July 11, 2002 Mr. Michael Kansler Sr. Vice President and Chief Operating Officer Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601
SUBJECT:
JAMES A. FITZPATRICK NUCLEAR POWER PLANT - REQUEST FOR ADDITIONAL INFORMATION RELATED TO RELIEF REQUEST NO. 28 (TAC NO. MB3750)
Dear Mr. Kansler:
In reviewing your submittal of May 8, 2002, concerning the subject relief request, the U.S. Nuclear Regulatory Commission (NRC) staff discussed the issue with your staff on June 24, 2002, and outlined additional information that the NRC needs to continue its review.
The information needed was e-mailed to your staff on June 25, 2002, and, as we indicated during our conversation, we are enclosing the request for additional information. Your staff has indicated that you can respond within a short time since you require the relief before your next refueling outage.
Sincerely,
/RA/
Guy S. Vissing, Senior Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation
Enclosure:
As stated cc w/encl: See next page
ML021830041 OFFICE PDI-1/PM PDI-1/LA PDI-1/SC NAME GVissing TClark for SLittle PTam for RLaufer DATE 7/9/02 7/9/02 7/11/02
FitzPatrick Nuclear Power Plant cc:
Mr. Jerry Yelverton Chief Executive Officer Entergy Operations 1340 Echelon Parkway Jackson, MS 39213 Mr. Theodore H. Sullivan Vice President Operations Entergy Nuclear Operations, Inc.
James A. FitzPatrick Nuclear Power Plant P.O. Box 110 Lycoming, NY 13093 Mr. Dan Pace Vice President, Engineering Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. John Kelly Director - Licensing Entergy Nuclear Operations, Inc.
4400 Hamilton Avenue White Plains, NY 10601 Mr. George Tasick Licensing Manager Entergy Nuclear Operations, Inc.
James A. FitzPatrick Nuclear Power Plant P.O. Box 110 Lycoming, NY 13093 Resident Inspectors Office U. S. Nuclear Regulatory Commission P.O. Box 136 Lycoming, NY 13093 Mr. Harry P. Salmon, Jr.
Director of Oversight Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Ms. Charlene D. Faison Licensing Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Supervisor Town of Scriba Route 8, Box 382 Oswego, NY 13126 Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Oswego County Administrator Jack Tierney 46 East Bridge Street Oswego, New York 13126 Mr. William M. Flynn, President New York State Energy, Research, and Development Authority Corporate Plaza West 286 Washington Avenue Extension Albany, NY 12203-6399 Mr. Arthur Zaremba, Licensing Manager Director, Safety Assurance Entergy Nuclear Operations, Inc.
James A. FitzPatrick Nuclear Power Plant P.O. Box 110 Lycoming, NY 13093 Mr. Paul Eddy Electric Division New York State Dept. of Public Service 3 Empire State Plaza, 10th Floor Albany, NY 12223
FitzPatrick Nuclear Power Plant cc:
Michael J. Colomb General Manager Entergy Nuclear Operations, Inc.
James A. FitzPatrick Nuclear Power Plant P.O. Box 110 Lycoming, NY 13093 Mr. James Knubel Vice President, Operations Support Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. John M. Fulton Assistant General Counsel Entergy Nuclear Generation Co.
Pilgrim Station 600 Rocky Hill Road Plymouth, MA 02360 Mr. J. Spath, Program Director New York State Energy, Research, and Development Authority Corporate Plaza West 286 Washington Avenue Extension Albany, NY 12203-6399 Mr. Ronald Schwartz SRC Consultant 64 Walnut Drive Spring Lake Heights, NJ 07762 Mr. Ronald J. Toole SRC Consultant Toole Insight 605 West Horner Street Ebensburg, PA 15931 Mr. Charles W. Hehl SRC Consultant Charles Hehl, Inc.
1486 Matthew Lane Pottstown, PA 19465 Mr. Tim Judson Organizer Citizens Awareness Network 140 Bassett St.
Syracuse, NY 13210 Deborah Katz Executive Director Citizens Awareness Network P.O. Box 83 Shelburne Falls, MA 01370 Shawn McConnell NYPIRG Project Coordinator 13 Hewitt Union SUNY Oswego Oswego, NY 13126 Tom Dellwo Oswego NYPIRG Environmental Project Leader 13 Hewitt Union SUNY Owego Oswego, NY 13126
REQUEST FOR ADDITIONAL INFORMATION JAMES A. FITZPATRICK RELIEF REQUEST NO.28 1.
Code Cases N-513 Evaluation Criteria for Temporary Acceptance of Flaws in Class 3 Piping,Section XI, Division 1" and N-523 Mechanical Clamping Devices for Class 2 and 3 Piping,Section XI, Division 1" and Generic Letter 90-05 Guidance for Performing Temporary Non-Code Repair of ASME Code Class 1, 2 and 3 Piping are available as alternative methods of repair or analytical evaluation of pipe wall thinning or pitting.
Discuss why these alternatives cannot be used in this specific application.
2.
The relief request should:
a) state the specific pipe lines and locations that may be restored using this code case.
b) state the approximate number and size (length, width, thickness) of the overlay repairs.
c) specify that this repair will only be used for one cycle.
3.
To justify the applicability of the weld overlay repair, for one cycle, provide the expected degradation rates for the corresponding degradation mode. Provide past inspection results to support these degradation rate(s).
Enclosure