ML021750046

From kanterella
Jump to navigation Jump to search
30 Day Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation & Reactor Coolant Pressure Boundary Integrity
ML021750046
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 06/13/2002
From: Blevins M, Terry C
TXU Energy
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
10119, BL-01-001, BL-02-001, CPSES-200202442, TXX-02112
Download: ML021750046 (2)


Text

UATXU TXU Energy C. Lance Terry Comanche Peak Steam Senior Vice President &

Ref: 10 CFR 50.54(f)

Electric Station Principal Nuclear Officer P.O. Box 1002 (E01)

Glen Rose, TX 76043 Tel: 254 897 8920 Fax: 254 897 6652 lance.terry@txu.com CPSES-200202442 Log #

TXX-02112 File #

10119 June 13, 2002 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 30 DAY RESPONSE TO NRC BULLETIN 2002-01, "REACTOR PRESSURE VESSEL HEAD DEGRADATION AND REACTOR COOLANT PRESSURE BOUNDARY INTEGRITY" REF:

Letter logged TXX-02103 from C. L. Terry to the NRC dated June 3, 2002 Gentlemen:

In accordance with 10CFR50.54(f), TXU Generation Company LP (TXU Energy) supplements the 30 day response to U.S. Nuclear Regulatory Commission (NRC)Bulletin 2002-01, "Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity" dated March 18, 2002.

The referenced letter responded to NRC Bulletin 2002-01 providing the information required 30 days after plant restart for Unit 2. The referenced letter also provided the information for Unit 2 requested by item 5 of U. S. Nuclear Regulatory Commission (NRC)Bulletin 2001-01, "Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles".

This letter supplements the response to NRC Bulletin 2002-01 (referenced) to clarify that the response provided satisfies the required information of item 5 of /

NRC Bulletin 2001-01.

-C

'i

f TXU TXX-02112 Page 2 of 2 If you should have any questions regarding this submittal, please call Mr. J. D. Seawright at (254) 897-0140 (Email -jseawright@txu.com).

No new commitments are identified in this letter.

I state under penalty of perjury that the foregoing is true and correct.

Executed on June 13, 2002.

Sincerely, TXU Generation Company LP By:

TXU Generation Management Company LLC, Its General Partner C. L. Terry Senior Vice President and Principal Nuclear Officer By M. R. Blevins VP & Deputy to Senior VP &

Principal Nuclear Officer JDS/js c -

E. W. Merschoff, Region IV W. D. Johnson, Region IV D. H. Jaffe, NRR Resident Inspectors, CPSES