Other (Explain)

E-Operator Training & Licensee Examination F-Administrative G-Operational Error H-Other (Explain) 4 Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG - 0161) 5 Exhibit 1 Same Source METHOD OF NO.

DATE TYPE DURATION REASON SHUTTING LICENSEE EVENT SYSTEM COMPONENT CAUSE & CORRECTIVE ACTION TO 1

(HOURS) 2 DOWN REPORT #

CODE CODE PREVENT RECURRENCE REACTOR 3 4

5 None

DOCKET NO.

UNIT:

DATE:

COMPLETED BY:

TELEPHONE NO.:

LETTER NO.

50-286 Indian Point 3 7-02-02 T. Orlando (914) 736-8340 IPN-02-057 ATTACHMENT PAGE 4 of 4

SUMMARY

OF OPERATING EXPERIENCE June 2002 The Indian Point Unit No. 3 Nuclear Power Plant was synchronized to the bus for a total of 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br />, producing a gross electrical energy generation of 734,271 MWH.

On June 14, at 1703 hours0.0197 days <br />0.473 hours <br />0.00282 weeks <br />6.479915e-4 months <br />, a scheduled load reduction commenced in order to support the performance of surveillance test 3PT-Q107, "Main Turbine Stop and Control Valve Exercise and Vibration Monitoring." Unit load was stabilized at 91% reactor power at 1914 hours0.0222 days <br />0.532 hours <br />0.00316 weeks <br />7.28277e-4 months <br />. Following successful completion of the test, a load escalation commenced at 2110 hours0.0244 days <br />0.586 hours <br />0.00349 weeks <br />8.02855e-4 months <br />. The unit acheived full load at 2300 hours0.0266 days <br />0.639 hours <br />0.0038 weeks <br />8.7515e-4 months <br /> and remained on line at full power for the remainder of the reporting period.