May 2002 Monthly Operating Report for Limerick Generating Station, Units1 and 2
ML021720407
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 06/12/2002
From: Braun R
Exelon Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002
Download: ML021720407 (3)


Text

Exekoni.

Exelon Nuclear Limerick Generating Station P.O. Box 2300 Sanatoga, PA 19464 www.exeloncorp.com Nuclear T.S. 6.9.1.6 June 12, 2002 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353

Subject:

Monthly Operating Reports for May 2002 Enclosed are the monthly operating reports for Limerick Units 1 and 2 for the month of May 2002 forwarded pursuant to Technical Specification 6.9.1.6 and the guidance of GL 97-02.

If you have any questions or require additional information, please do not hesitate to contact us.

Sincerely, Robert C. Braun Plant Manager Attachments cc:

H. J. Miller, Administrator, Region I, USNRC A. L. Burritt, LGS USNRC Senior Resident Inspector

Limerick 1 50-352 6/12/02 by: Greg Lee (610)718-3707 A. OPERATING DATA REPORT REPORTING PERIOD-May 2002 Design Electrical Rating (MWe-Net) 11191 Maximum Dependable Capacity (MWe-Net) 1134 Cumulative Hours Reactor Critical (Hours) 659.7 3,176.2 124,731.4 Hours Generator On-Line (Hours) 644.8 3,108.0 122,772.1 Unit.Reserve Shutdown Hours (Hours) 0.0 0.0 0.0 Net Electrical Energy (MWh) 712,656 3,357,788 125,839,787 B.

UNIT SHUTDOWN Unit 1 ended the month of May 2002 at 100% RTP.

Type F-Forced S-Scheduled Reason A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training/License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

Method 1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation 5-Other (Explain)

C. SAFETY/RELIEF VALVE OPERATION Unit:

Docket No:

Date:

Completed Telephone:

Month Year to Date No.

Date Type Duration Reason Method Corrective Actions/Comments (yymmdd)

(Hours) 2 020519 F

99.2 A

3 1 F37-Turbine trip due to high turbine thrust bearing wear detector failure.

SUMMARY

Unit 1 began the month of May 2002 at 100% of rated thermal power (RTP).

On May 18th at 22:00 hours, commenced power reduction to 94% RTP to perform MSIV and turbine valve testing.

On May 1 9 th at 00:54 hours, the turbine tripped, and the reactor automatically scrammed due to high turbine thrust bearing wear detector failure.

On May 2 2 nd at 13:14 hours, reactor criticality was achieved.

On May 2 3 rd at 04:05 hours, the main generator was synchronized to the grid.

On May 2 61h at 10:05 hours, reactor power was reduced from 94% RTP to 65% RTP for rod pattern adjustment. Power ascension was reestablished at 13:10 hours.

On May 2 7 th at 22:58 hours, reactor power was restored to 100% RTP.

Date Valves Actuated No. & Type of Actuation I Plant Condition I Description of Event None During May

Unit:

Limerick 2 Docket No:

50-353 Date:

6/12/02 Completed by: Greg Lee Telephone:

(610)718-3707 A.

OPERATING DATA REPORT REPORTING PERIOD-May 2002 Design Electrical Rating (MWe-Net) 1191 Maximum Dependable Capacity (MWe-Net) 1134 Month Year to Date Cumulative Hours Reactor Critical (Hours) 744.0 3,623.0 101,056.0 Hours Generator On-Line (Hours) 744.0 3,623.0 99,385.9 Unit Reserve Shutdown Hours (Hours) 0.0 0.0 0.0 Net Electrical Energy (MWh) 841,484 4,213,317 105,838,041 B.

UNIT SHUTDOWN On May 2 8th at 19:40 hours, reactor power was restored to 100% RTP.

Unit 2 ended the month of May 2002 at 100% RTP.

Type Reason Method F-Forced A-Equipment Failure (Explain) 1-Manual S-Scheduled B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation E-Operator Training/License Examination 5-Other (Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

C. SAFETY/RELIEF VALVE OPERATION Date I Valves Actuated No. & Type of Actuation I Plant Condition I Description of Event None During May I

I No.

Date Type Duration Reason Method Corrective ActionslComments (yymmdd)

(Hours)

None During May

SUMMARY

Unit 2 began the month of May 2002 at 100% of rated thermal power (RTP).

On May 24t1 at 22:08 hours, commenced power reduction to 57% RTP to perform MSIV & turbine valve testing, and condenser waterbox cleaning.

On May 2 7th at 17:50 hours, reactor power was restored to 100% RTP.

On May 2 7 th at 22:35 hours, commenced power reduction to 80% RTP to repair the limit switch on MSV# 2.