MONTHYEARML24025A9362024-01-31031 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0055 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000263/20230042024-01-31031 January 2024 Integrated Inspection Report 05000263/2023004 ML24024A0722024-01-24024 January 2024 Independent Spent Fuel Storage Installation, Onticello, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000263/20244012024-01-22022 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000263/2024401 L-MT-23-054, Subsequent License Renewal Application Supplement 82024-01-11011 January 2024 Subsequent License Renewal Application Supplement 8 L-MT-23-047, License Amendment Request: Revision to the MNGP Pressure Temperature Limits Report to Change the Neutron Fluence Methodology and Incorporate New Surveillance Capsule Data2023-12-29029 December 2023 License Amendment Request: Revision to the MNGP Pressure Temperature Limits Report to Change the Neutron Fluence Methodology and Incorporate New Surveillance Capsule Data L-MT-23-056, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 Part 22023-12-18018 December 2023 Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 Part 2 ML23349A0572023-12-15015 December 2023 and Independent Spent Fuel Storage Installation, Revision to Correspondence Service List for Northern States Power - Minnesota IR 05000263/20234022023-12-13013 December 2023 Security Baseline Inspection Report 05000263/2023402 L-MT-23-042, 2023 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.462023-12-11011 December 2023 2023 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 L-MT-23-052, Subsequent License Renewal Application Supplement 72023-11-30030 November 2023 Subsequent License Renewal Application Supplement 7 L-MT-23-051, Update to the Technical Specification Bases2023-11-28028 November 2023 Update to the Technical Specification Bases L-MT-23-049, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 12023-11-21021 November 2023 Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 ML23319A3182023-11-15015 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000263/20230032023-11-13013 November 2023 Integrated Inspection Report 05000263/2023003 and 07200058/2023001 L-MT-23-043, 10 CFR 50.55a(z)(1) Request Regarding OMN-17, Revision 1. VR-092023-11-13013 November 2023 10 CFR 50.55a(z)(1) Request Regarding OMN-17, Revision 1. VR-09 L-MT-23-038, License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.62023-11-10010 November 2023 License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 L-MT-23-046, Subsequent License Renewal Application Response to Request for Additional Information Round 2 - Set 12023-11-0909 November 2023 Subsequent License Renewal Application Response to Request for Additional Information Round 2 - Set 1 ML23291A1102023-10-23023 October 2023 Environmental Audit Summary and RCIs and RAIs ML23285A3062023-10-12012 October 2023 Implementation of the Fleet Standard Emergency Plan for the Monticello Nuclear Generating Plant and the Prairie Island Nuclear Generating Plant L-MT-23-041, Subsequent License Renewal Application Response to Request for Confirmation of Information Set 22023-10-0303 October 2023 Subsequent License Renewal Application Response to Request for Confirmation of Information Set 2 L-MT-23-037, Subsequent License Renewal Application Response to Request for Additional Information Set 32023-09-22022 September 2023 Subsequent License Renewal Application Response to Request for Additional Information Set 3 ML23262B0372023-09-19019 September 2023 Response to NRC Request for Additional Information Regarding the 2023 Monticello and Prairie Island Plant Decommissioning Funding Status Reports ML23248A2092023-09-18018 September 2023 Proposed Alternative VR-11 to the Requirements of the ASME OM Code Associated with Periodic Verification Testing of MO-2397, Reactor Water Cleanup Inboard Isolation Valve ML23256A1682023-09-13013 September 2023 Independent Spent Fuel Storage Installation and Monticello Nuclear Generating Plant - Voluntary Security Clearance Program 2023 Insider Threat Program Self-Inspection IR 05000263/20230102023-09-0707 September 2023 Commercial Grade Dedication Inspection Report 05000263/2023010 L-MT-23-036, Subsequent License Renewal Application Response to Request for Additional Information Set 2 and Supplement 62023-09-0505 September 2023 Subsequent License Renewal Application Response to Request for Additional Information Set 2 and Supplement 6 ML23214A2412023-08-31031 August 2023 Letter: Aging Management Audit - Monticello Unit 1 - Subsequent License Renewal Application IR 05000263/20230052023-08-30030 August 2023 Updated Inspection Plan for Monticello Nuclear Generating Plant (Report 05000263/2023005) L-MT-23-035, Subsequent License Renewal Application Supplement 52023-08-28028 August 2023 Subsequent License Renewal Application Supplement 5 ML23241A9732023-08-21021 August 2023 Request for Scoping Comments Concerning the Environmental Review of Monticello Nuclear Generating Plant, Unit 1, Subsequent License Renewal Application (Docket No. 50-263) L-MT-23-034, Subsequent License Renewal Application Response to Request for Additional Information Set 12023-08-15015 August 2023 Subsequent License Renewal Application Response to Request for Additional Information Set 1 ML23222A0122023-08-10010 August 2023 Independent Spent Fuel Storage Installation and Monticello Nuclear Generating Plant - Changes in Foreign Ownership, Control or Influence ML23215A1312023-08-0909 August 2023 License Renewal Regulatory Audit Regarding the Environmental Review of the Subsequent License Renewal Application IR 05000263/20230022023-08-0707 August 2023 Plantintegrated Inspection Report 05000263/2023002 L-MT-23-028, 2023 Refueling Outage 90-Day Inservice Inspection (ISI) Summary Report2023-07-31031 July 2023 2023 Refueling Outage 90-Day Inservice Inspection (ISI) Summary Report L-MT-23-032, 10 CFR 50.55a(z)(2) Request Regarding MO-2397, VR-112023-07-31031 July 2023 10 CFR 50.55a(z)(2) Request Regarding MO-2397, VR-11 ML23198A0412023-07-28028 July 2023 LRA Availability Letter ML23206A2342023-07-25025 July 2023 Independent Spent Fuel Storage Installation, and Monticello Nuclear Generating Plant, Changes in Foreign Ownership, Control or Influence ML23201A0352023-07-24024 July 2023 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML23202A0032023-07-21021 July 2023 Independent Spent Fuel and Independent Spent Fuel Storage Installation, Monticello Nuclear Generating Plant, Submittal of Quality Assurance Topical Report (NSPM-1) L-MT-23-031, Subsequent License Renewal Application Supplement 4 and Responses to Request for Confirmation of Information - Set 12023-07-18018 July 2023 Subsequent License Renewal Application Supplement 4 and Responses to Request for Confirmation of Information - Set 1 ML23195A1732023-07-14014 July 2023 Revision of Standard Practice Procedures Plan IR 05000263/20235012023-07-13013 July 2023 Emergency Preparedness Inspection Report 05000263/2023501 2024-01-31
[Table view] Category:License-Operator Examination Report
MONTHYEARIR 05000263/20183012018-12-27027 December 2018 NRC Initial License Examination Report 05000263/2018301 IR 05000263/20153012015-07-15015 July 2015 Er 05000263/2015301; 06/02/2015 - 06/19/2015; Northern States Power Company, Minnesota, Monticello Nuclear Generating Plant; Initial License Examination Report IR 05000263/20133012013-03-0101 March 2013 Er 05000263-13-301(DRS); 01/29/2013 - 02/12/2013; Monticello Nuclear Generating Plant, Initial License Examination Report IR 05000263/20103012011-01-28028 January 2011 Er 05000263-10-301(DRS), on 12/06/2010 - 12/22/2010, Monticello Nuclear Generating Plant, Northern States Power Company, Minnesota, Initial License Examination Report IR 05000263/20093012009-04-24024 April 2009 Er 05000263-09-301 (DRS) on 02/23/09 - 02/27/09 and 03/02/09 -03/05/09 for Monticello IR 05000263/20073022007-10-31031 October 2007 Er 05000263-07-302(DRS); 10/03/2007, Monticello Nuclear Generating Plant, NRC Initial License Examination Report IR 05000263/20053012005-06-16016 June 2005 Er 05000263-05-301(DRS); 05/03/2005 - 05/12/2005; Monticello Nuclear Generating Plant; Initial License Examination Report ML0219804802002-07-0909 July 2002 Response to NRC Regulatory Issue Summary 2002-09 Preparation and Scheduling of Operator Licensing Examinations 2018-12-27
[Table view] |
Text
lonticello Nuclear Generating Plant Nuclr E Committed to Nuclear Excellence~ ated by Nuclear Management Company, LLC July 9, 2002 10 CFR Part 55 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 MONTICELLO NUCLEAR GENERATING PLANT Docket No. DPR-22 License No. 50-263 Response to NRC Regulatory Issue Summary 2002-09 Preparation and Scheduling of Operator Licensing Examinations Nuclear Management Company, LLC (NMC) is hereby providing a response to NRC Regulatory Issue Summary (RIS) 2002-09, "Preparation and Scheduling of Operator Licensing Examination," for the Monticello Nuclear Generating Plant.
The completed NRC Form 536 is attached and provides NMC's voluntary response to the NRC RIS 2002-09. This response provides the NRC with Monticello's currently proposed schedules of examinations that are intended to be prepared and the current estimate of the number of applicants to be tested in both, the site examinations and the Generic Fundamentals Examinations in calendar years 2003 through 2006.
If you have any questions regarding this submittal please contact Bill Cheever, General Supervisor Operations Training at (763) 271-2629, or Doug Neve, Licensing Manager at (763) 295-1353.
Jeffrey S. Forbes Site Vice President Monticello Nuclear Generating Plant
Attachment:
NRC Form 536 - Operator Licensing Examination Data cc: Regional Administrator - III, NRC NRR Project Manager, NRC Sr. Resident Inspector, NRC 0 22 2807 West County Road 75
- Monticello, Minnesota 55362-9637 Telephone: 763.295.5151
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 (8-2000) EXPIRES: 07/3112002 Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send6 comments re arding burden OPERATOR LICENSING estimate to the Records Management Branch (T- E6), U.S.
Commission, Washington, DC 20 ear Regulatory 01, or by internet e-mail to EXAMINATION DATA bjsl@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Bud et Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION MONTICELLO NUCLEAR GENERATING PLANT III 50-263 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER Cy -03 CY-Q4 CY-05 CY-06 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 EXAMINATIONS 0 0 L 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY -03 CY-04 CY-0 CY_0L 5
NUMBER OF REACTOR OPERATORS 7 6 6 6 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 5 2 2 2 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 0 1 2 2 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE SEPT. 15-19, NOV. 01-05, NOV. 07-11, NOV. 06-10, 2003 2004 2005 2006 ALTERNATE DATE N/A NOV. 20 08-12, NOV. 0520 14-18, NOV. 13-17, 2004 2005 2006 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY -03 CY -04 PROPOSED NUMBER FIRST SECOND THIRD FIRST SECOND THIRD ESTIMATED NUMBER OF 0 6 0 0 6 0 CANDIDATES NRC FORM 536 (8-2000) PRINTED ON RECYCLED PAPER Thlis form was designed using InForims