ML021980045
| ML021980045 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 07/10/2002 |
| From: | Mahon T FirstEnergy Nuclear Operating Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| PY-CEI/NRR-2650L | |
| Download: ML021980045 (1) | |
Text
FENOC FirstEnergy Nuclear Operating Company SAFEGUARDS INFORMATION Perry Nuclear Power Plant 10 Center Road PO. Box 97 Perry, Ohio 44081 July 10, 2002 PY-CEI/NRR-2650L United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Perry Nuclear Power Plant Docket No. 50-440 Security Plan Changes Ladies and Gentlemen:
Attached please find four (4) copies each of Revisions 31 and 32 to the Perry Nuclear Power Plant (PNPP) Security Plan. Changes in these revisions were made in accordance with 10 CFR 50.54(p)(2). The changes have been determined not to decrease the effectiveness of the Security Plan.
If you have questions or require additional information, please contact Mr. Gregory A. Dunn, Manager - Regulatory Affairs, at (440) 280-5305.
Very truly yours, Thomas E. Mahon Manager, Site Protection Section Attachments cc: NRC Project Manager (w/o attachment)
NRC Resident Inspector (w/o attachment)
NRC Region III (with 2 copies of each attachment)
<+39 SAFEGUARDS 1tFfi MAT-Attachments to be withheld from Public Disclosure, they contain 10 CFR 73.21 material. When transmittal letter is separated from Attachments, handle transmittal letter as decontrolled.