Southern Nuclear Operating Company, Inc.
Post Office Box 1295 Birmingham, Alabama 35201 Tel 205.992.5131 July 12, 2002 Docket Nos.:
50-348 50-364 SOUTHERN COMPANY Energy to Serve Your World S" NEL-02-0153 U. S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant Monthly Operating Report Ladies and Gentlemen:
Enclosed are the June 2002 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 5.6.4 of the Technical Specifications.
If you have any questions, please advise.
Respectfully submitted, Dave Morey RWC:mor
Enclosures:
- 1. June Monthly Operating Report for Plant Farley Unit 1
- 2. June Monthly Operating Report for Plant Farley Unit 2 Dave Morey Vice President Farley Project
Page 2 U. S. Nuclear Regulatory Commission cc:
Southern Nuclear Operating Company Mr. D. E. Grissette, General Manager U. S. Nuclear Regulatory Commission, Washington, D. C.
Mr. F. Rinaldi, Licensing Project Manager - Farley U. S. Nuclear Regulatory Commission, Region II Mr. L. A. Reyes, Regional Administrator Mr. T. P. Johnson, Senior Resident Inspector - Farley
OPERATING DATA REPORT DOCKET NO.:
50-348 UNIT NAME:
J. M. Farley - Unit 1 DATE:
July 8, 2002 COMPLETED BY:
W. L. Marlar TELEPHONE:
(334) 814-4554 OPERATING STATUS Reporting Period:
Design Electrical Rating (Net MWe):
Maximum Dependable Capacity (Net MWe):
JUNE 2002 854 833 This Month Year to Date Cumulative Number Of Hours Reactor Was Critical:
Hours Generator On-line:
Unit Reserve Shutdown Hours:
Net Electrical Energy Generated (MWH):
720.0 720.0 0.0 596,719.0 4,312.1 176,558.0 4,296.0 174,264.2 0.0 0.0 3,605,947.0 137,958,893.0 CHALLENGES TO PRESSURIZER PORV OR PRESSURIZER SAFETY VALVES Date Tag No.
Event Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.
El-1
- 1.
- 2.
3.
- 4.
- 5.
- 6.
7.
UNIT SHUTDOWNS REPORTING PERIOD:
DOCKET NO.:
50-348 UNIT NAME: J. M. Farley - Unit 1 DATE:
July 8, 2002 COMPLETED BY:
W. L. Marlar JUNE 2002 TELEPHONE:
(334) 814-4554 Type Method of F: Forced Duration Reason Shutting Down Cause/Corrective Actions No.
Date S: Scheduled (Hours)
(1)
(2)
Comments There were no unit shutdowns during the month.
(1) REASON:
(2) METHOD:
A - Equipment Failure (Explain)
I - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)
F - Administrative G - Operational Error (Explain)
H - Other (Explain)
CAUSE/CORRECTIVE ACTION/COMMENTS NARRATIVE REPORT There were no significant power reductions this period.
E1-2
OPERATING DATA REPORT DOCKET NO.:
50-364 UNIT NAME:
J. M. Farley - Unit 2 DATE:
July 8, 2002 COMPLETED BY:
W. L. Marlar TELEPHONE:
(334) 814-4554 OPERATING STATUS
- 1. Reporting Period:
JUNE 2002
- 2.
Design Electrical Rating (Net MWe):
855
- 3. Maximum Dependable Capacity (Net MWe):
842 This Month Year to Date Cumulative Number Of Hours Reactor Was Critical:
Hours Generator On-line:
Unit Reserve Shutdown Hours:
Net Electrical Energy Generated (MWH):
720.0 720.0 0.0 602,354.0 4,343.0 159,828.6 4,343.0 157,888.8 0.0 0.0 3,692,229.0 126,274,308.0 CHALLENGES TO PRESSURIZER PORV OR PRESSURIZER SAFETY VALVES Date Tag No.
Event Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.
E2-1
- 4.
- 5.
- 6.
7.
UNIT SHUTDOWNS REPORTING PERIOD:
DOCKET NO.:
50-364 UNIT NAME: J. M. Farley - Unit 2 DATE:
July 8, 2002 COMPLETED BY:
W. L. Marlar JUNE 2002 TELEPHONE:
(334) 814-4554 (1) REASON:
(2) METHOD:
A - Equipment Failure (Explain)
I - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)
F - Administrative G - Operational Error (Explain)
H - Other (Explain)
CAUSE/CORRECTIVE ACTION/COMMENTS NARRATIVE REPORT There were no significant power reductions this period.
E2-2 Type Method of F: Forced Duration Reason Shutting Down Cause/Corrective Actions No.
Date S: Scheduled (Hours)
(1)
(2)
Comments There were no unit shutdowns during the month.