ML021770426

From kanterella
Jump to navigation Jump to search
May 2002 Monthly Operating Report for Susquehanna Steam Electric Station, Units 1 & 2
ML021770426
Person / Time
Site: Susquehanna  
Issue date: 06/13/2002
From: Richard Anderson
Pennsylvania Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PLA-005493, R41-2A
Download: ML021770426 (7)


Text

Richard L. Anderson Vice President - Nuclear Operations PPL Susquehanna, LLC 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.3883 Fax 570.542.1504 RLAnderson@pplweb.com L

I

"\\

Ifl I

t t

T M

TM June 13, 2002 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station OP 1-17 Washington, D.C. 20555 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 and 50-388/NPF-22 PLA-005493 R41-2A The May 2002 Monthly Operating Reports for Susquehanna SES Units 1 and 1 are attached.

Very truly yours, RicharA L. Anderson JJH/cmm cc: NRC Region 1 NRC Sr. Resident Inspector, Mr. S. Hansell NRC Sr. Project Manager, Mr. T. G. Colburn NRC Project Manager, Mr. E. M. Thomas

-1) 4

OPERATING DATA REPORT DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-387 One 6-13-02 J. J. Hennings (570) 542-3747 OPERATING STATUS

1. Unit Name:

Susquehanna Steam Electric Station (Ul)

2.

Reporting Period:

May 2002

3.

Design Electrical Rating (Net MWe):

1100

4.

Maximum Dependable Capacity (Net MWe):

1090 Hours in Reporting Period Number of Hours Reactor Was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)

This Month 744 744 744 0

818,087

5.
6.
7.
8.

9.

Yr.-to-Date 3623 2425.3 2356.8 0

2,371,491 Cumulative 166,392 136,727.5 134,516.8 0

137,598,400 NOTES:

Page 1 of 1

UNIT SHUTDOWNS DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-387 One 6-13-02 J. J. Hennings (570) 542-3747 REPORT MONTH May 2002 No.

Date Type Duration Reason Method of Cause & Corrective Action I

(Hours) 2 Shutting To Prevent Recurrence Down Reactor 3

No Shutdowns this month.

Summary:

Unit 1 remained at full power for the month of May. Operational testing of Unit 1 was performed on May 30, to allow operation at the new uprated Reactor power of 3489 MWth.

2.

Reason:

A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)

3.

Method:

1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other I.

F. Forced S. Scheduled Page 1 of 1

SUSQUEHANNA STEAM ELECTRIC STATION Docket Number:

50-387 Date:

6-13-02 Completed by:

J. J. Hennings Telephone:

(570) 542-3747 Challenges to Main Steam Safety Relief Valves None.

OPERATING DATA REPORT DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 6-13-02 J. J. Hennings (570) 542-3747 OPERATING STATUS

1. Unit Name:

Susquehanna Steam Electric Station (U2)

2.

Reporting Period:

May 2002

3.

Design Electrical Rating (Net MWe):

1117

4.

Maximum Dependable Capacity (Net MWe):

1111 Hours in Reporting Period Number of Hours Reactor Was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)

This Month 744 744 744 0

826,905 Yr.-to-Date 3623 3623 3623 0

4,014,912

5.
6.
7.
8.

9.

Cumulative 151,632 131,280.0 129,389.7 0

134,819,742 NOTES:

Page 1 of 1

UNIT SHUTDOWNS DOCKET NO.

50-388 UNIT Two DATE 6-13-02 COMPLETED BY J. J. Hennings TELEPHONE (570) 542-3747 REPORT MONTH May 2002

1.
2.

3.

Reason:

A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)

Method:

1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other No.

Date Type Duration Reason Method of Cause & Corrective Action I

(Hours) 2 Shutting to Prevent Recurrence Down Reactor 3

No Shutdowns this month.

F. Forced S. Scheduled Page 1 of 1

SUSQUEHANNA STEAM ELECTRIC STATION Docket Number:

50-388 Date:

6-13-02 Completed by:

J. J. Hennings Telephone:

(570) 542-3747 Challenges to Main Steam Safety Relief Valves None.