ML021990257

From kanterella
Jump to navigation Jump to search
Response to RIS 2002-09 Dtd 7/11/02
ML021990257
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 07/11/2002
From: Hunt W
Susquehanna
To: Conte R
NRC/RGN-I/DRS/OSB
References
PLA 005502, RIS-02-009
Download: ML021990257 (2)


Text

I-ECEIVED I' '

REGION 1

?[P_? JUL 12 PM 3:33 N* TM July 11, 2002 Mr. Rich Conte Branch Chief Operation Safety Branch USNRC Region 1 475 Allendale Road King of Prussia, PA 19406-1415 Susquehanna Learning Center Response to RIS 2002-09 Preparation and Scheduling of Operator Licensing Examinations PLA 005502 A14-13D

Dear Mr. Conte:

Attached please find the updated NRC Form 536 for Susquehanna Steam Electric Station. This information represents the current plan for licensing needs at the Station.

The Station will work with the Region to help levelize Examiner workload. Please contact Jeff Helsel at 570-542-3510 with any questions.

Thank you.

/W.W. uý Manager - Nuclear Training Response: No Enclosures cc: R. L. Anderson G. W. Boughman J. M. Helsel R. M. Peal G. F. Ruppert J. M. Seek J. L. Tripoli Ops Letter File Nuc Records - Site WWH/vah wwhnrcRISletter07-11-02

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 07/31/2002 (8-2000) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden OPERATOR LICENSING estimate to the Records Management Branch (T-6 E6), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to bjsl@nrc.gov, and to the De Officer, Office of Information and Regulatory EXAMINATION DATA Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION PPL Susquehanna, LLC Region 1 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 03 CY04 CY 05 CY.06 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS 1 RO, 1 SRO 1 RO, 1 SRO 1 RO, 1 SRO 1 RO, 1 SRO ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS 0 0 0 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY3 CY_._ CY.0 CY-0 NUMBER OF REACTOR OPERATORS 4 8 8 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 4 2 2 2 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 2 2 2 2 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 PROPOSED DATES PRIMARY DATE 08/11/03 08/09/04 08/08/05 10/30/06 ALTERNATE DATE 08/25/03 08/20/04 08/22/05 11/13/06 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 03 CY 04 PROPOSED NUMBER FIRST SECOND THIRD FIRST SECOND THIRD ESTIMATED NUMBER OF CANDIDATES NR8F 5 0 10 PRINTED ON RECYCLED PAPER This form was designed using InForms NRC FORM 536 (8-2000)