FENOC Perry Nuclear Power Plant "10 Center Road PO. Box 97 FirstEnergy Nuclear Operating Company Perry, Ohio 44081 June 13, 2002 PY-CEI/NRR-2647L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C.
20555 Perry Nuclear Power Plant Docket No. 50-440 License No. NPF-58 Monthly Operating Report Ladies and Gentlemen:
Attached is the May 2002 Monthly Operating Report for Perry Unit 1. Page 1 is the Operating Data Report and page 2 is the Unit Shutdowns Report. This report is submitted in accordance with Technical Specification 5.6.4 and Generic Letter 97-02, "Revised Contents of the Monthly Operating Report."
If you have questions or require additional information, please contact Ms. Toni Phelps at (440) 280-7660.
Very truly yours, Gregory A. Dunn Manager - Regulatory Affairs Attachment cc: NRC Region III Administrator NRC Project Manager NRC Resident Inspector
OPERATING DATA REPORT UNIT:
Perry DATE:
6/9/02
- 1.
Docket: 50-440
- 2.
Unit Name:
Perry Nuclear Power Plant
- 3.
Reporting Period: May 2002
- 4.
Utility
Contact:
T. Phelps
- 5.
Telephone: 440-280-7660
- 6.
Design Electrical Rating (Net MWe):
1260*
- 7.
Maximum Dependable Capacity (Net MWe):
1235**
This Month Yr-to-Date Cumulative
- 8.
Hours Reactor was Critical 744.0 3,623.0 100,208.2
- 9.
Hours Generator On-Line 744.0 3,623.0 97,696.0
- 10.
Unit Reserve Shutdown Hours
- 11.
Net Electrical Energy (MWeH)
The New Design Electrical Rating i The new MDC was effective April 1
- A new Design Electrical Rating i,
- The new MDC is 1235 MWe 0.0 0.0 0.0 930,813.0 4,488,205.0 111,088,607.0 s based on the 105% uprate which was completed April of 2001.
,2001.
based on new net generation definitions Page 1
UNIT SHUTDOWNS REPORT MONTH - MAY 2002 DOCKET NO: 50-440 NAME: Perry Nuclear Power Plant DATE: 06/09/02 CONTACT: T. Phelis TELEPHONE: (440) 280-7660 No.
Date Type Duration Reason Method Cause and Corrective Action to Prevent Recurrence 1
Hours 2
3
SUMMARY
- The Perry Plant remained on line the entire month.
- 1. TYPE:
F: Forced S: Scheduled
- 2. REASON:
A - Equipment Failure (explain)
B - Maintenance or Test C - Refueling D - Regulatory E - Operating Training &
License Examination F - Administrative G - Operational Error (explain)
H - Other (explain)
- 3. METHOD:
1-Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation 5 - Other Page 2