MONTHYEARML24038A0322024-02-0707 February 2024 (Vcsns), Unit 1, 10 CFR 21 Report - Emergency Diesel Generator Flash Contactor Relay IR 05000395/20230042024-01-31031 January 2024 Integrated Inspection Report 05000395/2023004 ML24022A1582024-01-22022 January 2024 (Vcsns), Unit 1 - Reply to a Notice of Violation: EA-23-093 ML24022A1202024-01-22022 January 2024 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000395/2024403) ML24018A0112024-01-18018 January 2024 CFR 21 Report Emergency Diesel Generator Fuel Oil Piping IR 05000395/20240112024-01-17017 January 2024 Notification of VC Summer Station Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000395/2024011 ML23361A1042023-12-21021 December 2023 Inservice Testing Program for Pumps and Valves Fifth Interval Update and Associated Relief and Alternative Requests IR 05000395/20230912023-12-21021 December 2023 Final Significance Determination of a White Finding and Notice of Violation and Assessment Followup Letternrc Inspection Report 05000395/2023091 ML23354A1802023-12-20020 December 2023 301 Examination Report with Cover Letter ML23347A0492023-12-12012 December 2023 Technical Specification Bases Changes Updated Through November 2023 ML23334A2462023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23334A2372023-11-30030 November 2023 (Vvsns), Unit 1 - Annual Commitment Change Summary Report ML23332A1942023-11-28028 November 2023 (Vcsns), Unit 1, Correction of Typographical Error in License Amendment Request - Inverter Allowed Outage Time (AOT) Extension ML23317A2242023-11-0909 November 2023 (Vcsns), Unit 1 - License Amendment Request - Inverter Allowed Outage Time (AOT) Extension ML23289A1172023-11-0303 November 2023 Tribal Request for Scoping Comments Concerning the Environmental Review of the V.C. Summer SLRA ML23289A1152023-11-0303 November 2023 Ltr to R. Nelson - Request for Scoping Comments Concerning the Environmental Review of the V.C. Summer SLRA ML23289A1162023-11-0303 November 2023 Ltr to W. Emerson - Request for Scoping Comments Concerning the Environmental Review of the V.C. Summer SLRA IR 05000395/20234032023-11-0101 November 2023 Material Control and Accounting Program Inspection Report 05000395/2023403 Cover IR 05000395/20230032023-11-0101 November 2023 Integrated Inspection Report 05000395/2023003 ML23284A1792023-10-16016 October 2023 Subsequent License Renewal Application Online Reference Portal ML23275A0142023-10-11011 October 2023 SLRA - Acceptance and Opportunity for Hearing - Letter ML23284A1662023-10-10010 October 2023 (Vcsns), Unit 1 - Request for Regulatory Conference; (EA-23-093) IR 05000395/20230902023-10-0404 October 2023 NRC Inspection Report 05000395/2023090 and Preliminary Yellow Finding and Apparent Violation IR 05000395/20230112023-09-27027 September 2023 Focused Engineering Inspection Report 05000395/2023011 ML23250A3112023-09-20020 September 2023 Request to Revise Reactor Vessel Material Surveillance Capsule Withdrawal Schedules ML23244A2352023-09-18018 September 2023 Request to Use a Subsequent Edition of the ASME Code, Section XI ML23230A0012023-09-15015 September 2023 Request to Use a Provision of a Previous Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for Non-Destructive Examinations ML23235A0432023-09-0505 September 2023 Receipt and Availability of the Subsequent License Renewal Application IR 05000395/20234012023-08-30030 August 2023 Security Baseline Inspection Report 05000395/2023401 ML23242A1192023-08-29029 August 2023 (Vcsns), Unit 1 - Inservice Inspection (ISI) Owner'S Activity Report (OAR) for Refueling Outage 27 ML23243B0362023-08-25025 August 2023 Request for FEMA Consultation on the Dominion Energy Proposal to Consolidate the Emergency Operations Facility for the Virgil C. Summer Nuclear Station Unit 1 IR 05000395/20230052023-08-23023 August 2023 Updated Inspection Plan for Virgil C. Summer Nuclear Station (Report 05000395 2023005) ML23233A1752023-08-17017 August 2023 Application for Subsequent Renewed Operating License IR 05000395/20230022023-08-14014 August 2023 Integrated Inspection Report - Integrated Inspection Report 05000395/2023002 and Apparent Violation IR 05000395/20230102023-08-12012 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000395/2023010 ML23207A1102023-07-26026 July 2023 NRC Regulatory Issues Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations IR 05000395/20234412023-07-17017 July 2023 95001 Supplemental Inspection Report 05000395/2023441 and Follow Up Assessment Letter ML23190A0012023-07-0909 July 2023 Special Report 2023-003 Inoperable Radiation Monitoring Instrumentation Channel ML23187A5092023-07-0606 July 2023 Request for Federal Emergency Management Agency Consultation on the Dominion Energy Proposal to Consolidate the Emergency Operations Facility for the Virgil C. Summer Nuclear Station Unit 1 ML23178A1682023-06-26026 June 2023 2022 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML23173A1052023-06-22022 June 2023 Special Report 2023-002 Inoperable Loose-Part Monitoring System Channel ML23163A2352023-06-12012 June 2023 Request to Use a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for the SPS Sixth Inservice Inspection (Isi) Intervals and VCSNS Fifth ISI Interval ML23159A2332023-06-0808 June 2023 License Amendment Request - Emergency Response Organization Augmentation Time Change, Emergency Operations Facility Relocation and Other Emergency Plan Changes ML23156A3092023-06-0505 June 2023 Requalification Program Inspection Virgil C. Summer Nuclear Station Unit 1 - 05000395/2023003 2024-02-07
[Table view] Category:License-Operator Examination Report
MONTHYEARML23354A1802023-12-20020 December 2023 301 Examination Report with Cover Letter IR 05000395/20213012021-11-0303 November 2021 NRC Operator License Exam Report 05000395/2021301 IR 05000395/20193012020-03-0505 March 2020 NRC Operator License Examination Report 05000395/2019301 ML18211A6422018-07-30030 July 2018 NRC Operator License Examination Report 05000395/2018301 IR 05000395/20173012017-11-16016 November 2017 NRC Operator License Examination Report 05000395/2017301 IR 05000395/20163012016-08-0101 August 2016 Vigil C. Summer Nuclear Station - NRC Operator License Examination Report 05000395/2016301 IR 05000395/20153012015-06-23023 June 2015 Er 05000395/2015301; May 4-8, 2015 & May 20, 2015; Virgil C. Summer Nuclear Station; Operator License Examinations IR 05000395/20133012013-10-21021 October 2013 Er 05000395/13-301; Operating Test, August 19 - 26, 2013, and Written Examination, September 4, 2013; VC Summer; Operator License Examinations ML1134308542011-12-0909 December 2011 Er 05000395-11-301, Operating Test September 12 - 22, 2011, & Written Exam October 21, 2011, V.C. Summer, Operator License Examinations IR 05000395/20093012009-08-21021 August 2009 VC Summer Nuclear Plant - NRC Operator License Examination Report 05000395/2009301 IR 05000395/20073012007-07-24024 July 2007 Er 05000395-07-301, on 06/04-06/07/2007 and 06/13/2007; Virgil C. Summer Nuclear Station; Licensed Operator Examinations IR 05000395/20063012006-11-28028 November 2006 V.C. Summer - Exam Report 05000395/2006301 IR 05000395/20053012006-06-19019 June 2006 NRC Exam Report 05000395/2005301 ML0219000672002-07-0303 July 2002 Response to Regulatory Issue Summary 2002-09, Preparation and Scheduling of Operator Licensing Examinations 2023-12-20
[Table view] |
Text
Stephen A. Byrne Senior Vice President, Nuclear Operations 803.345.4622 July 3, 2002 A SCANA COMPANY Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 Ladies and Gentlemen:
Subject:
VIRGIL C. SUMMER NUCLEAR STATION DOCKET NO. 50/395 OPERATING LICENSE NO. NPF-12 RESPONSE TO REGULATORY ISSUE
SUMMARY
2002-09, PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS Please find attached South Carolina Electric & Gas Company's (SCE&G) anticipated schedule for operator licensing examinations. SCE&G requests that the NRC prepare the examinations on the attachment.
If you have any questions, please contact Mr. Steven Furstenberg at (803) 931-5111.
Very truly yours, Stephen A. Byrne SAB/jwp Attachment c: N. 0. Lorick N. S. Carns T. G. Eppink (w/o attachment)
R. J. White L. A. Reyes K. R. Cotton NRC Resident Inspector K. M. Sutton W. R. Higgins RTS (0-C-02-2018)
File (814.04)
DMS (RC-02-0119) 00i3 SCE&G I Virgil C.Summer Nuclear Station *P. 0. Box 88 .Jenkinsville, South Carolina 29065 *T (803) 345.5209 *www.scano.com
Document Control Desk Attachment 1 RC-02-0119 Page 1 of 1 NRC FORM 538 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB NO. 3150-0131 EXPIRES 07/31/2002 (8-2000) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This OPERATOR LICENSING information collection is used to plan budgets and resources for operator examinations. Send comments EXAMINATION DATA regarding burden estimate to the Records Management Branch (T-6 E6) US Nuclear Regulatory Commission, Washington, DC 20555-0001 or by internet email to bjs 1
@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION Virgil C. Summer Nuclear Station A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 03 CY 04 CY 05 CY 06 ESTIMATED NUMBER OF N/A 0 0 N/A LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF N/A 1 1 N/A NRC-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 03 CY 04 CY 05 CY 06 NUMBER OF REACTOR N/A 6 3 N/A OPERATORS NUMBER OF SENIOR REACTOR N/A 0 0 N/A OPERATORS - INSTANT NUMBER OF SENIOR REACTOR N/A 3 6 N/A OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR N/A 0 0 N/A OPERATORS - LIMITED PROPOSED DATES N/A May 3-May 7 Sept. 12-Sept. 16 N/A PRIMARY DATE N/A May 3-May 7 Sept. 12-Sept. 16 N/A ALTERNATE DATE N/A Apr. 26-Apr. 30 Sept. 19-Sept. 23 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CY 03 CY 04 FIRST SECOND THIRD FIRST SECOND THIRD ESTIMATED NUMBER OF CANDIDATES 0 6 0 0 0 3 NRC FORM 538 (8-2000)