Entergy Entergy Nuclear Generation Company Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 Charles M. Dugger Vice President - Operations June 12, 2002 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Mail Stop O-P1-17 Washington, DC 20555-0001
SUBJECT:
Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station Docket No. 50-293 License No. DPR-35 Supplemental Response to Issuance of Order for Interim Safeguards and Security Compensatory Measures
REFERENCES:
- 1. NRC letter to Michael R. Kansler from Samuel J. Collins dated February 25, 2002,regarding "Issuance of Order for Interim Safeguards and Security Compensatory Measures" for Pilgrim Nuclear Power Station
- 2. Entergy letter to USNRC, dated March 18, 2002 (Letter No. 2.02.024) regarding "Response to Issuance of Order for Interim Safeguards and Security Compensatory Measures"
- 3. Entergy letter to USNRC, dated March 18, 2002 (Letter No. 2.02.023) regarding "Request for an Extension of Time to Submit an Answer and Request for Hearing" LETTER NUMBER:
2.02.054
Dear Sir or Madam:
The previous response (Reference 2) regarding Interim Compensatory Measures (ICMs)
B.2.a(1), B.2.a(2) and B.2.b identified that the evaluation required by these ICMs had been initiated but could not be completed in time to support the order response date. A request for an extension of time to submit an answer and request a hearing was submitted (Reference 3).
The evaluation for which the request was submitted would determine if Pilgrim Station could meet the intent of the ICMs or could provide improvements that would meet the intent of the ICMs and the compliance date in the Order.
The evaluation has been completed and necessary improvements are being implemented.
Necessary actions to meet the requirements of B.2.a.(1), B.2.a(2) and B.2.b will be implemented by August 31, 2002. A request for a hearing (Reference 2) will not be required.
202054
Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station Letter Number 2.02.054 Page 2 As required by Condition C.2 of the Order, Entergy will notify the Commission when full compliance has been achieved.
If you have any questions or require additional information, please contact Mr. Bryan Ford at (508) 830-8403.
I declare under penalty of perjury that the foregoing is true and correct. Executed on the 12th day of June 2002.
Attachment:
None cc:
Mr. Samuel J. Collins, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 05-E-07 Washington, DC 20555-0001 Secretary Office of the Secretary U.S. Nuclear Regulatory Commission ATTN: Rulemakings and Adjudications Staff Washington, DC 20555-0001 Mr. Dennis C. Dambly Assistant General Counsel for Materials Litigation and Enforcement U.S. Nuclear Regulatory Commission Mail Stop 15-D-21 Washington, DC 20555-0001 Mr. Hubert Miller Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. Travis L. Tate, Project Manager Project Directorate I Division of Licensing Project Management U.S. Nuclear Regulatory Commission Mail Stop 0-8-BlA Washington, DC 20555-0001 Senior Resident Inspector, M/S 66 Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 202054