J. Barnie Beasley, Jr., P.E.
Vice President Vogtle Project Southern Nuclear Operating Company, Inc.
40 Inverness Center Parkway P.O. Box 1295 Birmingham, Alabama 35201 Tel 205.992.7110 Fax 205.992.0403 SOUTHERNAM COMPANY Energy to Serve Your World*
LCV-1 593-E June 12, 2002 Docket Nos.
50-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:
VOGTLE ELECTRIC GENERATING PLANT MONTHLY OPERATING REPORT - MAY 2002 Enclosed are the May 2002 monthly operating reports for Vogtle Electric Generating Plant (VEGP) Units 1 and 2. These reports are submitted in accordance with the Technical Specification 5.6.4.
Sincerely, JBB/JLL Enclosures El-VEGP Unit 1 Monthly Operating Report - May 2002 E2-VEGP Unit 2 Monthly Operating Report - May 2002 cc:
Southern Nuclear Operating Company Mr. M. Sheibani SNC Document Management U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Mr. F. Rinaldi, Project Manager, NRR Mr. J. Zeiler, Senior Resident Inspector, Vogtle
ENCLOSURE 1 VOGTLE ELECTRIC GENERATING PLANT - UNIT 1 MONTHLY OPERATING REPORT FOR MAY 2002 TABLE OF CONTENTS OPERATING DATA REPORT and CHALLENGES to PORV and SAFETY VALVES Page El-i UNIT SHUTDOWNS and NARRATIVE REPORT Page E1-2
OPERATING DATA REPORT Docket No.:
Unit Name:
Date:
Completed By:
Telephone:
50-424 VEGP UNIT 1 June 1, 2002 Andrew R. Cato (706) 826-3823 Operating Status
- 1. Reporting Period:
- 2. Design Electrical Rating (Net MWe):
- 3. Maximum Dependable Capacity (Net MWe):
May - 2002 1169 1148 This Month
- 4.
- 5.
- 6.
7.
Number Of Hours Reactor Was Critical:
Hours Generator On Line:
Unit Reserve Shutdown Hours:
Net Electrical Energy Generated (MWHe):
744.0 744.0 0.0 877,603 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date Tag No.
Event Description N/A N/A N/A E1-1 Year To Date 2575.0 2513.1 0.0 2,901,832 Cumulative 117,184.5 115,665.7 0.0 129,347,898
UNIT SHUTDOWNS Docket No.:
Unit Name:
Date:
Completed By:
Telephone:
50-424 VEGP UNIT I June 1, 2002 Andrew R. Cato (706) 826-3823 Reporting Period:
May - 2002 Type Method of F: Forced Duration Shutting Cause/Corrective No.
Date S: Scheduled (Hours)
Reason (1)
Down (2)
Actions Comments N/A N/A N/A N/A N/A N/A N/A (1) REASON:
(2) METHOD:
A - Equipment Failure (Explain)
E - Operator Training/License Examination
- 1. Manual
- 4. Continuation B - Maintenance or Test F - Administrative
- 2. Manual Trip/Scram 5. Other C - Refueling G - Operational Error (Explain)
- 3. Automatic Trip/Scram D - Regulatory Restriction H - Other (Explain)
CAUSEICORRECTIVE ACTIONICOMMENTS:
EVENT CAUSE:
CORRECTIVE ACTION:
CRITICAL PATH WAS:
NARRATIVE REPORT May 01, 2002 00:00 Unit I at 100% power with no significant operating problems.
May 31, 2002 23:59 Unit I at 100% power with no significant operating problems.
E1-2
ENCLOSURE 2 VOGTLE ELECTRIC GENERATING PLANT - UNIT 2 MONTHLY OPERATING REPORT FOR MAY 2002 TABLE OF CONTENTS OPERATING DATA REPORT and CHALLENGES to PORV and SAFETY VALVES Page E2-1 UNIT SHUTDOWNS and NARRATIVE REPORT Page E2-2
OPERATING DATA REPORT Docket No.:
Unit Name:
Date:
Completed By:
Telephone:
50-425 VEGP UNIT 2 June 1, 2002 Andrew R. Cato (706) 826-3823 Operating Status
- 1. Reporting Period:
- 2. Design Electrical Rating (Net MWe):
- 3. Maximum Dependable Capacity (Net MWe):
- 4. Number Of Hours Reactor Was Critical:
- 5. Hours Generator On Line:
- 6. Unit Reserve Shutdown Hours:
- 7. Net Electrical Energy Generated (MWHe):
May-2002 1169 1149 This Month 744.0 744.0 0.0 871,209 Year To Date 3623.0 3623.0 0.0 4,275,734 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date Tag No.
Event Description N/A N/A N/A E2-1 Cumulative 104,676.8 103,863.7 0.0 117,068,200
UNIT SHUTDOWNS Docket No.:
Unit Name:
Date:
Completed By:
Telephone:
50-425 VEGP UNIT 2 June 1, 2002 Andrew R. Cato (706) 826-3823 Reporting Period:
May - 2002 Type Method of F: Forced Duration Shutting Cause/Corrective No.
Date S: Scheduled (Hours)
Reason (1)
Down (2)
Actions Comments N/A N/A N/A N/A N/A N/A N/A (1) REASON:
(2) METHOD:
A - Equipment Failure (Explain)
E - Operator Training/License Examination
- 1. Manual
- 4. Continuation B - Maintenance or Test F - Administrative
- 2. Manual Trip/Scram5. Other C - Refueling G - Operational Error (Explain)
- 3. Automatic Trip/Scram D - Regulatory Restriction H - Other (Explain)
CAUSE/CORRECTIVE ACTIONICOMMENTS:
EVENT CAUSE:
CORRECTIVE ACTION:
CRITICAL PATH WAS:
NARRATIVE REPORT May 01, 2002 00:00 Unit 2 at 100% power with no significant operating problems.
May 31, 2002 23:59 Unit 2 at 100% power with no significant operating problems.
E2-2